Responds to NRC Re Violations Noted in Insp Repts 50-259/97-05,50-260/97-05 & 50-296/97-05.Corrective Actions: Unit Supervisor Was Removed from Shift Duties & Reclassified & Operating Crews Were Briefed
ML18038B907
Person / Time
Site: Browns Ferry  
Issue date: 07/01/1997
From: Crane C
TENNESSEE VALLEY AUTHORITY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
50-259-97-05, 50-259-97-5, 50-260-97-05, 50-260-97-5, 50-296-97-05, 50-296-97-5, NUDOCS 9707100011
Download: ML18038B907 (20)


Text

CATEGORY 1 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9707100011 DOC.DATE: 97/07/01 NOTARIZED:. NO FACIL:50-259 Browns Ferry Nuclear Power Station, Unit 1, Tennessee

~

~

50-260 Browns Ferry Nuclear Power Station, Unit 2, Tennessee 5'0-296 Browns Ferry Nuclear Power Station, Unit 3, Tennessee UTH.NAME AUTHOR AFFIIIATION CRANE,C.M.

Tennessee Valley Authority RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

DOCKET 05000259 05000260 05000296

SUBJECT:

Responds to NRC 970605 ltr re violations noted in insp repts 50'-259/97-05,50-260/97-05 6 50-296/97-05.Corrective actions:

Unit Supervisor removed from shift duties

& reclassified operating crews briefed.

DISTRIBUTION CODE:

IEOID COPIES RECEIVED:LTRf ENCL J SIZE:

9 TITLE: General (50 Dkt)-Insp Rept/Notice of Violation Response NOTES.:

RECIPIENT ID CODE/NAME PD2-3-PD INTERNAL: ACRS AEQP+92E LE CENTE R

H B

t NRR/DRPM/PERB OE DIR RGN2 FILE 01 EXTERNAL LITCO BRYCE IJ H

NRC PDR COPIES LTTR ENCL 1

1 2

2 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME WILLIAMSPJ~

AEOD/SPD/RAB DEDRO NRR/DISP/PIPB NRR/DRPM/PECB NUDOCS-ABSTRACT OGC/HDS3 NOAC NUDOCS FULLTEXT COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

1 1

R 0

C N

NOTE TO ALL "RIDS" RECIPIENTS:

t PLEASE HELP US TO REDUCE'WASTETH CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN SD-5(EXT. 415-2083)

TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED:

LTTR 20 ENCL 20

0 il

~i

Tennessee Valley Authority; Post Office Box 2000, Decatur, Alabama 35609-2000 Christopher M. (Chris) Crane Vce President. Srowns Feny Nuclear Plant July 1, 1997 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555 10 CFR 2.201 Gentleman:

In the Matter of Tennessee Valley Authority Docket Nos.

4 50-259 50-260 50-296 BROWNS FERRY NUCLEAR PLANT (BFN)

NRC INSPECTION REPORT 50 259 r 50 260 r 50 296/97 05 REPLY TO NOTICE OF VIOLATION (NOV)

This letter provides TVA's reply to the subject NOV transmitted by letter from M. S. Lesser, NRC, to O.

D.

Kingsley Jr.,

TVA, dated June 5,

1997.

In the letter, two violations of NRC requirements were identified.

The first violation involved the failure of the control room personnel to promptly reset a locked reactor recirculation pump scoop tube under runback conditions.

The second violation addressed two examples of inadequate self checking and second-party verification when performing Surveillance Instruction steps.

TVA admits these violations.

The Enclosure contains the reply to the NOVs.

No commitments are made in this reply. If you have any questions, please contact me at (205) 729-3675.

Sincerely, C.

. Crane Site ice, President Enclosure t

9707i000ii 97070i PDR ADOCK Q50Q0259 8

PDR lllllllllillllllllllllilillliiiiiiiiiiil

il il~

U.S. Nuclear Regulatory Commission Page 2

Enclosure cc (Enclosure):

Regional Administrator U.S. Nuclear Regulatory Commission Region II 61 Forsyth Street S.W.

Suite 23T85 Atlanta, Georgia 30303 Mr. Mark S. Lesser, Branch Chief U.S. Nuclear Regulatory Commission Region II 61 Forsyth Street S.W.

Suite 23T85 Atlanta, Georgia 30303 NRC Resident Inspector Browns Ferry Nuclear Plant 10833 Shaw Road

Athens, Alabama 35611 Mr. J.

F. Williams, Project Manager U.S. Nuclear Regulatory Commission One White Flint, North 11555 Rockville Pike Rockville, 'Maryland 20852

4'

U.S. Nuclear Regulatory Commission Page 3

TEA: SWA: BAB Enclosure cc (Enclosure):

J. A. Bailey, LP 6A-C M. Bajestani, OPS 4A-SQN M. J. Burzynski, BR 4J-C R. R. Baron, BR 4J-C E.. S. Christenbury, ET 11H-K C. M. Crane, PAB lE-BFN K. N. Harris, LP 3B-C F.

