Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TAC:M95005 + (06:01:51, 6 January 2025)
- ML18102A249 + (06:01:53, 6 January 2025)
- ML18102A248 + (06:01:54, 6 January 2025)
- 05000272/LER-1996-008-01, :on 960613,failed to Meet Tech Spec Requirement While in Mode 5 for Natural Circulation.Caused by Insufficient Technical Input for Development of Controls. Revised Operating Logs for Mode 5 + (06:01:56, 6 January 2025)
- ML18102A246 + (06:01:58, 6 January 2025)
- ML18102A245 + (06:01:59, 6 January 2025)
- ML18102A244 + (06:02:01, 6 January 2025)
- ML18102A243 + (06:02:03, 6 January 2025)
- ML18102A237 + (06:02:07, 6 January 2025)
- ML18102A238 + (06:02:07, 6 January 2025)
- ML18102A236 + (06:02:10, 6 January 2025)
- IR 05000272/1996005 + (06:02:12, 6 January 2025)
- ML18102A233 + (06:02:13, 6 January 2025)
- ML18102A231 + (06:02:16, 6 January 2025)
- ML18102A232 + (06:02:16, 6 January 2025)
- 05000272/LER-1996-009-01, :on 960530,concluded Potential Common Mode Failure for 4 Kv Magne-Blast Breakers.Caused by Misalignment of Breaker Mechanism & Internals.Assessed Breaker Mechanism Misalignment for Each Breaker + (06:02:19, 6 January 2025)
- ML18102A229 + (06:02:20, 6 January 2025)
- ML18102A227 + (06:02:21, 6 January 2025)
- ML18102A226 + (06:02:24, 6 January 2025)
- ML18102A225 + (06:02:26, 6 January 2025)
- ML18102A223 + (06:02:28, 6 January 2025)
- IR 05000272/1996002 + (06:02:31, 6 January 2025)
- ML18102A221 + (06:02:33, 6 January 2025)
- ML18102A219 + (06:02:34, 6 January 2025)
- ML18102A218 + (06:02:35, 6 January 2025)
- ML18102A217 + (06:02:37, 6 January 2025)
- ML18102A214 + (06:02:38, 6 January 2025)
- SCH96-089, NPDES Monitoring Repts for May 1996 for Salem Generating Station + (06:02:39, 6 January 2025)
- ML18102A211 + (06:02:43, 6 January 2025)
- ML18102A208 + (06:02:45, 6 January 2025)
- 05000272/LER-1996-007-01, :on 960524,determined P-12 Setpoint Above Tech Spec Table 3.3-3 Value.Caused by Incorrect Conversion from Standard Tech Spec for Westinghouse Pressurized Water Reactors. Revised Procedures + (06:02:46, 6 January 2025)
- TAC:M95366 + (06:02:49, 6 January 2025)
- ML18102A203 + (06:02:51, 6 January 2025)
- ML18102A201 + (06:02:52, 6 January 2025)
- ML18102A200 + (06:02:53, 6 January 2025)
- ML18102A199 + (06:02:54, 6 January 2025)
- ML18102A197 + (06:02:55, 6 January 2025)
- ML18102A196 + (06:02:56, 6 January 2025)
- ML18102A195 + (06:02:57, 6 January 2025)
- TAC:M94797 + (06:02:57, 6 January 2025)
- ML18102A194 + (06:03:00, 6 January 2025)
- ML18102A193 + (06:03:01, 6 January 2025)
- ML18102A192 + (06:03:02, 6 January 2025)
- ML18102A191 + (06:03:03, 6 January 2025)
- ML18102A190 + (06:03:07, 6 January 2025)
- ML18102A188 + (06:03:08, 6 January 2025)
- ML18102A186 + (06:03:09, 6 January 2025)
- ML18102A187 + (06:03:09, 6 January 2025)
- 05000311/LER-1996-003-02, :on 960515,failed to Perform Surveillance for Fuel Handling Bldg (Fhb) Ventilation Sys Auto Start.Caused by Lack of Adequate Controls for Surveillance Procedures. Added auto-start Capability + (06:03:11, 6 January 2025)
- 05000311/LER-1996-004-02, :on 960515,failed to Perform Compensatory Radiological Survey.Caused by Personnel Error.Performed Survey,Revised Radiation Protection Schedule,Purchased Alarm Clocks & Counseled Personnel Re Event + (06:03:15, 6 January 2025)
- ML18102A183 + (06:03:17, 6 January 2025)