Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- LIC-99-0033, Forwards Addl Info to Support NRC Review of Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for ECC & Containment Heat Removal Pumps + (07:53:20, 7 December 2024)
- ML20205S607 + (07:53:20, 7 December 2024)
- ML20205S605 + (07:53:22, 7 December 2024)
- ML20205S604 + (07:53:22, 7 December 2024)
- ML20205S602 + (07:53:23, 7 December 2024)
- ML20205S601 + (19:18:56, 7 December 2024)
- ML20205S598 + (19:18:57, 7 December 2024)
- ML20205S597 + (19:18:58, 7 December 2024)
- ML20205S596 + (19:18:59, 7 December 2024)
- 05000341/LER-1987-008, :on 870301,power to Portions of Turbine Control Circuitry Lost Resulting in ESF Valve Isolation,Reactor Protection Sys Actuation & Reactor Scram.Caused by Personnel Error.Alarm Response Procedures Revised + (19:19:05, 7 December 2024)
- ML20205S594 + (19:19:06, 7 December 2024)
- ML20205S590 + (19:19:07, 7 December 2024)
- ML20205S591 + (19:19:07, 7 December 2024)
- ML20205S589 + (19:19:08, 7 December 2024)
- ML20205S586 + (19:19:09, 7 December 2024)
- ML20205S587 + (19:19:09, 7 December 2024)
- ML20205S582 + (19:19:10, 7 December 2024)
- ML20205S581 + (19:19:11, 7 December 2024)
- ML20205S579 + (19:19:12, 7 December 2024)
- ML20205S577 + (19:19:13, 7 December 2024)
- ML20205S575 + (19:19:13, 7 December 2024)
- ML20205S571 + (19:19:15, 7 December 2024)
- ML20205S572 + (19:19:15, 7 December 2024)
- ML20205S570 + (19:19:19, 7 December 2024)
- ML20205S565 + (19:19:20, 7 December 2024)
- ML20205S564 + (19:19:22, 7 December 2024)
- ML20205S563 + (19:19:23, 7 December 2024)
- ML20205S562 + (19:19:23, 7 December 2024)
- ML20205S561 + (19:19:24, 7 December 2024)
- ML20205S560 + (19:19:24, 7 December 2024)
- NRC-87-0005, Lists Total Amount of Property Damage & Decontamination Coverage in Effect,Per Requirements of 10CFR50.54(w)(4) + (19:19:25, 7 December 2024)
- ML20205S555 + (19:19:26, 7 December 2024)
- ML20205S557 + (19:19:26, 7 December 2024)
- ML20205S554 + (19:19:27, 7 December 2024)
- ML20205S550 + (19:19:28, 7 December 2024)
- ML20205S549 + (19:19:29, 7 December 2024)
- B17630, Provides Response to RAI Dtd 990316,in Response to GL 97-04, Assurance of Sufficient Net Positive Suction Head for Emergency Core Cooling & Containment Heat Removal Pumps. Addl Info Requested + (19:19:31, 7 December 2024)
- ML20205S545 + (19:19:32, 7 December 2024)
- 05000245/LER-1986-017-01, :on 860521,during Downpowering of Planned Shutdown,Reactor Pressure Dropped Briefly Then Increased Rapidly to 1,047 Psig,Causing Manual Reactor Scram.Rate Stop Adjustment Screws Replaced + (19:19:42, 7 December 2024)
- 05000423/LER-1986-034, :on 860507,discovered That Surveillance of ESF Bldg Ventilation Radiation Monitor Sampler Flow Rate Monitor Not Included in Monitor Surveillance Procedures.Surveillance Procedures Revised + (19:19:48, 7 December 2024)
- ML20205S541 + (19:19:49, 7 December 2024)
- IR 05000289/1987005 + (19:20:04, 7 December 2024)
- BSEP-86-0903, Monthly Operating Repts for May 1986 + (19:20:05, 7 December 2024)
- 05000220/LER-1986-011, :on 860508,contractor Received Contaminated Injury to Hand from Cut Section of Piping.Caused by Personnel Error.Medical Attention Administered & Radiation Exposure Survey Conducted + (19:20:16, 7 December 2024)
- ML20205S536 + (19:20:17, 7 December 2024)
- ML20205S534 + (19:20:22, 7 December 2024)
- ML20205S533 + (19:20:24, 7 December 2024)
- ML20205S532 + (19:20:28, 7 December 2024)
- ML20205S528 + (19:20:30, 7 December 2024)
- ML20205S527 + (19:20:30, 7 December 2024)
- B17743, Updates NRC Staff Re GL 96-01 Actions as Committed to by Nneco.Action 2 of GL 96-01 Has Been Completed & Necessary Surveillance Procedure Changes Identified,Completed + (19:20:33, 7 December 2024)
- ML20205S522 + (19:20:34, 7 December 2024)