e UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II In Reply Refer To:
RII:JPO 50-338, 50-339 50-404, 50-405
~80, 50-2~
101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303 NOV 2 6 1979 Virginia Electric and Power Company Attn:
W. L. Proffitt Senior Vice President, Power P. 0. Box 26666 Richmond, Virginia 23261 Gentlemen:
The enclosed IE Circular 79-23 is forwarded to you for your information.
No written response to this Circular is required.
If you have any questions related to the subject, please contact this office.
Sincerely, Director
Enclosures:
- 1.
IE Circular No. 79-23
- 2.
List of Plants That May Have Received Defective Starter or Contactors
- 3.
List of IE Circulars Issued In The Last Six Months oP~
'l 9121 l () / 'i lo, ' Q
Virginia Electric and Power Company cc w/encl:
e W.R. Cartwright, Station Manager Post Office Box 402 Mineral, Virginia 23117 P. G. Perry Senior Resident Engineer Post Office Box 38 Mineral, Virginia 23117 W. L. Stewart, Manager Post Office Box 315 Surry, Virginia 23883 NOV 2 6 1979 e
e SSINS:
6830 Accession No.:
7910250496 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 November 26, 1979 IE Circular No. 79-23 MOTOR STARTERS AND CONTACTORS FAILED TO OPERATE Gould, Inc., Electrical Products Group, reported to the NRC on September 11, 1979 potential defects in certain NEMA size 3, Starters and Contactors.
A possible binding or seizure of the carrier assembly, within the support plate of the stationary contact assembly, is caused by an undersized dimension of the support legs.
Starters and contactors with date code 7822 to 7935, model and serial numbers AlO, All, A12, A13, A14, A20, A21, A22, and PlO are involved.
Faulty units were manufactured and distributed between June 1, 1978 and August 30, 1979.
The attached listing of nuclear plants, which have received some of this motor control equipment, represents a preliminary check of shipment records.
This listing, however, may not be complete.
Gould, Inc., will recall uninstalled items for retrofit and has retrofit kits available for field installation.
Based on the above, licensees are advised to verify all motor starter and contactor shipments received from Gould, Inc.,.between June 1, 1978 and August 30, 1979, and assure that applicable model and serial number components are corrected by retrofit and subsequent electrical operation tests.
No written response to this Circular is required.
If you desire additional information regarding this matter, contact the Director of the appropriate NRC Regional Office.
e According to a preliminary check of Gould's shipment records, the following nuclear facilities have been shipped motor control equipment which could include one or more defective NEMA Size 3 starters or contactors:
Facility Farley Nuclear Plant, Unit 1 Operation 8-77 Arkansas Nuclear Plt. One Unit 2 Operation 12-77 Shearon Harris Nuclear Plt.
Unit 1 Construction Zimmer Nuclear Station Unit 1 Construction Midland Construction Fermi 2 Nuclear Station Construction Beaver Valley Unit 2 Construction Clinton Nuclear Station Units 1&2 Construction Wolf Creek Unit 1 Construction San Onofre Nuclear Gen. Sta 2/3 Construction Kuosheng Nuclear Pwr. Sta. Units 1&2 Construction Bellefonte Nuclear Plant Construction Watts Bar Units 1&2 Construction Owner/Contractor Alabama Power Bechtel Arkansas Power & Light Bechtel Purchase Order FNPl-3676 FNP2-131 FNP2-125B 6600-E2011-AC Rev. 1B Carolina Power and Light NY-435120 Ebasco 1
Cincinnati G & E Consumers Power Co.
Bechtel Detroit Edison Sargent & Lundy Duquesne Light Co.
Stone & Webster Illinois Power Co.
Baldwin Assoc.
Kansas Gas & Electric Bechtel (SNUPPS)
Limitorque Taiwan Power Co.
