Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20205P436 + (20:03:27, 7 December 2024)
- ML20205P433 + (20:03:28, 7 December 2024)
- ML20205P431 + (20:03:31, 7 December 2024)
- ML20205P428 + (20:03:32, 7 December 2024)
- IR 05000461/1999008 + (20:03:34, 7 December 2024)
- ML20205P425 + (20:03:37, 7 December 2024)
- ML20205P424 + (20:03:38, 7 December 2024)
- IR 05000333/1988026 + (20:03:39, 7 December 2024)
- ML20205P420 + (20:04:12, 7 December 2024)
- ML20205P418 + (20:04:14, 7 December 2024)
- ML20205P416 + (20:04:15, 7 December 2024)
- ML20205P414 + (20:04:20, 7 December 2024)
- ML20205P413 + (20:04:20, 7 December 2024)
- ML20205P411 + (20:04:21, 7 December 2024)
- ML20205P412 + (20:04:21, 7 December 2024)
- PNO-III-88-090, on 881031,5,000 Gallons of Liquid Radwaste Leaked Through Failed Seal on Radwaste Evaporator HX in Radwaste Bldg.Util Drained Water Out of Radwaste Room & Decontaminated Affected Areas.No Liquid Entered Drain Sewer + (20:04:22, 7 December 2024)
- ML20205P407 + (20:04:23, 7 December 2024)
- ML20205P408 + (20:04:23, 7 December 2024)
- ML20205P404 + (20:04:24, 7 December 2024)
- ML20205P405 + (20:04:24, 7 December 2024)
- ML20205P402 + (20:04:25, 7 December 2024)
- ML20205P403 + (20:04:25, 7 December 2024)
- ML20205P400 + (20:04:26, 7 December 2024)
- ML20205P398 + (20:04:27, 7 December 2024)
- ML20205P399 + (20:04:27, 7 December 2024)
- ML20205P395 + (20:04:28, 7 December 2024)
- ML20205P393 + (20:04:29, 7 December 2024)
- ML20205P392 + (20:04:29, 7 December 2024)
- ML20205P391 + (20:04:30, 7 December 2024)
- 1CAN049901, Application for Amend to License DPR-51,revising Requirements Associated with ANO 1 Provisions for RB Testing & Insp + (20:04:31, 7 December 2024)
- ML20205P387 + (20:04:31, 7 December 2024)
- RBG-23566, Suppls 860227 Response to Violations Noted in Insp Rept 50-458/85-81.Departmental Review of All Station Operating Procedures in Main Control Room Controlled Copy 3 Conducted & Station Document Control Reassignment Made + (20:04:32, 7 December 2024)
- ML20205P382 + (20:04:34, 7 December 2024)
- IR 05000424/1987018 + (20:04:39, 7 December 2024)
- ML20205P378 + (20:04:39, 7 December 2024)
- ML20205P377 + (20:04:40, 7 December 2024)
- ML20205P376 + (20:04:40, 7 December 2024)
- ML20205P375 + (20:04:41, 7 December 2024)
- ML20205P373 + (20:04:41, 7 December 2024)
- ML20205P371 + (20:04:42, 7 December 2024)
- ML20205P370 + (20:04:43, 7 December 2024)
- ML20205P367 + (20:04:45, 7 December 2024)
- ML20205P368 + (20:04:45, 7 December 2024)
- ML20205P365 + (20:04:46, 7 December 2024)
- ML20205P364 + (20:04:47, 7 December 2024)
- 05000305/LER-1986-005, :on 860417,reactor Trip Occurred During Performance of Work Request on Intermediate-Range Nuclear Channel N35.Caused by Premature Removal of Control Power Fuse + (20:04:49, 7 December 2024)
- 2CAN049904, Informs That Based on Discussions with NRC Re 960823 Amend Request,Addl Info Was Added to TS 5.2.2 Re Control Element Assemblies (Ceas) Section of Proposed Change.Associated TS Page (5-1) Has Been Revised & Encl + (20:04:50, 7 December 2024)
- ML20205P359 + (20:04:51, 7 December 2024)
- ML20205P360 + (20:04:51, 7 December 2024)
- 05000412/LER-1999-004, :on 990312,inadequate Basis for Seismic Instrument Setpoints & Calibration Led to TS Noncompliance. Caused by Discrepancy in Tss.Noncompliances Were Corrected & Appropriate Procedures Were Revised.With + (20:04:55, 7 December 2024)
- TXX-4802, Part 21 & Final Deficiency Rept CP-86-29 Re Gibbs & Hill Acceptance Testing for air-operated Valves in Instrument Air Sys.Initially Reported on 860414.Item Not Reportable Per 10CFR50.55(e) + (20:04:56, 7 December 2024)