Forwards Insp Rept 50-400/87-23 on 870706-10.No Violations or Deviations Noted
ML18022A543
Person / Time
Site: Harris 
Issue date: 08/05/1987
From: Herdt A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Utley E
CAROLINA POWER & LIGHT CO.
Shared Package
ML18022A545 List:
References
NUDOCS 8708100429
Download: ML18022A543 (4)


See also: IR 05000400/1987023

Text

~~4

'CCESSION

NBR:

FAC IL:50-400

AUTH. NAME

HERDTi A. R.

REC IP. NAME

UTLEYE E. E;

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

870810042'P

DOC. DATE: 87/08/05

NOTARIZED:

NO

Shearon

Harris Nuclear

Power Planti Unit ii Carolina

AUTHOR AFFILIATION

Region 2i Office of Director

REClPIENT AFFILIATION

Carolina

Power

5 Light Co.

DOCKET 5

05000400

SUBJECT:

Forwards

Insp Rept 50-400/87-23

on 870706-10. No violations

or deviations

noted.

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED: LTR

ENCL

~

SIZE: (2 + J()

TITLE: General

(50 Dkt)-Insp Rept/Notice of Violation Response

NOTES: Application for permit renewal filed.

05000400

REC IP IENT

ID CODE/NAME

PD2-1

PD

COP IES

LTTR ENCL

1

1

RECIPIENT

ID CODE/NAME

BUCKLEY. B

COPIES

LTTR ENCL

2

2

INTERNAL: ACRS

DEDRO

NRR/DOEA DIR

NRR/DREP /RP B

NRR/P MAS/ILRB

OGC/HDSi

RES

DEPY GI

EXTERNAL:

LPDR

NSIC

2

2

1

1

2

2

1

1

1

1

1

1

1

AEOD

NRR MORISSEAUI D

NRR/DREP/EPB

NRR/DRIS DIR

RMANZ J

REG FILE

GN2

E

01

NRC

PDR

1

1

1

1

1

1

1

1

1

0

TOTAL NUMBER OF

COP IES REQUIRED:

LTTR

22

ENCL

22

Docket No. 50-400

License

No.

NPF-63

C~lina Power and Light Company

4CTN:

Nr.

E.

E. Utley

Senior Executive Vice President

Power Supply and Engineering

and Construction

P.

O.

Box 1551

Raleigh,

NC

27602

Gentlemen:

SUBJECT:

NRC INSPECTION

REPORT

NO. 50-400/87-23

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

R.

M. Newsome

on July 6-10,

1987.

The

inspection

included

a

review

of

activities

authorized

for your Harris facility.

At the

conclusion

of the

inspection,

the findings

were

discussed

with those

members

of your staff

identified in the enclosed

inspection report.

'

Areas

examined

during

the

inspection

are

identified in the report.

Mithin

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities in progress.

Mithin the scope of the inspection,

no violations or deviations

were identified.

In accordance

with Section

2.790 of the

NRC's "Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosure

will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

Enclosure:

NRC Inspection

Report

cc. w/encl:

(See

page

2)

Alan R. Hendt, Chief

Engineering

Br anch

Division of Reactor Safety

8708i00429

870805

PDR

ADOCN, 05000400

G

PDR

Carolina

Power and Light Company

gUg P

5

198'g,

w/encl:

K. A. Watson,

Vice President

Harris Nuclear Project

C. L. Tibbitts, Director of Regulatory

ompliance

. L. Willis, Plant General

Manager

bcg w/encl:

L8'. Barth,

OGC

C Resident

Inspector

~ 'Upchurch,

Chairman, Triangle J

Council of Governments

Document Control

Desk

State of North Carolina

RII

WNewsome:lb

07M/87