Requests That Ltr Be Provided within 30 Days Confirming Commitments to Resolve Four Discrepancies Identified in Insp Repts 50-272/96-05 & 50-311/96-05
ML18102A208
Person / Time
Site: Salem  PSEG icon.png
Issue date: 06/27/1996
From: Olshan L
NRC (Affiliation Not Assigned)
To: Eliason L
Public Service Enterprise Group
References
NUDOCS 9606280136
Download: ML18102A208 (4)


See also: IR 05000272/1996005

Text

' .~

, \\;.P.R REGIJ

  • ~.;:,"~

~>

e

e

$""o - ;i '7 '2

UNITED STATES

!~o~_,_

~

.

-

.

0

~

.

0

rn

!:

NUCLEAR REGULATORY COMMISSION

0

~ ~

"'

,_

.... ...,

~

1--?

~o"

        • ...

WASHINGTON, D.C. 20555--0001

June 27, 1995*

Mr. Leon R. Eliason

Chief Nuclear Officer & President-

Nuclear Business Unit

Public Service Electric & Gas

Company

Post Office Box 236

Hancocks Bridge, NJ 08038

SUBJECT:

SPENT FUEL SURVEY COMMITMENTS FOR SALEM NUCLEAR GENERATING

STATION, UNITS 1 AND 2 (TAC NO. M94480)

Dear Mr. Eliason:

On March 28 and 2Q, 1996, I visited Salem Nuclear Generating Station, Units 1

and 2.

The Senior Resident Inspector, Mr. Charles Marschall, and I conducted

a survey of the spent fuel practices and spent fuel pool (SFP) cooling system

design and current licensing basis for Salem, Units 1 and 2.

The results of

our survey were published in Inspection Report 50-272/96-05, 50-311/96-05,

dated April 22, 1996.

  • H}

The survey identified four discrepancies which you have committed to resolve.

Specifically, you have committed to (1) updating the current licensing basis

to state that a full core offload is the routine practice during refueling

outages, (2) providing an analysis of the SFP structures and associated

systems to consider SFP water temperatures above 180 °F, (3) developing a

procedure for using the cross connect between the heat exchangers to support

the one unit with the SFP excess heat load, and (4) putting in place

procedural controls that assure that the SFP heat load is maintained below the

analyzed value.

Accordingly, I am requesting that you provide a letter within 30 days of

receipt of this letter that confirms these commitments and indicates the

projected completion dates for each of these actions. These commitments will

then be tracked by the regional office until completion.

I

~ 9606280136 .* 960627

l

PDR .ADOCK 05000272

'*-

Q

.

. PQR.

pf-01 i\\)

'

~*£\\)i/~iillt f?.~ ITT~ VE 11'..lltf!'?" ,~,~~"~fif'.~'ifi;l~*; ' ~~u

  • . ,, '

.*

\\1'"3~,**

f1/"l'j}~ ~l'

!~: '"' ~

~

i'I .

[!

.

.

.

d Ul'.b6 @

  • *

~

" . * *

,

.

- I

' ;..

L. Eli a son

-2-

If you have any questions concerning these items, please contact me on

301-415-1419.

Dricket Nos. 50-272/50-311

cc:

See next page

Sincerely,

Leonard N. Olshan, Senior Project Manager

Project Directorate 1-2

Division of Reactor Projects - I/II

Office of Nuclear Reactor Regulation

Mr. Leon R. Eliason e

Public Service Electric & Gas

Company

cc:

Mark J. Wetterhahn, Esquire

Winston & Strawn

1400 L Street NW

Washington, DC 20005-3502

Richard Fryling, Jr., Esquire

Law Department - Tower SE

80 Park Place

Newark, NJ

07101

Mr. Clay Warren

General Manager - Salem Operations

Salem Generating Station

P.O. Box 236

Hancocks Bridge, NJ

08038

Mr. Louis Storz

Sr. Vice President - Nuclear Operations

Nuclear Department

P.O. Box 236

Hancocks Bridge, New Jersey 08038

Mr. Charles S. Marschall, Senior

Resident Inspector

Salem Generating Station

U.S. Nuclear Regulatory Commission

Drawer 0509

Hancocks Bridge, NJ

08038

Dr. Jill Lipoti, Asst. Director

Radiation Protection Programs

NJ Department of Environmental

Protection and Energy

CN 415

Trenton, NJ

08625-0415*

Maryland Office of People's Counsel

6 St. Paul Street, 21st Floor

Suite 2102

Baltimore, Maryland

21202

Maryland

Ms. R. A. Kankus

Joint Owner Affairs

PECO Energy Company

965 Chesterbrook Blvd., 63C-5

Wayne, PA

19087

e

Salem Nuclear Generating Station,

Units 1 and 2

Richard Hartung

Electric Service Evaluation

Board of Regulatory Commissioners

2 Gateway Center, Tenth Floor

Newark, NJ

07102

Regional Administrator, Region I

U. S. Nuclear Regulatory Commission

475 Allendale Road

King of Prussia, PA

19406

Lower Alloways Creek Township

c/o Mary 0. Henderson, Clerk

Municipal Building, P.O. Box 157

Hancocks Bridge, NJ

08038

Mr. Frank X. Thomson, Jr:, Manager

Licensing and Regulation

Nuclear Department

P.O. Box 236

Hancocks Bridge, NJ 08038

Mr. David Wersan

Assistant Consumer Advocate

Office of Consumer Advocate

1425 Strawberry Square

Harrisburg, PA

17120

P. M. Goetz

MGR. Joint Generation

Atlantic Energy

6801 Black Horse Pike

Egg Harbor Twp., NJ

08234-4130

Carl D. Schaefer

External Operations.- Nuclear .

Delmarva Power & Light Company

P.O. Box 231

Wilmington, DE

19899

Public Service Commission of

Engineering Division

Chief Engineer

6 St. Paul Centre

Baltimore, MD

21202-6806

Mr. Elbert Simpson

Senior Vice President - Nuclear Engineering

Nuclear Department

P.O. Box 236

Hancocks Bridge, New Jersey 08038

., \\

L. Eli as on

-2-

If you have any questions concerning these items, please contact me on

301-415-1419.

Docket Nos. 50-272/50-311

cc:

See next page

DISTRIBUTION:

Docket File

PUBLIC

PDI-2 Reading

SVarga

JZwolinski

JStolz

MO' Brien

LOlshan

OGC

ACRS

LNicholson, RGN-I

OFFICE

NAME

DATE

Sincerely,

Original signed by:

Leonard N. Olshan, Senior Project Manager

Project Directorate I-2

Division of Reactor Projects - I/II

Office of Nuclear Reactor Regulation

PDI-2/D 10 ,/J

'

!,.>

JStolz ~

&/'t-7/96