Forwards IE Insp Rept 50-281/79-79 on 791015-19.No Noncompliance Noted
ML18136A330
Person / Time
Site: Surry 
Issue date: 11/14/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Proffitt W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML18136A331 List:
References
NUDOCS 7912310349
Download: ML18136A330 (2)


See also: IR 05000281/1979079

Text

)

i

I

In Reply Refer To:

RII:HLW

50-281/79-79

UNITED STATES

  • NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

NOV 1 * 4 1979

Virginia Electric and Power Company

ATTN:

W. L. Proffitt

Senior Vice President, Power

P. 0. Box 26666

Richmond, VA 23261

-Gentlemen:

This refers to the inspection conducted by H. L. Whitener of this office on

October 15-19, 1979, of activities authorized by NRC Operating License No.

DPR-37 for the Surry Power Station facility, and to the discussion of our findings

held with W. Stewart at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance'were disclosed.

In accordance with Section 2.790 of the NRC's "Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure.

Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary

information identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Enclosure:

See Page 2

Sincerely,

£.c. I

R. C. ~ing Chief

Reactor Operations and Nuclear

Support Branch

0

Virginia Electric and Power Company

Enclosure:

Inspection Report No. 50-281/79-79

cc w/encl:

W. L. Stewart, Manager

P. 0. Box 315

Surry, VA

23883

-2-

NOV 1 4 197~