June 28, 1996 Mr. Leon R. Eliason Chief Nuclear Officer & President Nuclear Business Unit Public Service Electric and Gas Company P. 0. Box 236 Hancocks Bridge, New Jersey 08038
SUBJECT:
SALEM MANAGEMENT MEETING ON JUNE 11, 1996
Dear Mr. Eliason:
On June 11, 1996, members of the Public Service Electric & Gas Company (PSE&G) met with the U.S. Nuclear Regulatory Commission (NRC) in the Region I Office, King of Prussia, Pennsylvania, to present their efforts to evaluate Salem compliance with their Licensing/Design Bases. is a list of the meeting attendees. is a copy of the slides that were presented during the meeting.
Docket Nos. 50-272/50-311
Enclosures:
- 1.
List of Attendees
- 2.
Slides 9607080214 960628 PDR ADOCK 05000272 P
PDR ORIGINAL SIGNED BY:
Larry E. Nicholson, Chief Projects Branch 3 Division of Reactor Projects
Mr. Leon R. Eliason 2
cc w/encl:
L. Storz, Senior Vice President - Nuclear Operations E. Simpson, Senior Vice President - Nuclear Engineering E. Salowitz, Director - Nuclear Business Support D. Garchow, General Manager - Salem Operations C. Schaefer, External Operations - Nuclear, Delmarva Power & Light Co.
J. Benjamin, Director - Quality Assurance & Nuclear Safety Review D. Powell, Manager, Licensing and Regulation R. Kankus, Joint Owner Affairs A. Tapert, Program Administrator R. Fryling, Jr., Esquire M. Wetterhahn, Esquire P. Macfarland Goelz, Manager, Joint Generation Atlantic Electric Consumer Advocate, Office of Consumer Advocate William Conklin, Public Safety Consultant, Lower Alloways Creek Township Public Service Commission of Maryland State of New Jersey State of Delaware
Mr. Leon R. Eliason 3
Distribution w/encl:
Region I Docket Room (with concurrences)
Kay Gallagher, DRP Nuclear Safety Information Center (NSIC)
D. Screnci, PAO NRC Resident Inspector L. Olshan, Program Manager, NRR W. Dean, OEDO J. Stolz, PDI-2, NRR M. Callahan, OCA Inspection Program Branch, NRR (!PAS)
PUBLIC DOCUMENT NAME:
g:\\branch3\\salemmgt.mtg To receive a copy of this doc:ument, lndica1ll in the box:
'C" = Copy without attachment/enclosure ch I
c1 "N'
"E" = Copy with atta ment e9' osure
=No copy OFFICE RI: DRP I /
16 I
NAME LN i c h,6'U6h DATE 06/z'! /96 OFFICIAL RECORD COPY I
LIST OF PRINCIPAL ATTENDEES LICENSING/DESIGN BASES Leon Eliason, Chief Nuclear Officer and President Lou Storz, Senior Vice President, Nuclear Operations Jeffrey Benjamin, Director QA Mark McGough, Manager, Design Engineering Peter Moeller, QA/NSR David Powell, Licensing & Regulations Manager Gary Overbeck, Director, System Engineer David Smith, Operational Licensing Supervisor, Hope Creek Angela J. Culliton, Engineering Pamela B. Cowan, Engineering George E. Englerd, Jr., Engineering Tim Martin, Regional Administrator, Region I William Kane, Deputy Regional Administrator, Region I Richard Cooper, Director, Division of Reactor Projects, (DRP)
James Wiggins, Director, Division of Reactor Safety, (DRS)
Randolph Blough, Deputy Director, DRS Larry Nicholson, Chief, Projects Branch 3, DRP Eugene Kelly, Chief, Systems Engineering Branch, DRS Charles Marschall, Senior Resident Inspector, Salem Scott Barber, Project Engineer James Linville, Technical Assistant, DRP John Stolz, Project Directorate 1-2, NRR Lenny Olshan, Senior Project Manager, NRR David Jaffe, Senior Project Manager, NRR OUTSIDE Phil Duca, Delmarva Power ENCLOSURE 1
ENCLOSURE 2 SALEMUNIT2 PUBLIC SERVICE ELECTRIC & GAS COMPANY LICENSING I DESIGN BASES PRESENTATION JUNE 11, 1996
' \\ \\ \\ ij ' '
1~yu~
MEETING PURPOSE
~----------------------..
Jv)0J1,~m
- Describe the relationship between our licensing and design bases
- Provide an overview of our "FSAR Project Plan," which we believe will provide reasonable assurance that we will operate Salem within its licensing and design bases
'.. \\ \\ : 1' ' '
- .\\~~~!.,(1.
IA_G_E_N_D~A~~~~~~~~~~~*~~~~l~I~
_;~
,>;_;£t\\1-,1:s.r1rn
- Overview
- Process
- Systems
- People
- Next Steps
- Summary
.'\\\\l!i/;*
.-------LI_CE_N_S_IN_G_l _D_E_S_IG_N_o_v_E_R_V_I_E_w_ ~~'.'.,.
r081\\R-1~m LICENSING BASIS:
- N RC Regulations
- Operating License
- UFSAR
- Docketed Commitments
- NRC SERs DESIGN BASIS (10 CFR 50.2)
DESIGN INFORMATION
- CBDs
- Drawings 9
- Cales
- Specifications
- Engineering Evals.
PEOPLE Self Assessment Self Identified Problems Corrective Action Program
NUCLEAR LICENSING RELATIONAL DIAGRAM Commitments Generic Letters NRC Bulletins etc.
Field Licensing Basis &
FSAR (Complete Prior to Restart)
!D.
