Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18038B978 + (16:26:28, 6 January 2025)
- ML18038B976 + (16:26:29, 6 January 2025)
- ML18038B975 + (16:26:31, 6 January 2025)
- ML18038B974 + (16:26:32, 6 January 2025)
- ML18038B973 + (16:26:32, 6 January 2025)
- ML18038B971 + (16:26:33, 6 January 2025)
- 05000260/LER-1997-004-03, :on 970909,TS Surveillances Were Not Performed During Refueling Outage Timeframe.Caused by Personnel Error. Incorporated Missed Snubber & Vacuum Breaker Surveillances Into Refueling Outage Schedule + (16:26:34, 6 January 2025)
- 05000260/LER-1997-004, Forwards LER 97-004-00,providing Details Re Failure to Perform Required Surveillances During Refueling Outage Time Frames as Required by TS + (16:26:36, 6 January 2025)
- ML18038B967 + (16:26:37, 6 January 2025)
- 05000296/LER-1997-005-02, :on 970824,LCO Was Not Entered When Valve Was Malfunctioning.Caused by Lack of Questioning Attitude by Operations Crew.Involved SROs Were Counseled & Problem Evaluation Rept Will Be Discussed + (16:26:39, 6 January 2025)
- 05000296/LER-1997-005, Forwards LER 97-005-00,providing Details Concerning Failure to Enter LCO When Unit 3 Primary Containment Isolation Flow Control Valve Was Declared Inoperable Due to Sticking Solenoid Valve.Rsos Developed Mindset Re Failure Mech + (16:26:41, 6 January 2025)
- ML18038B963 + (16:26:42, 6 January 2025)
- ML18038B960 + (16:26:43, 6 January 2025)
- ML18038B961 + (16:26:43, 6 January 2025)
- ML18038B958 + (16:26:44, 6 January 2025)
- ML18038B957 + (16:26:45, 6 January 2025)
- ML18038B956 + (16:26:46, 6 January 2025)
- ML18038B953 + (16:26:46, 6 January 2025)
- ML18038B952 + (16:26:47, 6 January 2025)
- ML18038B951 + (16:26:47, 6 January 2025)
- ML18038B950 + (16:26:48, 6 January 2025)
- ML18038B949 + (16:26:50, 6 January 2025)
- ML18038B944 + (16:26:51, 6 January 2025)
- ML18038B943 + (16:26:52, 6 January 2025)
- ML18038B941 + (16:26:53, 6 January 2025)
- ML18038B940 + (16:26:54, 6 January 2025)
- ML18038B937 + (16:26:55, 6 January 2025)
- ML18038B938 + (16:26:55, 6 January 2025)
- ML18038B936 + (16:26:56, 6 January 2025)
- ML18038B934 + (16:26:57, 6 January 2025)
- ML18038B933 + (16:26:58, 6 January 2025)
- 05000260/LER-1997-003-03, :on 970711,determined That HPCI Turbine Speed Lower than Indicated.Caused by Improper Evaluation of Valve Leak.Work Orders to Troubleshoot HPCI Initiated + (16:26:59, 6 January 2025)
- 05000260/LER-1997-003, Forwards LER 97-003-00 Re Failure of HPCI Surveillance Instruction + (16:27:01, 6 January 2025)
- ML18038B929 + (16:27:03, 6 January 2025)
- ML18038B928 + (16:27:05, 6 January 2025)
- ML18038B927 + (16:27:06, 6 January 2025)
- ML18038B925 + (16:27:07, 6 January 2025)
- 05000260/LER-1997-002-04, :on 970626,discovered That Four Surveillance Instructions (Sis) Did Not Fully Test All Relay Logic Combinations.Caused by Personnel Error.Verified Relay Contacts Operable & Revised Applicable SIs + (16:27:09, 6 January 2025)
- IR 05000259/1997006 + (16:27:15, 6 January 2025)
- ML18038B920 + (16:27:16, 6 January 2025)
- ML18038B918 + (16:27:17, 6 January 2025)
- ML18038B914 + (16:27:22, 6 January 2025)
- ML18038B913 + (16:27:23, 6 January 2025)
- ML18038B911 + (16:27:24, 6 January 2025)
- ML18038B910 + (16:27:25, 6 January 2025)
- ML18038B907 + (16:27:28, 6 January 2025)
- ML18038B908 + (16:27:28, 6 January 2025)
- ML18038B906 + (16:27:29, 6 January 2025)
- ML18038B904 + (16:27:30, 6 January 2025)
- ML18038B903 + (16:27:31, 6 January 2025)
- ERF + (16:28:00, 6 January 2025)