7 BYRON NUCLEAR POWER STATION UNIT 1 MONTHLY PERFORMANCE REPORT COMMONWEALTH EDISON COMPANY NRC DOCKET NO. 050-454 LICENSE NO. NPF-37
/
8605210397 860430 PDR ADOCK 0500 4
R f
- 50 (
~
(0625M/62M) i
p_
"t I.
Monthly' Report for Byron Unit 1' A.
Summary of Operating Experience for Unit 1 The Unit was at power for the entire reporting period.
1
- ,S, t
i (0625M/62M)
t B.
OPERATING DATA REPORT DOCKET NO.: 050-454 UNIT: Byron One DATE: 5/9/86 COMPILED BY:
J.E. Langan TELEPHONm (815)234-5441 x2825 OPERATING STATUS 1.
Reporting Period: April 1986. Gross Hours: 719 2.
Currently Authorized Power Level (MWt): 3411 Design Electrical Rating: 1175 (MWe-gross)
Design Electrical Rating: 1120 (MWe-net)
Max Dependable Capacity (MWe-net): NOT DEIERMINED 3.
Power Level to Which Restricted (If Any): 1152 (MWe-gross) 4.
Reasons for Restriction (If Any): Not meeting minimum requirement on split feedwater flow.
THIS MONTH YR TO DATE CUMULATIVE
- 5.
Report Period Hrs.
719 2879 5448 6.
Rx Critical Hours 719 2497.1 4489.6 7.
Rx Reserve Shutdown Hours u
21.7 37.8 8.
Hours Generator on Line 719 2452 3644.4 9.
Unit Reserve Shutdown Hours 0
0 0
- 10. Gross Thermal Energy (MWH) 2336975 7699718 11038910
- 11. Gross Elec. Energy (MWH) 794799 2590875 3679465
- 12. Het Elec. Energy (MWH) 756481 2450996 3463894
- 13. Reactor Service Factor 100 86.7 82.4
- 14. Reactor Availability Factor 100 87.5 83.1
- 15. Unit Service Factor 100 85.2 66.9
- 16. Unit Availability Factor 100 85.2 66.9
- 17. Unit Capacity Factor (MDC net)
N/A N/A N/A
- 18. Unit Capacity Factor (DER net) 93.9 76.0 56.8
- 19. Unit Forced Outage Hrs.
0 102.7 205.3
- 20. Unit Forced Outage Rate 0
4.0 5.3
- 21. Shutdowns Scheduled Over Next 6 Months: None,
- 22. If Shutdown at End of Report Period, Estimated Date of Startup: N/A
- 23. Units in Test Status (Prior to Commercial Operation): None
- Note - The cumulative numbers do not reflect power generated prior to commercial service.
(0625M/62M)
C.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.:
050-454 UNIT: Byron One DATE:
5/9/86 COMPILED BY:
J.E. Langan TELEPl!ONE:
(815)234-5441 x2825 MONTil: April, 1986 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1.
1070 MW 17.
1074 MW 2.
1060 MW 18.
1069 MW 3.
1070 MW 19.
1068 MW 4.
1080 MW 20.
1069 MW 5.
1064 MW 21.
1075 MW 6.
1080 MW 22.
1067 MW 7.
1062 MW 23.
1057 MW 8.
1073 MW 24.
1055 MW 9.
1068 MW 25.
1019 MW 10.
958 MW 26.
981 MW 11.
975 MW 27.
955 MW 12.
1054 MW 28.
1017 MW 13.
1069 MW 29.
1061 MW 14.
1073 MW 30.
1051 MW 15.
1088 MW
/
16.
1080 MW INSTRUCTIONS On this form list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt. These figures will be used to plot a graph for each reporting month. Note that when maximum j
dependable capacity is used for the net electrical rating of the unit there may be occasions when the daily average power level exceeds the 10G% line (or the restricted power level line.) In such cases the average daily unit power output sheet should be footnoted to explain the apparent anomaly.
l (0625M/62M)
-r-
- eee**e **********.
R; port Period April, 1986 UNIT SHUTDOWNS / REDUCTIONS BYRON e,* * *p *
- e **'* * * * * * *
- e e n e * *
- I /* '
No.
Date Type Hours Reason Method LER Number U tem Component Cause & Corrective Action to Prevent Recurrence cocece*********
30 days of power operations.
Summary ooocce***emenee i
TYPE Reason Method System & Component I
i l
F-Forced A-Equip Failure F-Admin 1-Manual Exhibit F & H S-Sched B-Maint or Test G-Oper Error 2-Manual Scram Instructions for C-Refueling H-Other 3-Auto Scram Preparation of D-Regulatory Restriction 4-Continued Data Entry Sheet E-Operator Training 5-Reduced Load Licensee L' vent Report
& License Examination 9-Other (LER) File (NUREG-0161)
I
- 1).
E.
UNIQUE REPORTING REQUIREMENTS l
1.
Safety / Relief valve operations for Unit One.
VALVES NO & TYPE PLANT DESCRIPTION DATE ACTUATED ACTUATION CONDITION OF EVENT None l
2.
Licensee generated changes to ODCM.
(Y/N)
{
None l
)
4 4
l i
(0625M/62M)
r-F.
LICENSEE EVENT REPORTS The following is a tabular summary of all Licensee Event Reports for Byron Nuclear Power Station, Unit One, submitted during the reporting period, April 1 through April 30, 1986. This information is provided pursuant to the reportable occurrence reporting requirements as set forth in 10CFR 50.73.
Licensee Event Report Number Date Title of Occurrence 86-002-01 4-9-86 Control Room Ventilation Actuation Due to Radiation Monitor OPR31J Iodine Channel Spike.
86-010-00 4-7-86 Control Room Ventilation Actuation Due to Shutdown of Radiation Monitor OPR34J Sample Pump.
86-011-00 4-14-86 Control Room Ventilation Actuation Due to High Vacuum Alarm on OPR34J Radiation Monitor.
86-012-00 4-22-86 Rod Position Indication Surveillance Not Performed Within Required Periodicity Due to Personnel Error, s
(0625M/62M) l
. ~. -
May 9, 1986 LTR:
BYRON 86-0464 File:
2.7.200 Director, Office of Management Information and Program Control United States Nuclear Regulatory Commission Washington, D.C.
20555 ATTN:
Document Control Desk Gentlemen:
Enclosed for your information is the Monthly Performance Report covering Byron Nuclear Power Station for the period April 1 through April 30, 1986.
Very truly yours, R. E. Querio Station Manager Byron Nuclear Power Station REQ /JEL/Ir Enclosures cc:
J.G. Keppler, NRC, Region III NRC Resident Inspector Byron
/
Gary Wright, Ill. Dept. of Nuclear Safety D.P. Galle T. J. Maiman D.L. Farrar Nuclear Fuel Services, PWR Plant Support L. Anastasia, Station Nuclear Engineering INPO Records Center Thermal Group, Tech Staff Byron Station Nuclear Group, Tech Staff Byron Station L. Olshan - USNRC (0625M/62M)