Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18045A566 + (15:26:51, 6 January 2025)
- ML18045A563 + (15:26:52, 6 January 2025)
- ML18045A564 + (15:26:52, 6 January 2025)
- ML18045A562 + (15:26:54, 6 January 2025)
- ML18045A560 + (15:26:54, 6 January 2025)
- ML18045A555 + (15:26:57, 6 January 2025)
- ML18045A556 + (15:26:57, 6 January 2025)
- IR 05000255/1980008 + (15:26:58, 6 January 2025)
- ML18045A551 + (15:27:01, 6 January 2025)
- PNO-III-80-128, on 800702,weld in Generator Seal Oil Filter Failed Causing Gross Leak of Oil Into Turbine Bldg.Turbine Generator Manually Tripped Causing Reactor Trip.Safety Sys Appeared to Have Functioned W/O Challenge to Emergency Sys + (15:27:01, 6 January 2025)
- ML18045A549 + (15:27:03, 6 January 2025)
- ML18045A550 + (15:27:03, 6 January 2025)
- ML18045A548 + (15:27:04, 6 January 2025)
- ML18045A546 + (15:27:05, 6 January 2025)
- ML18045A545 + (15:27:06, 6 January 2025)
- ML18045A543 + (15:27:07, 6 January 2025)
- ML18045A539 + (15:27:08, 6 January 2025)
- ML18045A541 + (15:27:08, 6 January 2025)
- ML18045A537 + (15:27:09, 6 January 2025)
- ML18045A536 + (15:27:10, 6 January 2025)
- 05000255/LER-1980-021-01, /01X-1:on 800725,during Valve Inservice Insp, Operator Opened Containment Sump Valve CV-3030.Valve Stayed Open 36-h.Caused by Operator Error.Valve Closed,Operator Counseled & Shift Turnover Checklist Revised + (15:27:12, 6 January 2025)
- ML18045A530 + (15:27:14, 6 January 2025)
- ML18045A526 + (15:27:15, 6 January 2025)
- 05000255/LER-1980-026-03, /03L-0:on 800719,during Refilling of Safety Injection tanks,FT-0313 Found Inoperable.Caused by Failure to Close Instrument Equalizing Valve During Recent Calibr + (15:27:16, 6 January 2025)
- 05000255/LER-1980-026, Forwards LER 80-026/03L-0 + (15:27:18, 6 January 2025)
- ML18045A519 + (15:27:19, 6 January 2025)
- ML18045A515 + (15:27:21, 6 January 2025)
- ML18045A514 + (15:27:22, 6 January 2025)
- ML18045A511 + (15:27:23, 6 January 2025)
- ML18045A509 + (15:27:25, 6 January 2025)
- RS-18-022, Response to NRC Request for Additional Information for Request for License Amendment to Revise Technical Specification 5.5.12, Primary Containment Leakage Rate Testing Program + (15:27:26, 6 January 2025)
- ML18045A507 + (15:27:29, 6 January 2025)
- ML18045A504 + (15:27:30, 6 January 2025)
- 05000255/LER-1980-025-01, /01T-0:on 800801,during Vol Control Tank Venting, Unplanned Gaseous Release Occurred W/O 15-day Min Holdup. Caused by Either Dirt Trapped in Head Plate & Diaphragm or Uneven Tightening of Compressor Head Bolts + (15:27:31, 6 January 2025)
- 05000255/LER-1980-025, Forwards LER 80-025/01T-0 + (15:27:36, 6 January 2025)
- ML18045A498 + (15:27:38, 6 January 2025)
- IR 05000247/2017004 + (15:27:49, 6 January 2025)
- ML18045A496 + (15:27:50, 6 January 2025)
- ML18045A494 + (15:27:50, 6 January 2025)
- ML18045A493 + (15:27:51, 6 January 2025)
- ML18045A492 + (15:27:52, 6 January 2025)
- 05000255/LER-1980-024-01, /01T-0:on 800731,w/diesel Generator & Charging Pump P-55A Inoperable,Backup Pump P-55B Failed.Diesel Generator Restored in One Hour.Caused by Pump Packing Failure on P-55B.Pump Repacked & Restored to Svc + (15:27:54, 6 January 2025)
- ML18045A490 + (15:27:55, 6 January 2025)
- 05000255/LER-1980-024, Forwards LER 80-024/01T-0 + (15:27:56, 6 January 2025)
- ML18045A487 + (15:27:57, 6 January 2025)
- ML18045A485 + (15:27:58, 6 January 2025)
- ML18045A480 + (15:27:59, 6 January 2025)
- ML18045A478 + (15:28:00, 6 January 2025)
- ML18045A477 + (15:28:00, 6 January 2025)
- 05000255/LER-1980-022-03, /03L-0:on 800710,2-h After Reactor Criticality, Channel NI-03 Not Declared Operable Prior to Reactor Startup.Caused by Failure of Shift Supervisor to Check Control Mechanism + (15:28:07, 6 January 2025)
- 05000255/LER-1980-022, Forwards LER 80-022/03L-0 + (15:28:08, 6 January 2025)