Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18081B135 + (10:49:14, 6 January 2025)
- ML18081B134 + (10:49:16, 6 January 2025)
- ML18081B133 + (10:49:17, 6 January 2025)
- ML18081B132 + (10:49:18, 6 January 2025)
- ML18081B131 + (10:49:19, 6 January 2025)
- ML18081B130 + (10:49:19, 6 January 2025)
- ML18081B128 + (10:49:20, 6 January 2025)
- ML18081B127 + (10:49:20, 6 January 2025)
- ML18081B126 + (10:49:21, 6 January 2025)
- ML18081B124 + (10:49:22, 6 January 2025)
- ML18081B123 + (10:49:23, 6 January 2025)
- ML18081B120 + (10:49:24, 6 January 2025)
- 05000272/LER-1980-006-03, /03L-0:on 800123,power Was Lost to Meteorological Tower Instruments.Caused by Faulty Backup Power Inverter. Inverter Does Not Have Automatic Transfer Switch as Originally Designed + (10:49:26, 6 January 2025)
- 05000272/LER-1980-006, Forwards LER 80-006/03L-0 + (10:49:27, 6 January 2025)
- 05000272/LER-1979-077, Supplemental LER 79-077/03X-1:on 791224,during Startup operations,11ASD Breaker tripped,de-energizing 1A 4 Kv Vital Bus & Supplied Plant Loads.Caused by Failed Components. Logic Drawer & Relay Replaced + (10:49:29, 6 January 2025)
- ML18081B109 + (10:49:34, 6 January 2025)
- ML18081B108 + (10:49:35, 6 January 2025)
- ML18081B107 + (10:49:36, 6 January 2025)
- ML18081B106 + (10:49:37, 6 January 2025)
- ML18081B105 + (10:49:38, 6 January 2025)
- ML18081B104 + (10:49:39, 6 January 2025)
- ML18081B102 + (10:49:40, 6 January 2025)
- ML18081B100 + (10:49:41, 6 January 2025)
- ML18081B097 + (10:49:42, 6 January 2025)
- ML18081B094 + (10:49:44, 6 January 2025)
- ML18081B090 + (10:49:45, 6 January 2025)
- ML18081B087 + (10:49:46, 6 January 2025)
- ML18081B086 + (10:49:47, 6 January 2025)
- PNO-I-80-011, on 800117,during Routine surveillance,tell-tale Spent Fuel Pool Liner Leak Indicator Observed Dripping from Spent Fuel Pool.Investigating to Locate & Correct Leak + (10:49:49, 6 January 2025)
- 05000272/LER-1980-002, Forwards LER 80-002/03L-0.Previous Transmittal Included Incorrect LER Attachments + (10:49:52, 6 January 2025)
- ML18081B082 + (10:49:54, 6 January 2025)
- ML18081B081 + (10:49:55, 6 January 2025)
- ML18081B080 + (10:49:56, 6 January 2025)
- ML18081B078 + (10:49:57, 6 January 2025)
- ML18081B079 + (10:49:57, 6 January 2025)
- ML18081B077 + (10:49:58, 6 January 2025)
- ML18081B076 + (10:49:59, 6 January 2025)
- ML18081B075 + (10:50:00, 6 January 2025)
- 05000272/LER-1980-008-03, /03L-0:on 800129,maint Was Performed on Inboard Containment pressure-vacuum Relief Valve lVC6 Using nonsafety-related Procedures & Nonqualified Parts.Caused by Omission on List of safety-related Control Valves + (10:50:03, 6 January 2025)
- 05000272/LER-1980-008, Forwards LER 80-008/03L-0 + (10:50:13, 6 January 2025)
- ML18081B068 + (10:50:14, 6 January 2025)
- ML18081B064 + (10:50:16, 6 January 2025)
- ML18081B063 + (10:50:17, 6 January 2025)
- ML18081B062 + (10:50:19, 6 January 2025)
- ML18081B060 + (10:50:19, 6 January 2025)
- ML18081B059 + (10:50:20, 6 January 2025)
- ML18081B056 + (10:50:21, 6 January 2025)
- ML18081B054 + (10:50:22, 6 January 2025)
- ML18081B053 + (10:50:23, 6 January 2025)
- ML18081B051 + (10:50:25, 6 January 2025)
- ML18081B049 + (10:50:26, 6 January 2025)