ML18139A763

From kanterella
Jump to navigation Jump to search
Forwards IE Circular 80-22, Confirmation of Employee Qualifications. No Written Response Required
ML18139A763
Person / Time
Site: Surry, North Anna  
Issue date: 10/02/1980
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Ferguson J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
References
NUDOCS 8010270555
Download: ML18139A763 (3)


Text

'-"

,\\

  • I-e UNITED STATES e

NUCLEAR REGULATORY COMMISSION REGION II 101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303 OCT 2 1980 Virginia Electric and Power Company ATTN: J. H. Ferguson Executive Vice President-Power P. 0. Box 26666 Richmond, VA 23261 Gentlemen:

The enclosed IE Circular No. 80-22, is forwarded to you for information.

No written response is required. Should you have any questions related to your understanding of the recommendations on this matter, please contact this office.

Enclosures:

1.

IE Circular No. 80-22

2.

List of Recently Issued IE Circulars cc w/encl:

W.R. Cartwright, Station Manager Sincerely, James P. O'Reilly Director P. G. Perry, Senior Resident Engineer J. L. Wilson, Manager

/

8010270 5 55

~

~

e UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D. C.

20555 October 2, 1980 SSINS: 6830 Accession No.:

8006190055 IE Circular No. 80-22: CONFIRMATION OF EMPLOYEE QUALIFICATIONS In recent months, the Nuclear Regulatory Commission has determined that in two unrelated actions a utility and an architect-engineering company employed tech-nically unqualified individuals as designers/engineers by failing to confirm the validity of their technical and educational qualifications as presented in their employment applications.

In both of these instances, the employers mistakenly assumed that the personnel firms supplying these individuals had investigated and confirmed previous career experiences. In view of the fact that the unquali-fied persons in both of these cases were discovered as a result of allegations to this effect, rather than through internal company procedures, we believe that this matter warrants your attention.

We are hereby recommending that your employment procedures be reviewed to deter-mine that your company has in effect employment policies which confirm the professional qualifications of employees.

In the event you conclude that your present procedures do not fully address this matter, we recommend that you take prompt remedial action in this regard.

No written response to this Circular is required. If you desire additional information regarding this subject, contact the Director of the appropriate NRC Regional Office.

---... --~-*--

...... ~-

"T"-

"*--*** - **-**x,-* *~--~.... * *.'

  • -*"*******.~**-::*-.. *-*** ~--****:*------~.--,--- -***-**""'>;"
  • Circular
    • No.

80-22 80-21 80-20 80-19 80-18 80-17 80-16 80-15 80-14

'80:-13 80-12

. **- ----**---~*~ -*-***- *-4* ~

...._.- A.',.-~--,..... *' ****-*- **

RECENTLY ISSUED IE CIRCULARS Subject Confirmation of Employee Qualifications Regulation of refueling crews Changes in Safe-Slab Tank Dimensions Noncompliance with License Requirements for Medical Licensees 10 CFR 50.59 Safety Evaluations for Changes to Radioactive Waste Treatment Systems Fuel Pin Damage Due to Water Jet from Baffle Plate Corner Operational Deficiencies In Rosemount Model 510DU Trip Units And Model 1152 Pressure Transmitters Loss of Reactor Coolant Pump Cooling and Natural Circula-

. tion Cooldown Radioactive Contamination of Plant Demineralized Water System and Resultant Internal Contamination of Personnel Grid Strap Damage in Westinghouse Fuel Assemblies Valve-Shaft-To-Actuator Key May Fall Out of Place When Mounted Below Horizontal Axis Date of

  • Issue 10/2/80 9/10/80 8/21/80 8/26/80 8/22/80 7/23/80 6/27/80 6/20/80 6/24/80 5/18/80 5/14/80 e

IEC 80-22 October 2, 1980 Issued to All holders of a power reactor OL or CP All holders of a power reactor OL or CP All Part 50 and Part 70 fuel facility licensees All medical licensees All power reactor facilities with an OL or CP All holders of PWR OLs and PWR CPs All power reactor facilities with an OL or a CP All power reactor facilities with an OL or CP All holders of power and research reactor licenses (operating and construction permits), and fuel cycle licensees_

All holders of reactor OLs and CPs All holders of reactor

.OLs and CPs