UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 631 PARK AVENUE KING OF PRUSSIA, PENNSYLVANIA 19406 Public Service Electric and Gas Company ATTN:
Mr. F. W. Schneider Vice President - Production 80 Park Place Newark, New Jersey 07101 Gentlemen:
JAN 3 1 1980 The enclosed IE Circular No. 79-25, Supplement A, is forwarded to you for information.. No written response to this circular is required.
If you have any questions related to the subject, pfease contact this office.
Sincerely,
~l!E&~~~
er-- Di rector
Enclosures:
- 1.
IE Circular No. 79-25, Supplement A
- 2.
List of Recently Issued IE Circulars CONTACT:
L. E. Tripp (215-337-5282) cc w/encls:
F. P. Librizzi, General Manager - Electric Production E. N. Schwalje, Manager - Quality Assurance R. L. Mittl, General Manager - Licensing and Environment H. J. Midura, Manager - Salem Generating Station
\\
~-
ENCLOSURE 1 UNITED STATES SSINS No.: 6830 Accession No.:
7912190658 NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON,.D.C.
20555 SHOCK ARRESTOR STRUT ASSEMBLY INTERFERENCE IE Circular No. 79-25 Supplement A
-Date: January 31, 1980 Page 1 of 1 bn December 20; 1979 licensees and holders of construction permits for nuclear power reactors were advised by IE Circular No. 79-25 of a potential problem with Bergen Paterson part 25.40 Strut Assembly used in combination with Pacific Scientific Company mechanical shock arrestors sizes 15K, SOK and 120K.
Bergen Paterson has conducted a detailed review of their records and identified the following nuclear power plants as being affected by the above problem:
- Shoreham #1 Shearon Harri~ #1, 2, 3, & 4 Vi rg.i l C. Summer #1 Limmerick #1 & 2 Three Mile Island #2 Watts Bar #1 Waterford**#3 During the course of this investigation Bergen-Paterson identified an additional problem with the 2540-120 Shock Arrestor Strut Assembly.
The assembly may not be acceptable for applications up to the published load of 120,000 lbs.
Preliminary load testing has indicated that the maximum acceptable load may be only 112,000 lbs.
All Nuclear Power Reactor licensees and holders of construction permits are advised to review their systems for any Bergen Paterson part 2540-120 Shock Arrester Strut Assembly.
Application of these assemblies should be analysed, existing calculations reviewed, and if necessary, recalculated to determine whether loads exceed 112,000 lbs. Strut Assemblies for applications in excess of 112,000 lbs should be replaced by larger units or other acceptable resolution should be made.
... \\.....
Circular No.
79-17 79-18
. 79-19 79-20 79-21 79-22 79-23 79-24 79-25 80-01 80-02
.
- ENCLOSURE 2 IE Circular No. 79-25 Supplement A Date:
January 31, 1980 Page l of 1 RECENTLY ISSUED IE CIRCULARS Subject First Date of lssue Contact Problem in 8/14/79 SB-12 Switches on General Electric
.. Metalclad Circuit Breakers Proper Install at ion of 9/10/79 Target Rock Safety-Reli ef Valves Loose Locking Devices 9/13/79 on Ingersoll-Rand Pumps Failure of GTE Sylvania 9/24/79 Relay,. Type PM Bulletin 7305,* Catalog 5Ul2-11-AC with a 120V AC Coil*
Prevention of Unplanned 10/19/79 Releases of Radioactivity Stroke Times for Power 11/16/79 Operated Relief Valves Moto.r Starters and Con-11/26/79 tactors Failed to Op-erate
.Proper I nsta 11 at ion and 11/26/79 Calibration of Core Spray Pipe Break Detection Equipment on SWRs Shock Arrestor Strut 12/20/79 Assembly Interference Service Advice for GE 1/17/80 Induction Disc Relays Nuclear Power Staff 2/1/80 Work Hours
.Issued to All Power Reactor Licensees with an Opera-ting License (OL} or Con-struction Permit {CP)
.A 11 Power Reactor Licensees with an OL or CP.
All Power Reactor Licensees with an OL or CP All Power Reactor Licensees