F
sf.5
-
May 5, 1986
Georgia Power Company
ATTN: LPfr. R. J. Kelly
Executive Vice President
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT: NRC REVIEW 0F V0GTLE READINESS REVIEW PROGRAM, APPENDIX 0, DOCUMENT
CONTROL - REPORT N0. 50-424/85-61
The NRC has completed a detailed review, inspection, and verification of the
subject appendix which was submitted to the NRC on November 25, 198b.
Inspections were conducted at the Vogtle site and our findings were discussed
with members of your staff at the conclusion of these inspections.
Areas contained in the appendix which were reviewed, examined, and verified are
identified in the enclosed report.
Within these areas, the inspection and
verification consisted of selected examinations of procedures and representative
records, discussions with personnel, observations of activities in progress, and
review of your licensing commitments.
Appendix D reviews and inspections resulted in the identification of one
violation and one unresolved item which are listed in the enclosed report. One
portion of your program identified as Readiness. Review Finding RRF D-5, has not
been completed and reviewed by your Readiness Review activities. This involves a
record submittal plan for QA records. This appears to affect a major portion of
your QA records program.
This must be completed before we can complete our
review and acceptance of your entire program.
Your attention is invited to these
matters which will be pursued during future licensing reviews and inspections
Based on the NRC review and inspections of your activities for QA records and
document control, we have determined that those portions of your program which
have been completed and reviewed in your readiness review activities, are
acceptable with the exception of those items or areas identified in our report.
As discussed above, a significant portion of your program remains to be completed.
This conclusion was based on information available to the inspectors and
reviewers during their review.
Should information subsequently become available
whice was not considered during this review or which conflicts with earlier
information, it will be evaluated to determine what effects it may have on the
above conclusion.
l
G
')
ram
-
- - - - - -
-
-
-
---
~
.
.
s.
.
,
Georgia Power- Company
2
May 5, 1986
Should you have any questions concerning this letter, please contact us.
Sincerely.
ORIGINAL StGflED BYt
J. flEL503 GRACE
J. Nelson Grace
Regional Administrator
Enclosure:
Report No. 50-424/85-61
pc w/ enc 1:
VR. E. Conway, Senior Vice President &
d.ProjectDirector
O. Foster, Vice President, Project
'
Support
d . D. Rice, Vice President, Project
d. Engineering
H. Pinson, Vice President, Project
Construction
1
/J.T.Beckham,VicePresident&
'
vi. General Manager - Operations
A. Thomas, Vice President,
Licensing
VC. W. Hayes, Vogtle Quality
/ . Assurance Manager
'
W
C. Ramsey, Manager -
Readiness Review
/G. B. Bockhold, General Manager,
,
Nuclear Operations
VI. Gucwa, Manager, Nuclear Safety
/ .and Licensing
M
H. Googe, Project
{
Construction Manager
ME.D. Groover, Quality
Assurance Site Manager -
Construction
/J.A. Bailey,ProjectLicensing
,
/ . Manager
a
G
F. Trowbridge, Esq., Shaw,
VI.Pittman, Potts and Trowbridge
W. Churchill, Esq., Shaw,
'
Pittman, Potts and Trowbridge
j E. L. Blake, Jr. , Esq. , Shaw,
l
Pittman, Potts and Trowbridge
VJ. E. Joiner, Troutman, Sanders,
>
Lockerman and Ashmore
r
,-
..
.
,
Georgia Power Company
3
May 5, 1986
. G. Ledbetter, Commissioner,
Department of Human Resources
MC.H. Badger,OfficeofPlanning
/ and Budget
@. Kirkland, III, Counsel,
Office of the Consumer's Utility
/ Council
V D. C. Teper, Georgians Against
Nuclear Energy
M. B. Margulies, Esq., Chairman,
Atomic Safety and Licensing Board
fr.anel
P
>
D
O. H. Paris, Administrative Judge
,
Atomic Safety and Licensing Board
Panel
G. A. Linenberger, Jr., Administrative Judge
!
Atomic Safety and Licensing Board
/. Panel
B
P. Garde, Citizens Clinic, Director
j
Government Accountability Project
'
Acc w/ encl:
+/E. Reis, ELD
/W. M. Hill, IE
. Miller, NRR
W. Brach, ED0
M. Sinkule, RII
/W.Rankin,RII
/NRC Resident Inspector
Jocument Control Desk
J tate of Georgia
.
RII
RII
RII
RI
RII
RII
L'RMoore):J&&/V
lod
e/Lf
MS
'
RWWright
GABelisle
C
lian VP
ciera
MVSinkule
.
'
4/sy86
4/2)/86
4/23/86
4/g86
4/fr/86
a
RII
RII
ELD
NR
U b MQ'
HT
/W3
EG6 M5
lAVG n yL6
4
y
VLBrownlee
RDWalker
EReis
HTh mpson
BGrimes
4/f5/86
4/ /86
4/26/86
4/u /86
4/M /86
RII
i
Q,1
LReyes
,
04/ /86
'
-
- -
-
- -
.
.
.
.
-
-