In Reply Refer To:
RII:HLW
50-281/79-79
UNITED STATES
- NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA ST., N.W., SUITE 3100
ATLANTA, GEORGIA 30303
NOV 1 * 4 1979
Virginia Electric and Power Company
ATTN:
W. L. Proffitt
Senior Vice President, Power
P. 0. Box 26666
Richmond, VA 23261
-Gentlemen:
This refers to the inspection conducted by H. L. Whitener of this office on
October 15-19, 1979, of activities authorized by NRC Operating License No.
DPR-37 for the Surry Power Station facility, and to the discussion of our findings
held with W. Stewart at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
Within the scope of this inspection, no items of noncompliance'were disclosed.
In accordance with Section 2.790 of the NRC's "Rules of Practice", Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspection
report will be placed in the NRC's Public Document Room. If this report contains
any information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure.
Any such application must
include a full statement of the reasons on the basis of which it is claimed that
the information is proprietary, and should be prepared so that proprietary
information identified in the application is contained in a separate part of the
document. If we do not hear from you in this regard within the specified period,
the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Enclosure:
See Page 2
Sincerely,
£.c. I
R. C. ~ing Chief
Reactor Operations and Nuclear
Support Branch
0
Virginia Electric and Power Company
Enclosure:
Inspection Report No. 50-281/79-79
cc w/encl:
W. L. Stewart, Manager
P. 0. Box 315
Surry, VA
23883
-2-
NOV 1 4 197~