Text

CATEGORY 1

~ ae REGULRT ZNFORMRTZON DZSTRZBUTZONSTEM (RZDS)

ACCESSION NBR:9710210145 DOC.DATE: 97/10/15 NOTARIZED: NO FACIL:50-260 Browns,Ferry Nuclear Power Station, Unit 2, Tennessee AUTH.N~E AUTHOR AFFILIATION ABhfEYF Tt.'E Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

DOCKET 05000260

SUBJECT:

Forwards Rev 0 to TVA-COLR-BF2C10, "Brown Ferry Nuclear Plant Unit 2,Cycle 10 COLR."

No. new commitments contained in ltr.

DISTRIBUTION CODE:

A001D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: OR Submittal: General Distribution A

NOTES:

RECIPIENT ID CODE/NAME PD2-3 WILLIAMSFJ.

INTERNAL: ACRS NRR/DE/ECGB/A NRR/DRCH/HICB NRR/DSSA/SRXB OGC/HDS3 EXTERNAL: NOAC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 1

0 1

1 RECIPIENT ID CODE/NAME PD2-3-PD gH-NRR/DE/EMCB NRR/DSSA/SPLB NUDOCS-ABSTRACT NRC PDR COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 D

E NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUT1ON LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)

ON EXTENSION 415-2083

'TOTAL NUMBER OF COPIES REQUIRED.:

LTTR 14 ENCL 13

0 I~

i

Tennessee Valley Authority. post Ollice Box 2000. Decatur, Alabama 36609 October 15, 1997 U.S. Nuclear Regulatory Commission ATTN:

Document Control Desk Washington, D.C.

20555 Gentlemen:

In the Matter of

)

Tennessee Valley Authority

)

Docket No. 50-260 BROWNS FERRY NUCLEAR PLANT (BFN)

UNIT 2 CORE OPERATING LIMITS REPORT FOR UNIT 2 CYCLE 10 OPERATION In accordance with the requirements of Technical Specification 6.9.1.7, TVA is submitting in the enclosure the Core Operating Limits Report for BFN Unit 2, Cycle 10 operation.

There are no new commitments contained in this letter.

If you have any questions, please contact me at (205) 729-2636.

Si cerely, r

T.

. Abney Manager of Lic sin and Indus y Affai s Enclosure cc:

See page 2

Ci 97i02iOi45 97iOi5 PDR ADQCK 05000260it p

<<gPDR J m V lllllllllNttlliilllill

~

~

AU.S. Nuclear Regulatory Commission Page 2

October 15, 1997 Enclosure cc '(Enclosure):

Mr. Mark S. Lesser, Branch Chief U.S. Nuclear Regulatory Commission Region II 61 Forsyth Street, S.W.

Suite 23T85

Atlanta, Georgia 30303 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road
Athens, Al'abama 35611 Mr. J.

F'. Williams; Project Manager U..S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, Maryland 20852

il

~

~

ENCLOSURE TENNESSEE VALL'EY AUTHORITY BROWNS 'FERRY NUCLEAR PLANT (BFN)

UNIT 2 CORE OPERATING LIMITS REPORT FOR'YCLE, 10 iOPERATION (SEE ATTACHED)

~

~