ML18022A543
| ML18022A543 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 08/05/1987 |
| From: | Herdt A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Utley E CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML18022A545 | List: |
| References | |
| NUDOCS 8708100429 | |
| Download: ML18022A543 (4) | |
See also: IR 05000400/1987023
Text
~~4
'CCESSION
NBR:
FAC IL:50-400
AUTH. NAME
HERDTi A. R.
REC IP. NAME
UTLEYE E. E;
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
870810042'P
DOC. DATE: 87/08/05
NOTARIZED:
NO
Shearon
Harris Nuclear
Power Planti Unit ii Carolina
AUTHOR AFFILIATION
Region 2i Office of Director
REClPIENT AFFILIATION
Carolina
Power
5 Light Co.
DOCKET 5
05000400
SUBJECT:
Forwards
Insp Rept 50-400/87-23
on 870706-10. No violations
or deviations
noted.
DISTRIBUTION CODE:
IEOID
COPIES
RECEIVED: LTR
ENCL
~
SIZE: (2 + J()
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES: Application for permit renewal filed.
05000400
REC IP IENT
ID CODE/NAME
PD2-1
COP IES
LTTR ENCL
1
1
RECIPIENT
ID CODE/NAME
BUCKLEY. B
COPIES
LTTR ENCL
2
2
INTERNAL: ACRS
DEDRO
NRR/DOEA DIR
NRR/DREP /RP B
NRR/P MAS/ILRB
OGC/HDSi
DEPY GI
EXTERNAL:
LPDR
2
2
1
1
2
2
1
1
1
1
1
1
1
NRR MORISSEAUI D
NRR/DREP/EPB
NRR/DRIS DIR
RMANZ J
REG FILE
GN2
E
01
NRC
1
1
1
1
1
1
1
1
1
0
TOTAL NUMBER OF
COP IES REQUIRED:
LTTR
22
ENCL
22
Docket No. 50-400
License
No.
C~lina Power and Light Company
4CTN:
Nr.
E.
E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P.
O.
Box 1551
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
NRC INSPECTION
REPORT
NO. 50-400/87-23
This refers to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
R.
M. Newsome
on July 6-10,
1987.
The
inspection
included
a
review
of
activities
authorized
for your Harris facility.
At the
conclusion
of the
inspection,
the findings
were
discussed
with those
members
of your staff
identified in the enclosed
inspection report.
'
Areas
examined
during
the
inspection
are
identified in the report.
Mithin
these
areas,
the inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and
observation
of
activities in progress.
Mithin the scope of the inspection,
no violations or deviations
were identified.
In accordance
with Section
2.790 of the
NRC's "Rules of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and its enclosure
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this letter,
please
contact
us.
Sincerely,
Enclosure:
NRC Inspection
Report
cc. w/encl:
(See
page
2)
Alan R. Hendt, Chief
Engineering
Br anch
Division of Reactor Safety
8708i00429
870805
ADOCN, 05000400
G
Carolina
Power and Light Company
gUg P
5
198'g,
w/encl:
K. A. Watson,
Vice President
Harris Nuclear Project
C. L. Tibbitts, Director of Regulatory
ompliance
. L. Willis, Plant General
Manager
bcg w/encl:
L8'. Barth,
C Resident
Inspector
~ 'Upchurch,
Chairman, Triangle J
Council of Governments
Document Control
Desk
State of North Carolina
RII
WNewsome:lb
07M/87