Progress DESIGN BASIS PLANT LICENSING BASIS
PROCESS 10CFR50.59 TECH~ 'EC IMPLEMENTATION DESIGN CALCULATIONS CONFIGURATION BASIS DOCUMENTS ENGINEERING PROGRAMS PROCEDURE CHANGE PROCESS DCPs I DRAWINGS I T-MODs SELF ASSESSMENT CORRECTIVE ACTION PROGRAM UFSAR MAINTENANCE PROCESS GREEN - Process in good condition, no major improvements required.
I IMPLEMENTATION YELLOW - Process adequate to provide reasonable assurance for Restart, some improvements needed.
RED - Process improvements needed prior to restart.
SYSTEMS SAFETY ANALYSIS SYSTEMS Auxiliary F c:ed Containment Building Ventilation Feed & Condensate Control Room Indicators Containment Spray Chemical & Volume Control Diesel Generator Feedwater ------------
Main Generator Main Steam Reactor Coolant Rod Control System Residual Heat Removal System Reactor Protection System Safeguard Equipment Cabinet Safety Injection Turbine Bypass Ul
~
c: :=
QJ 0
"'C QJ
~
0::
m s:
Ul
-~
c:
m 0
c:
~
t1l
<(
- J Z'
Cl
~
ii=
c:
t1l 0
en
()
Review Activities Ul Ul Ul c:
QJ 0
c: -
~
- - 0::
t1l
"'C 0::
men 0 m Ul o::-
() c:
E ~
0 6i ~
QJ QJ 1ii *;;
- - "'C Ul *-
QJ QJ -
en o::
o~
~
0::
<(
QJ QJ en 0::
- u.
0::
QJ QJ
-~
- J Ul en 0
(3 LEGEND:
-COMPLETE
-PRIOR TO RESTART I TBD Ira BE DETERMINED
SYSTEMS RISK SIGNIFICANT SYSTEMS 115 v 125 v 230V 460V 4Kv
~~~~~~~~~~~~
Auxiliary Building Ventilation Control Air Containment Building & Penetrations Control Area Ventilation Component Cooling
~~~~~~~~~
Gas Turbine Reactor Control & Protection Service Water Review Acbv1bes
(/)
~
Q) 0::
(/)
(/)
Q) c
- 0 ca Q) 0::
E..........
2* a:::
(/) 0::
>-en en._..
Q)
- J 0:: § Q) +:i u ca ffi c c
Q) a> E Q)
C-
- - a.
ca E
~-
LEGEND:
-COMPLETE PRIOR TO RESTART I rso I To BE DETERMINED
SYSTEMS RISK IMPORTANT SYSTEMS 13Kv 28VDC 500Kv Chill Water
.~~~~~~~~~~~
Diesel Fuel Fuel Handling Building Ventilation Hot Shut Down Nuclear Instrumentation Post Accident Sampling Reactor Vessel Level Spent Fuel Cooling Solid State Protection Review Activities Q)
Q) 0:::
en en Q) c
'C
<1l Q) 0:::
E........
Q) 0:::
Ci) 0:::
>-en en -
Q)
- J 0::: c 0
Q) :;::::;
(..) co c.....
<1l c c
Q) a> E c Q)
- - a.
cu E
~-
0:::
<(
en LL
-~
en
<1l
(..)
t Q) >
~
Q) 0:::
0::: w en LEGEND:
-COMPLETE PRIOR TO RESTART
~TO BE DETERMINED
SYSTEMS OTHER SYSTEMS Bleed Steam & Heater Drains Condensate Polishing Electrohydraulic Control Heat Trace Radiation M;Jnitoring System Station Air Main Turbine Turbine Bypass Review Activities c o en
...... c
~ 3:
- J 0
C> "'O
'+= ~
c-8~
en en Q)
-~ -
"'O c:::
ro c:::
Q) Cl) c:::._...
E 3:
Q)
Q) 1;) *::;:
Q)
Cl) c:::
Q)
- J c::: c 0
Q) :;:::;
o m c......
ro c c::
Q) a> E c Q)
- - a.
m E
~-
~
Q) c:::
c::: w Cl)
LEGEND:
COMPLETE PRIOR TO RESTART rso I To BE DETERMINED
OTHER COMPLETED ACTIVITIES
- Commitment Validat~on
- 1990 - Present (AU)
- 1985 - 1990 - Sample
- Operating Experience Validation
- 1990 - Present
- Sampled Items on Recurring Events Report
- Safety System Functional Reviews (SSFR)
- Systems Completed
- Emergency Operating Procedures
- Reviewed, Updated, and Basis Developed
- System Walk Downs - 79 FSAR Change Notices Issued a
I I
PEOPLE
"*\\
Self Assessment Self Identified Problems I
I
PEOPLE Design Cale Validations Configuration Walk Downs Self sRR Assessment Vertical Slice I FSAR DEF Closure Review Self Identified Problems
)
~ORC CARB Corrective Action MRc Program Performance DEFs Indicators
'~
NEXT STEPS
- Continue with our project plan Fu*~ Jre activities beyond Restart
- Technical Specification Surveillance Improvement Program
- Configuration Baseline Document Validation
- J1EF Closure Quality - additional
- Work with other utilities and determine best practices I
I
}
G I
SUMMARY
- Plant configuration is known and accurate
- Plant upgraded to operate safely and reliably
- The plant will operate within its Technical Specifications
- Known deficiencies are being addressed
- Processes to maintain the Licensing and Design Bases have been improved
- There is a comprehensive long term plan being developed to enhance our Licensing and Design Bases 9