ML18102A188
| ML18102A188 | |
| Person / Time | |
|---|---|
| Site: | Salem |
| Issue date: | 06/18/1996 |
| From: | Larry Nicholson NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Eliason L Public Service Enterprise Group |
| Shared Package | |
| ML18102A189 | List: |
| References | |
| NUDOCS 9606240220 | |
| Download: ML18102A188 (3) | |
See also: IR 05000272/1996006
Text
June 18 ~ 1996
Mr. Leon R. Eliason
President and Chief Nuclear.Officer
Public Service Electric and Gas Company
P.O. Box 236
.
Hancocks Bridge, NJ
08038
SUBJECT:
NRC INTEGRATED INSPECTION REPORT 50-272/96-06, 50-311/96-06
Dear Mr. Eliason:
On May 18, 1996, the NRC completed an inspection at your Salem I & 2 reactor
facilities. The enclos~d report presents the results of that inspection *. *
During the 6-week period covered by this inspection period, your conduct of
activities at the Salem facilities was generally characterized by safety-
conscious operations, sound engineering and maintenance practices, and careful
radiological work controls.
We are concerned, however, about a violation of
NRC requirements relating to poor procedure use and adherence by your
maintenance department.
The violation is cited in the enclosed Notice of Violation, and the
circumstances surrounding the violation are described in detail in the
enclosed report. Please note that you are required to respond to this letter
and should follow the instructions specified in the enclosed Notice when
preparing your response.
The NRC will use your response, in part, to
determine whether further enforcement action is necessary to ensure compliance
with regulatory requirements~
Acceptable actions were evident in the closure of several previously
identified electrical issues.
We continue, ~owever, to find instances where
the depth of evaluation was not sufficient to ensure the accuracy of your
conclusions. *
We found that PSE&G made progress in resolving the reliability and
configuration tontrol issues with the Hagan process instrumentation modules.
Not all issues pertaining to the Hagan modules, however, received the required
amount of attention. For instance, the modules operating temperature did not
receive the depth of review sufficient to ensure the accuracy of your
conclusions.
In addition, the design change packages for refurbished and
upgraded modules did not contain sufficient justification to demonstrate
acceptability of the safety evaluation and applicability of the design *
equivalency process. This restart issue remains open .
9606240220 960618
ADOCK 05000272
G
\\
)l
Mr. Leon R. Eliason
2
In atcordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of
this letter and its enclosures will be placed in the NRC Public Document Room
(PDR).
Docket Nos.:. 50-272, 50-311
License Nos:
Enclosures:
Sincerely,
ORIGINAL SIGNED BY:
Larry E. Nicholson, Chief
Projects Branch 3
Division of Reactor Projects
Inspection Report 50-272/96-06; 50-311/96-06
Engineering Stand Alone Feeder for Inspection Report Nos.
50-272&311/96-06
cc w/encls:
L. Storz, Senior Vice President ~ Nuclear Operations
E. Simpson, Senior Vice President - Nuclear Engineering
E. .Sa 1 owi tz, Di rector - Nuc 1 ear Business Support
C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.
D. Garchow, General Manager - Salem Operations
J. Benjamin, Director - Quality Assurance & Nuclear Safety Review
D. Powell, Manager, Licensing and Regulation
R. Kankus, Joint Owner Affairs
A. Tapert, Program Administrator
R. Fryling, Jr., Esquire
M. Wetterhahn, Esquire
P. Macfarland Goelz, Manager, Joint Generation
Atlantic Electric
Consumer Advocate, . Office of Consumer Adv.ocate
William Conklin, Public Safety Consultant, Lower Alloways Creek Township
Public Service Commission of Maryland
State of New Jersey
State of Delaware
.
j
.,
-.
Mr. Leon R. Eliason
3
Distribution w/encls:
Region I Docket Room {with concurrences)
Kay Gallagher, DRP
Nuclear Safety Information Center {NSIC)
D. Screnci, PAO
NRC Resident Inspector
PUBLIC
Distribution w/encls: {Via E-Mail)
L. 01 sh an, NRR
W. Dean, OEDO
J. Stolz, PDl-2, NRR
J. Zimmerman, NRR
M. Callahan, OCA
Inspection Program Branch, NRR {IPAS)
DOCUMENT NAME~ a:9606.sal
dOd~nl i::dicds In tho !::ox: "C' = Copy without attachment/enclosure "E" = Copy with
, yio copy
OFFICE
NAME
DATE
OFFICIAL RECORD COPY