Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18101B237 + (06:07:24, 6 January 2025)
- ML18101B235 + (06:07:24, 6 January 2025)
- ML18101B234 + (06:07:25, 6 January 2025)
- PNO-I-96-010, on 960223,util Announced Restart of Unit 1 Will Be Delayed for Indefinite Period to Assess Condition of Four Sgs.Restart of Unit 2 Remains Scheduled for Third Quarter of 1996 + (06:07:27, 6 January 2025)
- ML18101B232 + (06:07:28, 6 January 2025)
- 05000272/LER-1995-029, :on 951219,all 4 Kv Vital Busses Declared Inoperable.Caused by Inadequate Initial Design of GE Type SBM Switches by Mfg.Replaced All Suspect Switches in 4 Kv Switchgear + (06:07:30, 6 January 2025)
- ML18101B230 + (06:07:31, 6 January 2025)
- ML18101B228 + (06:07:32, 6 January 2025)
- ML18101B227 + (06:07:34, 6 January 2025)
- ML18101B226 + (06:07:35, 6 January 2025)
- ML18101B225 + (06:07:36, 6 January 2025)
- ML18101B224 + (06:07:39, 6 January 2025)
- ML18101B222 + (06:07:40, 6 January 2025)
- ML18101B221 + (06:07:41, 6 January 2025)
- ML18101B220 + (06:07:42, 6 January 2025)
- ML18101B218 + (06:07:43, 6 January 2025)
- ML18101B216 + (06:07:43, 6 January 2025)
- ML18101B214 + (06:07:45, 6 January 2025)
- 05000311/LER-1996-001-01, :on 960109,TS Violation Occurred Re Failure to Perform Chemistry Sampling within Required Timeframe.Caused by Personnel Error.Personnel Counseled & Chemistry Dept Shift Turnover Process Improved + (06:07:47, 6 January 2025)
- IR 05000272/1995021 + (06:07:54, 6 January 2025)
- ML18101B209 + (06:07:55, 6 January 2025)
- 05000272/LER-1996-001, :on 960103,discovered Insufficent Thermal Overload Relay Heater Margin.Caused by Inadequate Design of TOLs in 1970s.Issued Calculation ES-18.007 for Sizing of Thermal Overload Heaters for SR Rotating Loads + (06:07:57, 6 January 2025)
- ML18101B205 + (06:07:59, 6 January 2025)
- ML18101B204 + (06:08:04, 6 January 2025)
- ML18101B202 + (06:08:05, 6 January 2025)
- ML18101B201 + (06:08:06, 6 January 2025)
- 05000272/LER-1995-027-01, :on 761211,doses During LOCA Exceeded Plant Licensing Basis Due to Inaccurate Assumptions in Dose Calculations.Revised Procedures in August 1994.W/forwarding Ltr + (06:08:08, 6 January 2025)
- ML18101B194 + (06:08:13, 6 January 2025)
- ML18101B195 + (06:08:13, 6 January 2025)
- ML18101B193 + (06:08:14, 6 January 2025)
- ML18101B191 + (06:08:15, 6 January 2025)
- ML18101B190 + (06:08:17, 6 January 2025)
- ML18101B188 + (06:08:18, 6 January 2025)
- ML18101B187 + (06:08:18, 6 January 2025)
- 05000272/LER-1995-029-01, :on 951219,4 Kv Vital Buses Declared Inoperable.Caused by Inadequate Initial Design of GE Type SBM Switches by Mfg.All Suspect Switches in 4 Kv Switchgear, Vital & Group Busses Replaced + (06:08:20, 6 January 2025)
- 05000311/LER-1995-008-02, :on 951215,Tech Spec 4.9.9 Missed Isolation Testing Discovered.Caused by Lack of Adequate Controls to Ensure All Testing Requirements Addressed.Procedure S2.IC-FT.RM--0088(Q) Revised + (06:08:23, 6 January 2025)
- ML18101B178 + (06:08:25, 6 January 2025)
- RAIO-0418-59505, LLC Response to NRC Request for Additional Information No. 381 (Erai No. 9397) on the NuScale Design Certification Application + (06:08:26, 6 January 2025)
- ML18101B175 + (06:08:28, 6 January 2025)
- ML18101B173 + (06:08:29, 6 January 2025)
- ML18101B174 + (06:08:29, 6 January 2025)
- TAC:M93831 + (06:08:30, 6 January 2025)
- ML18101B172 + (06:08:32, 6 January 2025)
- TAC:M81489 + (06:08:32, 6 January 2025)
- ML18101B171 + (06:08:33, 6 January 2025)
- ML18101B169 + (06:08:34, 6 January 2025)
- ML18101B167 + (06:08:35, 6 January 2025)
- ML18101B166 + (06:08:36, 6 January 2025)
- IR 05000272/1995002 + (06:08:37, 6 January 2025)
- IR 05000272/1995017 + (06:08:39, 6 January 2025)
- ML18101B162 + (06:08:42, 6 January 2025)