Bechtel TV A TV A Z-50001 7220-E-7-AC lE-90235 Change Order 6 2BV-310 Contract K-2976 10466-E-018-1 3A4777 9713-E-0003A 76K5-86242 74C5-84646 Date~
Shipped 7-21-78 7-20-78 4-24-79 12-18-78 7-31-79 8-20-79 8-31-79 12-14-78 Various Ship-ments in 78 & 79 8-14-78 Various Ship-ments in 78 & 79 8-24-78 Various Ship-ments in 78 & 79 12-26-78 1-8-79 Various Ship-ments in 78 & 79 Various Ship-ments in 78 &
79 Page 1 of 2
Continued
'Page 2 of 2 Facility Callaway Unit 1 Construction WPPSS Nuclear Project Unit 2 Construction Owner/Construction Union Electric-Bechtel (SNUPPS)
WPPSS Burns & Roe e*
Order 10466-E-018-2 Contract No.
49 C/D 7 Shipped Various Ship-ments in 78 &
79 Various Ship-ments in 78
& 79
IE Circular No. 79-23 November 26, 1979 Circular No.
79-23 79-22 79-21 79-20 79-19 79-18 79-17 79-16 79-15 (Correc-tion)
LIST OF IE CIRCULARS ISSUED IN THE LAST SIX MONTHS Subject Motor Starters and Con-tactors Failed to Operate Date of Issued 11/26/79 Stroke Times for Power 11/16/79 Operated Relief Valves Prevention of Unplanned 10/19/79 Releases of Radioactivity Failure of GTE Sylvania 9/24/79 Relay, Type PM Bulletin 7305, Catalog SU12-ll-AC With A 120V AC Coil Loose Locking Devices 9/13/79 on Ingersoll-Rand Pumps Proper Installation of 9/10/79 Target Rock Safety-Relief Valves Contact Problem in SB-12 8/14/79 Switches on General Electric Company Metalclad Circuit Breakers Excessive Radiation Exposures 8/16/79 To Members Of The General Public And A Radiographer Bursting of High Pressure Hose 8/22/79 and Malfunction of Relief Valve "O" Ring in Certain Self-Contained Breathing Apparatus Enclosure Page 1 of 2 Issued to All Power Reactor Operating Facilities and Holders of Reactor Construction Permits All Power Reactor Operating Facilities and all Facilities Having a CP All Power Reactor Operating Facilities and all Facilities Having a CP All Power Reactor Operating Facilities and all Utilities Having a CP All Power Reactor Operating Facilities and all Utilities Having a CP All Power Reactor Licensees wi,th a CP and/or OL All Power Reactor Licensees with a CP and/or OL All Radiography Licensees All Research Reactors
1*
IE Circular No. 79-23 November 26, 1979 Circular No.
79-15 79-14 79-13 79-12 79-11 79-10 79-09 LISTING OF IE CIRCULARS ISSUED IN LAST SIX MONTHS Subject Date of Issue Bursting of High Pressure Hose 8/8/79 and Malfunction of Relief Valve "O" Ring in Certain Self-Contained Breathing Apparatus Unauthorized Procurement and Distribution of XE-133 Replacement of Diesel Fire Pump Starting Contactors Potential Disel Generator Turbocharger Problem Design/Construction Interface Problem Pipefittings Manufactured from Unacceptable Material Occurrences of Split or Punctured Regulator Diaphragms In Certain Self Contained Breathing Apparatus 7 /13/79 7 /13/79 6/28/79 6/27 /79 6/26/79 6/22/79 Enclosure Page 2 of 2 Issued to All Materials Priority I, Fuel Cycle and Operating Power Reactor Licensees All Medical Licensees Except Teletheraphy Medical Licensees and to all Radiopharmaceu-tical Suppliers All Power Reactor Operating Facilities and all Utilities Having a CP All Power Reactors Operating Facilities and all Utilities Having a CP All Applicants for, and Holders of Power Reactor CPs All Power Reactor Licensees with a CP and/or OL All Materials Priority I, Fuel Cycle and Operating Reactor Licensees