C. Mashburn, BR 4J-C T. J. McGrath,,

LP 3B-C D. T. Nye, PEC 2B-BFN Dale Porter, PAB 2R-BFN C.

M. Root<

PAB 2G-BFN Karl Singer, POB 2C-BFN R.

H. Shell, BR 4J-C H. L. Williams, PEC 2A-BFN

0. J. Zeringue, LP 6A-C RIMSi WT 3B-K 9: 4 1fchsubmit~subsNNov9705. doc

ll

ENCLOSURE TENNESSEE VALLEYAUTHORITY BROHNS FERRY NUCLEAR PLANT (BFN)

UNITS 1 ~

2g AND 3 INSPECTION REPORT NUMBER 50 259 g 50 260 ~ 50 296/97 05 REPLY TO NOTICE OF VIOLATION (NOV)

RESTATEMENT OF VIOLATIONA "Technical Specification 6.8.1.1 requires that written procedures shall be established, implemented and maintained covering the applicable procedures recommended in Appendix A of Regulatory Guide 1.33, Revision 2, February 1978..

Paragraph 4 of Appendix A of Regulatory Guide 1.33 recommends procedures for the operation of the Nuclear Steam Supply System (Vessel 'and Recirculating System)

Operating Instruction 3-0I-68, Reactor Recirculation System, Revision 9, Section 8.8.1.7, requires that if conditions are present that require a Recirc Pump runback, depress pushbutton, Scoop Tube 3A(3B) reset, on Recirc Pump with the scoop-tube-lock and verify Recirc Pump runs back.

Contrary to the above, written procedures were not implemented in that, on April 1,

1997, the Unit Operator failed to depress the Scoop Tube 3B Reset pushbutton for a period of about four minutes when conditions were present that required a

recirculation pump runback.

This is a Severity Level IV Violation (Supplement I),

applicable to Unit 3 only."

TVA's REPLY TO THE VIOLATION 1.

Reason For The Violation The root cause of the violation was a failure of the Unit Supervisor (US) to maintain a broad overview of the plant during an abnormal condition.

Specifically, the US became involved in directing actions to recover from the trip of Reactor Feed Pump Turbine (RFPT).

As such the US failed to provide positive direction to the Unit Operator (UO) to ensure that required automatic actions had been accomplished.

0 0

Abnormal Operating Instruction (AOI), 3-AOI-3-1, Loss of Reactor Feedwater or Reactor Water Level High/Low, requires that at a reactor water level of 27 inches, and if the discharge flow of a Reactor Feed Pump is less than 889,000 lb/hr, the UO is to ensure the Reactor Recirculation Pumps receive a runback si:gnal.

A Reactor Recirculation Pump run back is required to reduce reactor power to

a. level that is within the capability of the remaining Reactor Feedwater Pumps.

On April 1,

1997, BFN Unit 3 experienced a trip of Reactor Feedwater Pump Turbine 3B.

The resulting transient caused reactor level to drop below the level required to initiate the 75 percent speed limi'ter runback on the Reactor Recirculation Pumps.

The remaining Reactor Feedwater Pumps were controlling reactor water level and were returning it to normal.

Reactor

.Recirculation Pump 3A automatically ran back, but 3B had a scoop tube lock in place.and did not automatically runback.

The scoop tube on was electrically locked in place to prevent

movement, and thus prevent reactor recirculation flow fluctuations.

Therefore, operator action was required in order to make Reactor Recirculation Pump 3B run back to the desired speed.

The UO, recognized the need to reset the recirculation pump scoop tube lock when the Reactor Feedwater Pump turbine trip occurred.

However, because the reactor level was returning to normal, the UO was unsure if resetting the scoop tube lock was appropriate.

Consequently, the UO turned to the US for guidance.

.When the UO questioned the US about the scoop tube lock, the US was engaged in diagnosing the cause of the Reactor Feedwater Pump Turbine trip and failed to provide positive guid'ance.

Consequently, the UO did not reset the scoop tube lock for approximately 4 minutes.

Corrective Actions Taken And Results Achieved The US involved in this event was removed from shift duties and reclassified.

The operating crews have been briefed on this event.

The briefing emphasized management expectations with respect to communications.

Furthermore, the briefing emphasized responsibility to take immediate actions per the AOIs without waiting for the US's concurrence.

E-2

.3.

Corrective Ste s That

[Have Been Or] Will Be Taken To Prevent Recurrence The Operations Manager or Operations Superintendent is observing the performance of each operating crew during a simulator scenario which is based on a set of events similar the event described in this violation.. Feedback on the performance is provided to each operating crew.

a.

Date When Full Com liance Will Be Achieved TVA is in full compliance.

RESTATEMENT OF VIOLATION B "Technical Specification 6.8.1.1.c requires that written procedures shall be established, implemented and maintained covering surveillance and test activities of safety-related equipment.

