Corrected Notice of Deviation from Insp on 851226-860201
ML20205P413
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 04/18/1986
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML20205P397 List:
References
50-413-85-55, 50-414-85-68, NUDOCS 8605210402
Download: ML20205P413 (1)


Text

_

l i

ENCLOSURE 2 NOTICE OF DEVIATION i

Duke Power Company Docket Nos. 50-413 and 50-414 Catawba Units 1 ar.d 2 License Nos. NPF-35 and CPPR-117 The following deviation was identified during an inspection conducted on l

December 26, 1985 - February 1,1986.

The licensee informed the NRC in FSAR, Rev.13, paragraph 7.4.7.1, that the instrumentation and controls required. for hot shutdown outside ' the control room in the auxiliary building on the auxiliary shutdown panels were listed on Tables 7.4.7-1, 7.4.7-2, and 7.4.7-3.

1 Contrary to the above, all instrumentation and controls listed in Tables 7.4.7-1, 7.4.7-2, and 7.4.7-3 were not installed on the auxiliary shutdown panels.

1 i

Please provide, in writing within 30 days of the date of this Notice, a i

description of corrective actions regarding these deviations, actions taken to avoid further deviations, and the dates when these actions were or will be completed.

Security or safeguards information should be submitted as an enclosure to facilitate withholding it from public disclosure as required by 10 CFR 2.790(d) or 10 CFR 73.21.

1 APR 181986 Date:

a 4

1 8605210402 860506 PDR ADOCK 05000413 G