Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- GNRO-2018/00002, Nuclear. Station, Unit 1 - Supplemental Letter to License Amendment Request to Incorporate Tornado Missile Risk Evaluator Into Licensing Basis Supplement Regarding De Minimis Penetrations + (09:51:16, 7 January 2025)
- ML18022A597 + (09:51:17, 7 January 2025)
- IR 05000400/1987042 + (09:51:18, 7 January 2025)
- ML18022A594 + (09:51:19, 7 January 2025)
- ML18022A593 + (09:51:20, 7 January 2025)
- ML18022A591 + (09:51:20, 7 January 2025)
- IR 05000400/1987039 + (09:51:22, 7 January 2025)
- ML18022A585 + (09:51:23, 7 January 2025)
- 05000400/LER-1987-049, :on 870925,operating Main Feedwater Pump Tripped on Low Flow.Caused by High Vibration in Recirculation Piping.Valve Stem Replaced & Recirculation Valve Returned to Svc on 870925 + (09:51:24, 7 January 2025)
- ML18022A583 + (09:51:25, 7 January 2025)
- IR 05000400/1987034 + (09:51:29, 7 January 2025)
- ML18022A580 + (09:51:31, 7 January 2025)
- ML18022A574 + (09:51:32, 7 January 2025)
- ML18022A575 + (09:51:32, 7 January 2025)
- ML18022A573 + (09:51:33, 7 January 2025)
- ML18022A572 + (09:51:33, 7 January 2025)
- 05000400/LER-1987-051, :on 870831,main Feedwater Pump a Tripped Due to Feedwater Oscillation.Caused by Feedwater Sys Design Problems.Valve Stem Repaired & Feedwater Sys Changes to Improve Reliability Under Evaluation + (09:51:38, 7 January 2025)
- ML18022A568 + (09:51:40, 7 January 2025)
- ML18022A563 + (09:51:41, 7 January 2025)
- 05000400/LER-1987-044, :on 870713,Tech Spec Surveillance for Axial Flux Difference Missed.Caused by Personnel Error.Operator Counseled.Repairs in Progress to Repair Automatic Axial Flux Difference Monitor + (09:51:43, 7 January 2025)
- IR 05000400/1987029 + (09:51:44, 7 January 2025)
- ML18022A559 + (09:51:45, 7 January 2025)
- ML18022A558 + (09:51:46, 7 January 2025)
- 05000400/LER-1987-042, :on 870709,wrong Fuses Pulled During Process of Placing Clearance OP-87-1290 Resulting in Automatic Reactor/ Turbine Trip.Caused by Personnel Error.Operator Training Conducted Re Fuse Labeling Conventions + (09:51:48, 7 January 2025)
- IR 05000400/1987026 + (09:51:55, 7 January 2025)
- ML18022A554 + (09:51:56, 7 January 2025)
- ML18022A552 + (09:51:57, 7 January 2025)
- ML18022A551 + (09:51:59, 7 January 2025)
- IR 05000400/1987027 + (09:52:02, 7 January 2025)
- ML18022A548 + (09:52:03, 7 January 2025)
- IR 05000400/1987023 + (09:52:05, 7 January 2025)
- ML18022A543 + (09:52:06, 7 January 2025)
- ML18022A542 + (09:52:07, 7 January 2025)
- IR 05000400/1986077 + (09:52:08, 7 January 2025)
- 05000400/LER-1987-029, :on 870428,engineer Determined That Snubber Found Damaged on 870422 Per Required Action of Tech Spec. Snubber Damaged Due to Water Hammer Occurring When Valve Isolated.Snubber Replaced + (09:52:13, 7 January 2025)
- ML18022A539 + (09:52:14, 7 January 2025)
- ML18022A536 + (09:52:14, 7 January 2025)
- ML18022A535 + (09:52:15, 7 January 2025)
- ML18022A533 + (09:52:16, 7 January 2025)
- ML18022A529 + (09:52:16, 7 January 2025)
- IR 05000400/1987018 + (09:52:18, 7 January 2025)
- ML18022A526 + (09:52:19, 7 January 2025)
- 05000400/LER-1987-020, :on 870413,reactor Trip Setpoints on All Three Overtemp Delta Temp (Odt) Bistables Incorrectly Set.Caused by Apparent Design Oversight in Odt Circuit Design & Vendor Testing Methodology.Test Procedures Revised + (09:52:21, 7 January 2025)
- ML18022A524 + (09:52:22, 7 January 2025)
- ML18022A522 + (09:52:22, 7 January 2025)
- ML18022A521 + (09:52:23, 7 January 2025)
- ML18022A518 + (09:52:24, 7 January 2025)
- ML18022A515 + (09:52:25, 7 January 2025)
- ML18022A517 + (09:52:25, 7 January 2025)
- RAIO-0118-58190, LLC Supplemental Response to NRC Request for Additional Information No. 58 (Erai No. 8835) on the NuScale Design Certification Application + (09:52:26, 7 January 2025)
- 05000400/LER-1987-022, :on 870402,Tech Spec 3.3.3.10 Discovered Violated Due to Flow Estimates Taken at Beginning & End of Radioactive Releases on 870327,28 & 0401 Instead of Every 4 H.Caused by Inoperable Flow Rate Instrument + (09:52:29, 7 January 2025)