REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
, ~
ACCESSION
NBR: 8710260311
DOC. DATE: 87/10/14
NOTARIZED:
NO
FACIL: 50-400 Shearon
Harris Nuclear
Power Planti Unit ii Carolina
AUTH. NAME
AUTHOR AFFILIATION
REYESi L. A.
Region
2i
Ofc of Director
REC IP. NAME
RECIPIENT AFFILIATION
UTLEYi E. E.
Carolina
Power
5 Light Co.
DOCKET
05000400
SUBJECT:
Foreards
Insp 'Rept 50-400/87-34
on 870820-0924. Violation
under consideration
h no notice of violation under
isuesd
at this time. Characterization
of violation may
change
as
result of further
NRC review.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED: LTR J
ENCL J
SIZE: ~+
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES: Application for permit reneeal filed.
05000400
RECIPIENT
ID CODE/NAME
PD2-1
INTERNAL: AEOD
MOR ISSEAUi D
NRR/DREP/EPB
NRR/DRIS DIR
OE~B
N) J
2
FILE"
01
TERNAL:
LPDR
COP IES
LTTR ENCL
1
1
REC IP IENT
ID CODE/NAME
BUCKLEY> B
DEDRO
NRR/DOEA DIR
NRR/DREP/RPB
NRR/PMAS/ ILRB
OGC/HDS1
DEPY GI
NRC
COPIES
LTTR ENCL
2
2
1
1
1
1
2
2
1
1
1
1
1
1
1
1
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
20
ENCL
20
OCT 14'987
Carolina
Power
and Light Company
ATTN:
Mr.
E.
E. Utley
Senior Executive Vice President
Power Supply
and Engineering
and Construction
P.
O.
Box 1551
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
INSPECTION
REPORT
NO. 50-400/87-34
gp
l
This refers to the Nuclear
Regulatory
Commission
(NRC) inspection
conducted
by
G.
F. Maxwell
on August 20
September
24,
1987.
The
inspection
included
a
review of activities authorized for your Harris facility. At the conclusion of
the inspection,
the findings were discussed
with those
members
of your staff
identified in the enclosed
inspection report.
Areas
examined
during
the
inspection
are
identified in the report.
Within
these
areas,
the inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and
observation
of
activities in progress.
The violation described
in the
enclosed
report is
under
consideration
for
escalated
enforcement
action.
Accordingly,
no Notice of Violation is being
issued
at this time,
and
no response
to this letter is 'required.
However,
please
be advised
that tne characterization
of the violation described
in the
enclosed
inspection report
may change
as
a result of further
NRC review.
You
will be advised
by separate
correspondence
of the result of our deliberations
on this matter.
In accordance
with Section
2.790 of the
NRC's
"Rules of Practice,"
Part
2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and its enclosures
will be placed in the
NRC Public Document
Room.
The responses
directed
by this letter and its enclosures
are. not subject to the
clearance
procedures
of the Office of Management
and Budget
as required
by. the
Paperwork
Reduction Act of 1980,
PL 96-511.
Should you have
any questions
concerning this letter,
please
contact us.
87 10260311
5000400
7101<
pDR
ADOCK 0
pDR
8
Sincerely,
<+ay I&iAc. &Ipl~
~
~.gw~e<<'ui
s A. Reyes,
Director
Division of Reactor Projects
Enclosure:
(See
page
2)
OCT 14
1987
'
Carolina
Power
and Light Company
Enclosure:
Inspection
Report
cc w/encl:
R. A. Watson,
Vice President
Harris Nuclear Project
D.
L. Tibbitts, Director of Regulatory
Compliance
J.
L. Willis, Plant General
Manager
bcc w/encls:
Document Control
Desk
State of North Carolina
NRC Resident
Inspector
IK
(=i()I1
RII q pl
EFredr i ckson: tj
10/ih/87
RIIy
DMVerre 1 1 i
10/g/87
RII@
VBrownlee
10//f/87
GRJen
ns
10/I4/87