Step 7..17.23.2 of Surveillance Instruction 2-SI-4.2.B.

ATU(C),

Core and Containment Cooling Systems Analog Trip Unit Functional Test, Revision 18, requires that a Volt-Ohm-Meter be connected across contacts M1-Tl of Relay 2-62-3-208C.

Section 7.6 of Surveillance Instruction 3-SI-4..2.B-38FT, High Pressure Coolant Injection System Steam Supply Low Pressure Functional Test, Revision 1, requires that a Volt-Ohm-Meter set on the resistance

scale, be connected between 3-TB-073-0111/KK-18 and 3-TB-073-0111/KK-19 during testing of pressure switch 3-PS-073-0001A.

Contrary to the above, written procedures were not implemented in that:

On April 24, 1997, during the performance of step 7.17.23.2 of Surveillance Instruction 2-SI-4.2.B.-ATU(C),

workers connected the Volt-Ohm-Meter across contacts for Relay 2-62-3-208A instead of relay 2-62-3-208C.

This action resulted in a reactor scram.

2.

'On April 10, 1997, during the performance of Section 7.6 of Surveillance Instruction 3-SI-4.2.B-38 FT, workers did not properly connect the Volt-Ohm-Meter between connection points 3-TB-073-0111/KK-18 and 3-TB-073-0111/KK-19.

This action caused the inadvertent closure of two High Pressure Coolant Injection system steam supply valves.

This is a Severity Level IV violation (Supplement I)."

E-3

~I'

TVA's REPLY. TO THE VIOLATION B EXAMPLE 1 Reason For The Violation The root cause of this example was personnel error in that the craftsmen did not continuously perform self checking.

They properly located the relay to be tested but then broke eye contact with the relay to physically access the test jacks.

While connecting the leads, the craftsmen focused

.on, connecting the test leads to the terminal but failed to reverify that they were on the correct relay.

Consequently, the test leads were incorrectly placed on relay 2-63-208A instead of 2 208C, as required by the Surveillance Instruction (SI).

Contributin Factors:

Labels identifying relays 2-63-208A and 2-63-208C are clearly visible from a standing position.

However, the labels are not visible when connecting test equipment to any of the two lower rows of terminals on the relay base.

2.

Corrective Ste s Taken And Results Achieved TVA administered: personnel corrective actions in accordance with TVA policy to those involved in this example.

Appropriate maintenance personnel have been briefed on management expectations for the performance of instruction steps requiring second-party verification.

TVA has instructed instrument maintenance personnel (IMs) that all components in steps requiring second-party verification must be identified by the placement of a tag such that if visual contact with the component is subsequently lost, the tag will enable the IMs to easily locate the correct component.

TVA placed supplemental labels under the subject relays to facilitate placement of the test leads.

0

3.

Corrective Ste s That

[Have Been Or] Will Be Taken To Prevent Recurrence As.a result of Examples 1 and 2 of this violation, TVA has taken. several actions to address the human performance aspects:

~

TVA has included specific human performance lessons learned in pre-job briefings.

~

In order to focus attention on critical activities, TVA has modified the Scheduled Surveillance Sections of the. Browns Ferry "Plan of the Day" to indicate which SIs could potentially cause a half-scram, an engineered-safety feature actuation, or a turbine trip.

~

TVA has increased management observation of the performance of SIs.

~

TVA has focused on improving pre-job briefings and making better use of pre-job briefings.

~

To foster a deeper sense of accountability for the maintenance shops and crews, TVA has emphasized accountability for personal actions at the general

foreman, foreman, and shop. manager levels.

Date When Full Com liance Will Be Achieved TVA is in full compl'iance..

TVA's REPLY TO THE VIOL'ATION B EXAMPLE 2 Reason For 'The Violation This example resulted from personnel error due to a lack of self checking and second-party verification.

IMs performing an Surveillance Instruction connected volt-ohm meter.

(VOM) leads to the wrong pressure switch contacts.

When the pressure switch under test was valved out and its contacts

closed, the VOM comp],eted the circuitry, actuated the isolation logic, and resulting, in HPCI's inability to perform its intended function.

E-5

i(

Corrective Ste s Taken And Results Achieved Operations personnel stopped IMs testing and returned HPCX to standby readiness.

TVA administered personnel corrective actions in accordance with TVA policy to those involved in this example.

Training of personnel involved in this event was conducted to heighten their awareness about negative consequences of their actions on plant operations.

Additionally, plant standdown meetings were conducted to ensure plant personnel understood management expectations for self checking and second-party verification.

Corrective Ste s That

[Have Been Or] Will Be Taken To Prevent Recurrence Since this example occurred before Example 1 of this violation, it was considered an isolated event.

However, when the Example 1 also happened, TVA took additional steps as depicted in Section 3 of Example 1 above to preclude recurrence.

Date When Full Com liance Will Be Achieved TVA is in full'compliance.