Mrs. June Allen 412 Owens Drive Huntsvillei-Alabama 35801
Dear Mrs. Allen:
N.OV. 2 9 1979
/ao,:)<-k/tJ~
9 ".
60 'c}fO 5D¥1 Cr REGULATORY 000:ET m.r COPY The Co1m1ission referred your letter to Commissioner Bradford of September 11, 1979, to the Staff for response~
In your letter) you requested that the CoJlJJlission prepare an Environmental Impact Statement and hold hearings concerning the transport of portions of a replaced steam generator from the Surry Nuclear Power Station to Richland, Washington.
Under the proposed project, the U.S. Department of Energy (DOE} or its prime contractor, Battelle Pacific Northwest Laboratories,.will take possession of the steam generator parts at the Surry Station and transport them to Battel le Pacific Northwest Laboratories in Richland, tfashington.
Although the NRC has regulatory authority over licensed activities at the Surry site, the NRC has no regulatory jurisdiction over DOE, except for those activities specified in Section 202 of the Energy Reorganization Act of 1974 and Sections 104 and 105 of the Uranium Mill Tailings Radiation Control Act of 1978. Battelle, as DOE's prime contractor, would also be ex&~pt from NRC licensing requirements. See, e~g., 10 CFR 30.12, 40.11, 50.11
- and 70.11 of the NRC 's regulations.- -
The Vitrginia El.ectric and Power Company (\\JEPCO) will:. pursuant to the provisions of 10 CFR 30.41, 40.51 *and 70.42 of the Commission's regulations!)
transfer possession of the steam generator to DOE or Battelle at the Surry site. DOE or Batte1le wil 1 package *the steam generator and will transport it to Richland. Although the NRC does not require DOE to submit its packaging plans to the MRC for review, the NRC has an understanding with DOE that DOE will not accept licensed material on sites under the jurisdiction of the NRC except in packages whose design has been approved by the NRC.
OOE (through a contractor) has requested an exemption from the u. S. Department of Transportation 1s (DOT) regulations for shipment of the steam generator.
,lO The NRC wil 1 advise DOT, as approprf ate, concerning the exemption. O (7~ Ir."
7912190 0~ ~
DOE will prepare an environmental assessment of the proposed transport of r*
the steam generator prior to its undertaking. I sugg2st that you contact 1
- I I I t
I OFFICE..
........... *********NOHHOHH-*--*.......................................................................................................................................................................................
SURNAME ill--
NRC FORM 318 (9-76) NRCM 0240
I Mrs. June Allen DOE' s Office of NEPA Affairs regarding the environmental assessment.
You will note that the NRG Staff's Environmental.Impact Appraisal -(at Section*
- 4.4) accompanying Amendment Nos. 46 and 47 which authorized th~ Surry steam generator repair program assessed the impact of a postulated accident which would involve the dropping and rupture of a removed steam generator outside the reactor containment while--i-t was.. being transported to the
- storage vault. The Staff concluded tt),'rt;~~Mg>,o~*eqmin~~s of-'this postulated accident would not be environmentally signi'ficant~
Yoii *were provided a copy of the Staff's Appraisal as an attachment to the "Director's *oecis-ion under 10 CFR 2.206" dated Feb,.. uary l ~ 1979, which denied your,earlier petition concerning the Surry steam generator repair program. **
I trust that the information provided is responsive to your concerns.
DISTRI,BUTlON docket Files 50-280 and 50-281 NRC PDR (2)
Loca 1 PDR NSIC TERA H. Denton W. Dircks V. Stello E. Case H. Berkow D. Vassa 11 o D. Muller R. Mattson H. Sha par D. Eisenhut W. Gammill B. Grimes A. Schwencer S i ncere,1 y, Original Sfgned !:Jy
- n. :t !]er.tcm Harold R. Denton~ Director
. Office of Nuclear Reactcw* Regulation D. Neighbors C. Parrish I&E (3 )"
J. Murray E. Cunningham G. Ertter (ED0-07565)
_ M.. Groff M. Stine.
J. Butts M
- Jam bo r
_ _ "/ _
/J~r 7-1-~-;-:-, ~ ~! -
NRC FORM* 318 (9-76) NRCM 0240 Uil 6, GOVERNMENT PRINTING OFFICE1 16711-8211*1124