ML18022A559
| ML18022A559 | |
| Person / Time | |
|---|---|
| Site: | Harris |
| Issue date: | 08/04/1987 |
| From: | Cline W NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Utley E Carolina Power & Light Co |
| Shared Package | |
| ML18022A560 | List: |
| References | |
| NUDOCS 8708170426 | |
| Download: ML18022A559 (4) | |
See also: IR 05000400/1987029
Text
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION
NBR: 8708170426
DOC. DATE: 87/08/04
NOTARIZED:
NO
FACIL: 50-400 Shearon
Harris Nuclear
Power Planti Unit ii Carolina
AUTH. NAME
AUTHOR AFFILIATION
CLINEz W. E.
Region
2i Office of Director
REC IP. NAME
RECIPIENT AFFILIATION
UTLEYz~E. E.
Carolina
Power
8c Light Co.
SUBJECT:
Forwards
Insp
Rept 50-400/87-2V
on 870713-17.
No violations
or deviations
noted.
DOCKET
05000400
DISTRIBUTION CODE:
IE04D
COPIES
RECEIVED: LTR + ENCL
t
SIZE t2
4'ITLE:
Safeguards
Inspection
Rpt/NOV Response
(50 DKT)-Publicly Available
NOTES: Application for permit renewal filed.
05000400
RECIPIENT
ID CODE/NAME
PD2-1 L*
BUCKLEY'S B
INTERNAL:
NRR/DR IS/SGB
NRR/PMAS/ILRB
RGN2
FILE
01
EXTERNAL:
LPDR
COPIES
LTTR ENCL
1
0
1
1
1
1
1
1
0
1
1
1
1
1
1
REC IP IENT
ID CODE/NAME
PD2-1
AEOD/DOA
NRR/DRIS/SIB
E
FI
02
NRC
COPIES
LTTR ENCL
1
1
1
0
1
1
1
1
1
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
13
ENCL
10
SAFEGUARDS tgFOR
gQG ~
Docket No. 50-400
License
No.
Carolina
Power
and Light Company
ATTN:
Mr. E.
E. Utley
Senior Executive Vice President
Power Supply and Engineering
and Construction
P. 0.
Box 1551
Raleigh,
NC
27602
Gentlemen:
SUBJECT:
NRC
INSPECTION
REPORT
NO. 50-400/87-29
This refers
to the Nuclear
Regulatory
Commission
(NRC) inspection
conducted
by
G.
F. Gibson
on July 13-17,
1987.
The
inspection
included
a
review of
activities authorized
for your Shearon
Harris facility.
At the conclusion of
the inspection,
the findings were discussed
with those
members
of your staff
identified in the enclosed
inspection report.
Areas
examined
during
the
inspection
are identified in the report.
Within
these
areas,
the inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and
observation
of
activities in progress.
Within
the
scope
of
the
inspection,
no violations
or deviations
were
identified.
In accordance
with 10 CFR 2.790(d)
and
safeguards
activities
and
security measures
are exempt, from public disclosure;
therefore,
the enclosure
to this letter, with the exception
of the report cover page which presents
a
nonexempt
summary, will not be placed in the
NRC Public Oocument
Room.
Should you have
any questions
concerning this letter,
please
contact
us.
Sincerely,
Enclosure:
(See
page
2)
8708i70426
870804
ADOCK 05000400
Q
William E. Cline, Chief
Nuclear Materials Safety
and
Safeguards
Branch
Oivision of Radiation Safety
and Safeguards
EN(,'9,g~t uP~
3~F
UPON S~Pg pg ~
AT>ON
RCOBgp~
SAFEQUAROS INFORMATtQ"l
0
SAFEGUARDS INFQRMATIQN
Carolina Power.and
Light Company
Enclosure:
NRC Inspection
Report
(Safeguards
Information)
cc w/encl:
R.
A. Watson,
Vice President
Harris Nuclear Project
D.
L. Tibbitts, Director of Regulatory
Compliance
J.
L. Willis, Plant General
Manager
bcc w/encl:
NRR/DRIS/SB
bcc w/Inspection
Summary:
Document Control
Desk
(RIDS IE04), 016
NRC Resident
Inspector
State of North Carolina
A/6 U Q 1987
RI,
GF
s son:e
7'7
I
RI) (
RII
PF
d
ckson
DRMcGui
'e
ENCLOSURE CONThINS
1
7/>~/S7
7/~/87
.
Shl'EGUARD5 IWFOBkATIO?
SAF~~<<R>> INFQRMATiQN,.;",-.,'.-, ,.:,'.,*,