Forwards Suppl 3 to IE Bulletin 79-01B, Environ Qualification of Class IE Equipment. No Written Response Required
ML18139A824
Person / Time
Site: Surry, North Anna  
Issue date: 10/24/1980
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Ferguson J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
References
NUDOCS 8011170672
Download: ML18139A824 (4)


Text

~'.

-~

e UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II In Reply Refer RII:JPO 50-338

~

~

To:

101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303 OCT 2 4 1980 Virginia Electric and Power Company ATTN: J. H. Ferguson Executive Vice President-Power P. 0. Box 26666 Richmond, VA 23261 Gentlemen:

CJ (i)

0 (lF
~

~

I'\\)

U1 vJ.

Enclosed is IE Supplement No. 3 to Bulletin 79-0lB. This supplement clarifies two issues raised by Supplement No. 2.

These are (1) the submittal of qualifi-cation information for equipment resulting from TMI Action Plan requirements and (2) the qualification of equipment which is required to achieve a cold shut-down condition.

This action is a result of industry feedback to NRC regarding interpretation of Supplement No. 2. The information presented is applicable to your submittal regarding environmental qualification of Class lE equipment which is required by November 1, 1980.

Should you have questions regarding this Supplement, please contact this office.

Enclosures:

1.

IE Supplement No. 3 to IE Bulletin No. 79-0lB

2.

List of Recently Issued IE Bulletins cc w/encl:

Sincerely, James P. O'Reilly Director W.R. Cartwright, Station Manager P. G. Perry, Senior Resident Engineer J. L. Wilson, Manager Q

'1 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 October 24, 1980 e

SSINS No. : 6820 Accession No.:

8008220248 IE Bulletin No. 79-0lB Supplement No. 3: ENVIRONMENTAL QUALIFICATION OF CLASS IE EQUIPMENT Description of Circumstances:

Two issues were raised by Supplement No. 2 which require clarification.

These ar~:

(1) the dates required for submittal of qualification information for TMI related equipment, and (2) whether the equipment required to achieve a Cold Shutdown condition must be environmentally qualified if the licensing basis for the plant was a Hot Safe Shutdown condition.

(1)

Supplement No. 2 (Q.l, Q.5) addressed the minimwµ cold shutdown require-ments.

The staff position on this issue is that the licensee must identify and environmentally qualify the equipment needed to complete one method (path) of achieving and maintaining a cold. shutdown condition.

The equipment of other paths must be reviewed to assure that its failure will not aggravate or contribute to the accident (ref. Q.5 Supp. No. 2).

Due to an inconsistency between Supplement No. 1 and Supplement No. 2, the staff position on this issue was unclear.

Therefore, the following will apply:

a.

The qualification information for equipment needed to achieve and maintain a Hot Safe Shutdown condition must be submitted not later than November 1, 1980.

b.

The qualification information for equipment required to achieve and maintain a Cold Shutdown condition (ref: Q.l and Q.5 of Supplement No. 2) must be submitted not later than February 1, 1981.

(2)

IEB 79-0lB required a 90 day response which was due in mid-April 1980.

Supplement 1 (Feb. 1980) informed licensees that equipment which was "planned" to be installed as a result of lessons learned need not be addressed in that response.

Some of this equipment has since been installed.

Supplement No. 2 (Q.5, Q.21) identified that the staff posi-tion was that equipment which is installed should be treated in a manner similar to all other safety-related electrical equipment and be addressed in the November 1, 1980 submittal.

This position represents no change in staff position regarding the scope of the review.

However, since the staff position on this issue was unclear the following will apply:

a.

Qualification information for installed TMI Action Plan equipment must be submitted by February 1, 1981.

b.

Qualification information for future TMI Action Plan equipment (ref.

NUREG-0737, when issued), which requires NRC pre-implementation review, must be submitted with the pre-implementation review data.

,;*\\,*

t e IEB 79-0lB Sup #3 October 24, 1980 Page 2 of 2

c.

Qualification information for TMI Action Plan equipment currently under NRC review should be submitted as soon as possible.

d.

Qualification information for TMI Action Plan equipment not yet installed which does not require pre-implementation review should be submitted to NRC for review by the implementation date.

The above items 1 and 2 represent no change in staff position regarding the scope of the 79-0lB Supplement 2 review.

IE Bulletin No. 79-0lB was issued under a blanket GAO clearance (B180225 (R0072), clearance expired July 31, 1980) specifically for identified generic problems.

Supplement No. 3 to Bulletin 79-0lB is for information, hence no GAO clearance is required.

Bulletin No.

Supplement 3 to 79-0lB Supplement 2 to 79-0lB 80-22 79-26 Revision 1 80-20 80-19 80-18 Supplement 2 to 80-17 Supplement.1 to 80-17 80-17 80-16 RECENTLY ISSUED IE BULLETINS Subject Date Issued Environmental Quaiification 10/24/80 of Class lE Equipment Environmental Qualification 9/30/80 of Class lE Equipment Automation Industries, 9/11/80 Model 200-520-008 Sealed-source Connectors Boron Loss from BWR 8/29/80 Control Blades Failures of Westinghouse 7/31/80 Type W-2 Spring Return to Neutral Control Switches Failures of Mercury-7/31/80 Wetted Matrix Relays in Reactor Protective Systems of Operating Nuclear Power Plants Designed by Combus-tion Engineering Maintenance of Adequate 7/24/80 Minimum Flow Thru Centrifugal Charging Pumps Following Secondary Side High Energy Line Rupture Failures Revealed by 7/22/80 Testing Subsequent to Failure of Control Rods to Insert During a Scram at a BWR Failure of Control Rods 7/18/80 to Insert During a Scram at a BWR Failure of Control Rods 7/3/80 to Insert During a Scram at a BWR Potential Misapplication of 6/27/80 Rosemount Inc., Models 1151 and 1152 Pressure Transmitters with Either "A" or "D" Output Codes

~IEB 79-01 Sup #3 October 24, 1980 Issued To All power reactor facilities with an OL All power reactor facilities with an OL All radiography licensees All BWR power facilities with an OL To each nuclear power facility in your region having an OL or a CP All nuclear power facilities having either an OL or a CP All PWR power reactor facilities holding OLs and to those PWRs nearing licensing All BWR power reactor facilities holding OLs All BWR power reactor facilities holding OLs All BWR power reactor facilities holding OLs All Power Reactor Facilities with an OL or a CP