Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18136A334 + (02:43:52, 6 January 2025)
- IR 05000281/1979079 + (02:43:54, 6 January 2025)
- ML18136A330 + (02:43:55, 6 January 2025)
- ML18136A329 + (02:43:56, 6 January 2025)
- ML18136A328 + (02:43:57, 6 January 2025)
- IR 05000281/1979072 + (02:44:01, 6 January 2025)
- ML18136A325 + (02:44:03, 6 January 2025)
- ML18136A323 + (02:44:04, 6 January 2025)
- ML18136A324 + (02:44:04, 6 January 2025)
- ML18136A322 + (02:44:05, 6 January 2025)
- 05000280/LER-1979-033-03, /03L-0:on 791127,during Normal Operation,Personnel Observed Reduction in Flow & Pressure in Charging Pump Svc Water Subsys.Caused by Broken Stem on 1-SW-107,w/valve Disc Partially Blocking Pump Supply.Valve Replaced + (02:44:08, 6 January 2025)
- ML18136A317 + (02:44:09, 6 January 2025)
- ML18136A318 + (02:44:09, 6 January 2025)
- 05000280/LER-1979-034-01, /01T-0:on 791207,during Reanalysis,Discovered That When Radiation Alarm Setpoint Is Reached in Discharge Line of Air Ejectors of Units 1 & 2,trip Valves Divert Air to Containment.Caused by Valve Design Contrary to FSAR + (02:44:11, 6 January 2025)
- 05000280/LER-1979-034, Forwards LER 79-034/01T-0 + (02:44:12, 6 January 2025)
- ML18136A313 + (02:44:14, 6 January 2025)
- ML18136A311 + (02:44:15, 6 January 2025)
- ML18136A312 + (02:44:15, 6 January 2025)
- ML18136A310 + (02:44:16, 6 January 2025)
- PNO-II-79-015, on 791024,facility Achieved Criticality & Is at 50% Power on 791025.Unit Had Been Shut Down for Seismic Reanalysis of Safety Related Piping + (02:44:18, 6 January 2025)
- ML18136A307 + (02:44:19, 6 January 2025)
- ML18136A308 + (02:44:19, 6 January 2025)
- ML18136A306 + (02:44:20, 6 January 2025)
- ML18136A305 + (02:44:21, 6 January 2025)
- ML18136A304 + (02:44:22, 6 January 2025)
- ML18136A302 + (02:44:23, 6 January 2025)
- ML18136A300 + (02:44:24, 6 January 2025)
- ML18136A298 + (02:44:25, 6 January 2025)
- ML18136A299 + (02:44:25, 6 January 2025)
- ML18136A296 + (02:44:26, 6 January 2025)
- ML18136A295 + (02:44:27, 6 January 2025)
- 05000280/LER-1979-031, Forwards LER 79-031/03L-0 + (02:44:29, 6 January 2025)
- 05000280/LER-1979-037, Forwards LER 79-037/03L-0 + (02:44:32, 6 January 2025)
- 05000280/LER-1979-036-01, /01T-0:on 791128,during Unit Operation,Util Notified by Engineer That Error in Current Containment Depressurization Analysis Assumed Spray Effectiveness Values Too High.Caused by Incorrect Application of Approved Model + (02:44:34, 6 January 2025)
- 05000280/LER-1979-036, Forwards LER 79-036/01T-0 + (02:44:35, 6 January 2025)
- ML18136A283 + (02:44:37, 6 January 2025)
- ML18136A285 + (02:44:37, 6 January 2025)
- ML18136A279 + (02:44:39, 6 January 2025)
- 05000280/LER-1979-026-01, Westinghouse Told Util of Possible Failure of Certain Control Sys,Previously Assumed to Remain as is, to Fail Under Adverse Environ Conditions. FSAR Reviewed.Present Analyses Unaffected + (02:44:40, 6 January 2025)
- 05000280/LER-1979-026, Forwards Updated LER 79-026/01X-1 + (02:44:42, 6 January 2025)
- ML18136A275 + (02:44:43, 6 January 2025)
- ML18136A274 + (02:44:44, 6 January 2025)
- ML18136A273 + (02:44:45, 6 January 2025)
- ML18136A272 + (02:44:46, 6 January 2025)
- ML18136A271 + (02:44:47, 6 January 2025)
- IR 05000280/1979056 + (02:44:48, 6 January 2025)
- ML18136A268 + (02:44:49, 6 January 2025)
- ML18136A267 + (02:44:50, 6 January 2025)
- IR 05000280/1979054 + (02:44:51, 6 January 2025)
- ML18136A264 + (02:44:53, 6 January 2025)
- IR 05000280/1979057 + (02:44:54, 6 January 2025)