Text

June 18 ~ 1996

Mr. Leon R. Eliason

President and Chief Nuclear.Officer

Public Service Electric and Gas Company

P.O. Box 236

.

Hancocks Bridge, NJ

08038

SUBJECT:

NRC INTEGRATED INSPECTION REPORT 50-272/96-06, 50-311/96-06

NOTICE OF VIOLATION

Dear Mr. Eliason:

On May 18, 1996, the NRC completed an inspection at your Salem I & 2 reactor

facilities. The enclos~d report presents the results of that inspection *. *

During the 6-week period covered by this inspection period, your conduct of

activities at the Salem facilities was generally characterized by safety-

conscious operations, sound engineering and maintenance practices, and careful

radiological work controls.

We are concerned, however, about a violation of

NRC requirements relating to poor procedure use and adherence by your

maintenance department.

The violation is cited in the enclosed Notice of Violation, and the

circumstances surrounding the violation are described in detail in the

enclosed report. Please note that you are required to respond to this letter

and should follow the instructions specified in the enclosed Notice when

preparing your response.

The NRC will use your response, in part, to

determine whether further enforcement action is necessary to ensure compliance

with regulatory requirements~

Acceptable actions were evident in the closure of several previously

identified electrical issues.

We continue, ~owever, to find instances where

the depth of evaluation was not sufficient to ensure the accuracy of your

conclusions. *

We found that PSE&G made progress in resolving the reliability and

configuration tontrol issues with the Hagan process instrumentation modules.

Not all issues pertaining to the Hagan modules, however, received the required

amount of attention. For instance, the modules operating temperature did not

receive the depth of review sufficient to ensure the accuracy of your

conclusions.

In addition, the design change packages for refurbished and

upgraded modules did not contain sufficient justification to demonstrate

acceptability of the safety evaluation and applicability of the design *

equivalency process. This restart issue remains open .

9606240220 960618

PDR

ADOCK 05000272

G

PDR

\\

)l

Mr. Leon R. Eliason

2

In atcordance with 10 CFR 2.790 of the NRC's "Rules of Practice," a copy of

this letter and its enclosures will be placed in the NRC Public Document Room

(PDR).

Docket Nos.:. 50-272, 50-311

License Nos:

DPR-70, DPR-75

Enclosures:

Notice of Violation

Sincerely,

ORIGINAL SIGNED BY:

Larry E. Nicholson, Chief

Projects Branch 3

Division of Reactor Projects

Inspection Report 50-272/96-06; 50-311/96-06

Engineering Stand Alone Feeder for Inspection Report Nos.

50-272&311/96-06

cc w/encls:

L. Storz, Senior Vice President ~ Nuclear Operations

E. Simpson, Senior Vice President - Nuclear Engineering

E. .Sa 1 owi tz, Di rector - Nuc 1 ear Business Support

C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.

D. Garchow, General Manager - Salem Operations

J. Benjamin, Director - Quality Assurance & Nuclear Safety Review

D. Powell, Manager, Licensing and Regulation

R. Kankus, Joint Owner Affairs

A. Tapert, Program Administrator

R. Fryling, Jr., Esquire

M. Wetterhahn, Esquire

P. Macfarland Goelz, Manager, Joint Generation

Atlantic Electric

Consumer Advocate, . Office of Consumer Adv.ocate

William Conklin, Public Safety Consultant, Lower Alloways Creek Township

Public Service Commission of Maryland

State of New Jersey

State of Delaware

.

j

.,

-.

Mr. Leon R. Eliason

3

Distribution w/encls:

Region I Docket Room {with concurrences)

Kay Gallagher, DRP

Nuclear Safety Information Center {NSIC)

D. Screnci, PAO

NRC Resident Inspector

PUBLIC

Distribution w/encls: {Via E-Mail)

L. 01 sh an, NRR

W. Dean, OEDO

J. Stolz, PDl-2, NRR

J. Zimmerman, NRR

M. Callahan, OCA

Inspection Program Branch, NRR {IPAS)

DOCUMENT NAME~ a:9606.sal

dOd~nl i::dicds In tho !::ox: "C' = Copy without attachment/enclosure "E" = Copy with

, yio copy

OFFICE

NAME

DATE

OFFICIAL RECORD COPY