- ML18139A826 + (02:17:26, 6 January 2025)
- ML18139A825 + (02:17:28, 6 January 2025)
- ML18139A824 + (02:17:29, 6 January 2025)
- ML18139A822 + (02:17:30, 6 January 2025)
- ML18139A820 + (02:17:31, 6 January 2025)
- 05000281/LER-1980-029-03, /03L-0:on 801012,svc Water Pump 2-SW-P-10A Developed Low Discharge Pressure.Caused by Eel Lodged in Impeller.Eel Removed,Pump Returned to Svc + (02:17:32, 6 January 2025)
- 05000281/LER-1980-029, Forwards LER 80-029/03L-0 + (02:17:34, 6 January 2025)
- 05000280/LER-1980-067-01, /01T-0:on 801028,indications Found on All Three Steam Generators.Caused by Original Const.Weld Areas Will Be Completely Machined Out & Replaced + (02:17:36, 6 January 2025)
- 05000280/LER-1980-067, Forwards LER 80-067/01T-0 + (02:17:37, 6 January 2025)
- ML18139A813 + (02:17:39, 6 January 2025)
- ML18139A812 + (02:17:40, 6 January 2025)
- ML18139A811 + (02:17:41, 6 January 2025)
- ML18139A810 + (02:17:42, 6 January 2025)
- 05000281/LER-1980-030-03, /03L-0:on 801013,at 100% power,PT-27B Indicated Low Amp Reading on Circuit 6A,boric Acid to Blender Panel 10.Caused by Heat Tracing Failure Due to Mechanical Damage Sustained from Erecting Scaffolding + (02:17:43, 6 January 2025)
- 05000281/LER-1980-030, Forwards LER 80-030/03L-0 + (02:17:45, 6 January 2025)
- ML18139A806 + (02:17:46, 6 January 2025)
- ML18139A805 + (02:17:47, 6 January 2025)
- ML18139A804 + (02:17:49, 6 January 2025)
- 05000281/LER-1980-027-03, /03L-0:on 801005,w/unit at 100% power,PT-27B Revealed That Amp Reading for Circuit 6A,boric Acid to Blender,Panel 11 Was Below Acceptance Criteria.Caused by Failure of Heat Tracing Tape Due to Excessive Heat + (02:17:57, 6 January 2025)
- 05000281/LER-1980-026-03, /03L-0:on 801005,w/reactor at 100% Power & Redundant Low Head Safety Injection Pump Out of Svc for Maint,Operator Failed to Retest Operable Pump 2-SI-P-1a within Specified Time.Caused by Operator Oversight + (02:17:59, 6 January 2025)
- 05000281/LER-1980-023-03, /03L-0:on 801003,while Operating at 100% Power, During Periodic Test 27D,low Amp Readings Found on Circuit 1B,panels 10 & 11,causing Valve MOV-2867D to Be Considered Inoperable.Caused by Damaged Heat Tracing Tapes + (02:18:00, 6 January 2025)
- ML18139A794 + (02:18:02, 6 January 2025)
- ML18139A795 + (02:18:02, 6 January 2025)
- ML18139A792 + (02:18:04, 6 January 2025)
- IR 05000280/1980032 + (02:18:05, 6 January 2025)
- ML18139A790 + (02:18:07, 6 January 2025)
- ML18139A788 + (02:18:08, 6 January 2025)
- ML18139A789 + (02:18:08, 6 January 2025)
- ML18139A786 + (02:18:09, 6 January 2025)
- ML18139A785 + (02:18:11, 6 January 2025)
- ML18139A783 + (02:18:12, 6 January 2025)
- 05000280/LER-1979-012-03, During Shutdown Functional Test of 74 Snubbers Revealed 21 Not Meeting Design Criteria.Caused by Snubbers Not Being Readjusted to Design Conditions.Units Reset + (02:18:14, 6 January 2025)
- 05000280/LER-1979-012, Forwards Updated LER 79-012/03X-1 + (02:18:15, 6 January 2025)
- ML18139A778 + (02:18:16, 6 January 2025)
- ML18139A777 + (02:18:17, 6 January 2025)
- ML18139A776 + (02:18:18, 6 January 2025)
- ML18139A773 + (02:18:21, 6 January 2025)
- 05000280/LER-1980-018-03, /03L-0:on 800924,charging Pump Svc Water Pump 2-SW-P-10A Would Not Develop Proper Discharge Head.Caused by Buildup of Matl That Had Been Entrained in Suction Side of Pump.Pump Inspected,Cleaned & Tested + (02:18:22, 6 January 2025)
- ML18139A771 + (02:18:24, 6 January 2025)
- 05000280/LER-1980-068-03, /03L-0:on 800923,radiation Monitoring Sampling Pumps 1-SW-P-5C & D Were Found to Be Inoperable.Caused by Corroded Pump Impeller & Seals.Pumps Will Be Removed,Tested & Inspected Prior to Startup + (02:18:25, 6 January 2025)
- ML18139A768 + (02:18:26, 6 January 2025)
- 05000281/LER-1980-028-03, /03L-0:on 800926,w/unit at 100% Power,Reduction in Svc Water Pressure to Charging Pumps Experienced.Caused by Missing Valve Disk for Check Valve 2-SW-112.Valve Replaced + (02:18:28, 6 January 2025)
- 05000281/LER-1980-028, Forwards LER 80-028/03L-0 + (02:18:30, 6 January 2025)
- ML18139A764 + (02:18:31, 6 January 2025)
- ML18139A763 + (02:18:32, 6 January 2025)
- ML18139A762 + (02:18:33, 6 January 2025)
- ML18139A761 + (02:18:34, 6 January 2025)
- ML18139A760 + (02:18:35, 6 January 2025)
- ML18139A759 + (02:18:36, 6 January 2025)
- ML18139A758 + (02:18:37, 6 January 2025)
- ML18139A757 + (02:18:39, 6 January 2025)
- 05000280/LER-1980-025-03, /03L-0:on 801003,w/Unit 2 at 100% Power,Periodic Test 27D Revealed That Amperage for Circuit 2A Panel 10 Was Below Acceptance Criteria.Caused by Damaged Heat Tracing Tape.Verified That Redundant Circuit Was Operable + (02:18:40, 6 January 2025)