Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20207Q651 + (00:51:32, 7 December 2024)
- ML20207Q650 + (00:51:33, 7 December 2024)
- ML20207Q646 + (00:51:34, 7 December 2024)
- ML20207Q647 + (00:51:34, 7 December 2024)
- ML20207Q645 + (00:51:35, 7 December 2024)
- ML20207Q643 + (00:51:35, 7 December 2024)
- ML20207Q642 + (00:51:36, 7 December 2024)
- ML20207Q641 + (00:51:36, 7 December 2024)
- ML20207Q640 + (00:51:37, 7 December 2024)
- ML20207Q638 + (00:51:45, 7 December 2024)
- ML20207Q637 + (00:51:46, 7 December 2024)
- ML20207Q636 + (00:51:47, 7 December 2024)
- ML20207Q634 + (00:51:47, 7 December 2024)
- 05000482/LER-1986-069, :on 861222,main Turbine Trip & Feedwater Isolation Occurred Due to Steam Generator hi-hi Level, Followed by Reactor Trip Due to Steam Generator lo-lo Level. Caused by Equipment Failure.Equipment Replaced + (00:51:54, 7 December 2024)
- ML20207Q632 + (00:51:55, 7 December 2024)
- RBG-25254, Forwards Supplemental Response to Notice of Violation 8627-02 Re Failure to Follow Surveillance Test Package Per Insp Rept 50-458/86-27 on 860801-0915.Temporary Change Notices Issued Against Listed Procedures + (00:51:55, 7 December 2024)
- ML20207Q628 + (00:51:56, 7 December 2024)
- ML20207Q623 + (00:51:56, 7 December 2024)
- 05000333/LER-1986-021, :on 861223,HPCI & Three Primary Containment Isolation Sys Valves Inoperable.Caused by Water Spray Onto Battery Motor Control Ctr (Bmcc).Bmcc Dried,Tested & Energized.Bmcc & HPCI Declared Operable + (00:52:03, 7 December 2024)
- ML20207Q617 + (00:52:04, 7 December 2024)
- ML20207Q618 + (00:52:04, 7 December 2024)
- ML20207Q616 + (00:52:05, 7 December 2024)
- ML20207Q613 + (00:52:12, 7 December 2024)
- ML20207Q610 + (00:52:13, 7 December 2024)
- ST-HL-AE-1885, Final Deficiency Rept Re Possible Common Mode Failure of Toxic Gas Detectors in Electrical Auxiliary Bldg.Initially Reported on 861219.Toxic Gas Detectors Will Be Modified to Ensure That Detectors Fail in Safe Manner + (00:52:13, 7 December 2024)
- 05000155/LER-1987-001, :on 870102,during Refueling Outage,Upscale/ Downscale Reactor Protection Sys Actuation Occurred.Caused by Electrical Noise Inherent at Low Power Levels.Picoammeter 2 Will Be Repaired & Tested + (00:52:20, 7 December 2024)
- ML20207Q604 + (00:52:21, 7 December 2024)
- TXX-6231, Interim Deficiency Rept CP-86-13 Re Computer Entry Error Which May Invalidate Portions of Jet Impingement Load Review for High Energy Piping.Initially Reported on 860305.Next Rept Will Be Submitted by 870407 + (00:52:21, 7 December 2024)
- 05000282/LER-1986-011-01, :on 861227,during Testing,Diesel Cooling Water Pump Declared Inoperable W/One Pump Already Out of Svc. Caused by Failure of Aeroquip Corp Flexible Hose.Flexible Hoses Replaced W/Hoses of Higher Temp Rating + (00:52:36, 7 December 2024)
- ML20207Q600 + (00:52:37, 7 December 2024)
- ML20207Q599 + (00:52:38, 7 December 2024)
- ML20207Q598 + (00:52:38, 7 December 2024)
- ML20207Q594 + (00:52:39, 7 December 2024)
- TXX-6228, Final Deficiency Rept CP-86-77 Re Spec of Min Wall Thickness in Instrument Tubing.Initially Reported on 861021.Mods Will Be Implemented as Required to Alleviate All Unacceptable Conditions + (00:52:39, 7 December 2024)
- ML20207Q590 + (00:52:40, 7 December 2024)
- ML20207Q589 + (00:52:40, 7 December 2024)
- ML20207Q585 + (00:52:41, 7 December 2024)
- ML20207Q586 + (00:52:41, 7 December 2024)
- ML20207Q584 + (00:52:42, 7 December 2024)
- IR 05000334/1986029 + (00:52:43, 7 December 2024)
- ML20207Q582 + (00:52:43, 7 December 2024)
- ML20207Q574 + (00:52:44, 7 December 2024)
- ML20207Q560 + (00:52:45, 7 December 2024)
- ML20207Q564 + (00:52:45, 7 December 2024)
- ML20207Q559 + (00:52:46, 7 December 2024)
- ML20207Q558 + (00:52:46, 7 December 2024)
- ML20207Q557 + (00:52:47, 7 December 2024)
- 05000440/LER-1986-090, :on 861225,one Standby Liquid Control Sys Train Inoperable,Violating Tech Spec 3.0.4.Caused by Work Package Deficiency Due to Personnel Error.Personnel Counseled & Training Initiated + (00:52:53, 7 December 2024)
- 05000331/LER-1986-027, :on 861218,inadvertent Trip of Reactor Protection Sys Occurred.Caused by Personnel Failure to Reset Logic.Disciplinary Action Initiated.Procedure Will Be Modified to Include Addl Precautions + (00:53:00, 7 December 2024)
- ML20207Q550 + (00:53:01, 7 December 2024)
- TXX-6200, Advises That Completion Date for Corrective Action for Procedure STA-606, Work Orders/Work Requests, Changed from 861231 to 870228,per Violation 446/8509-V-02 + (00:53:02, 7 December 2024)
- 05000388/LER-1986-018-01, :on 861219,125-volt Dc Battery Charger 1D613 Inoperable.Unit 1 Supervisor Failed to Inform Unit 2 Supervisor of Equipment Failure,Resulting in Violation of Tech Spec.Battery Replaced + (00:53:08, 7 December 2024)