Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML18152B256 + (00:41:35, 6 January 2025)
- IR 05000280/1988029 + (00:41:36, 6 January 2025)
- 05000280/LER-1988-038, :on 880928,three Recirculation Spray HXs Filled W/Svc Water Discovered.Caused by Leakage Past Normally Closed Recirculation Spray HX Inlet Isolation Valves.Samples Taken + (00:41:39, 6 January 2025)
- ML18152B253 + (00:41:40, 6 January 2025)
- ML18152B252 + (00:41:41, 6 January 2025)
- ML18152B250 + (00:41:42, 6 January 2025)
- ML18152B249 + (00:41:43, 6 January 2025)
- IR 05000280/1988028 + (00:41:45, 6 January 2025)
- 05000280/LER-1988-037, :on 880918,electrical Penetration Not Completely Filled W/Fire Retardant Foam,Surrounding Cables as Required.Fire Watch Not Posted within Hour of Discovery. Caused by Personnel Error.Personnel Counseled + (00:41:47, 6 January 2025)
- ML18152B246 + (00:41:48, 6 January 2025)
- ML18152B245 + (00:41:50, 6 January 2025)
- IR 05000280/1988033 + (00:41:56, 6 January 2025)
- ML18152B242 + (00:41:57, 6 January 2025)
- ML18152B240 + (00:41:58, 6 January 2025)
- ML18152B239 + (00:41:59, 6 January 2025)
- ML18152B238 + (00:42:00, 6 January 2025)
- 05000280/LER-1988-032, :on 880913,three Emergency Diesel Generators Declared Inoperable Due to Design Deficiency.Caused by Incorrect Design Assumption That Worst Case Scenario Was hi-hi Actuation.Design Change Generated + (00:42:01, 6 January 2025)
- ML18152B234 + (00:42:02, 6 January 2025)
- ML18152B233 + (00:42:05, 6 January 2025)
- 05000280/LER-1988-036, :on 880912,charging Pump Component Cooling Water Sys Declared Inoperable When Both Charging Pump CC Pumps Became Air Bound Following Return to Service of a Intermediate Seal Cooler + (00:42:07, 6 January 2025)
- ML18152B231 + (00:42:08, 6 January 2025)
- 05000281/LER-1988-022-01, :on 880910,reactor Trip by Turbine Trip Occurred While Attempting to Maintain Turbine at Synchronous Speed.Caused by Inadequate Procedure & Faulty Valve Position Indication.Testing to Be Performed + (00:42:10, 6 January 2025)
- ML18152B219 + (00:42:12, 6 January 2025)
- ML18152B220 + (00:42:12, 6 January 2025)
- ML18152B218 + (00:42:13, 6 January 2025)
- ML18152B217 + (00:42:14, 6 January 2025)
- ML18152B216 + (00:42:15, 6 January 2025)
- ML18152B212 + (00:42:16, 6 January 2025)
- ML18152B213 + (00:42:16, 6 January 2025)
- PNO-II-88-056, on 880914,Unit 1 Shut Down.Caused by Determination That Both Emergency Diesel Generators Would Be Overloaded If Loss of Offsite Power Occurred Between 5 & 60 Minutes After Loca.Condition Exists for Both Units + (00:42:18, 6 January 2025)
- ML18152B209 + (00:42:19, 6 January 2025)
- ML18152B208 + (00:42:20, 6 January 2025)
- 05000280/LER-1988-029, :on 880815,reactor Trip & Safety Injection Occurred.Caused by Spurious Initiation of Train a High Consequence Limiting Safeguard.Relay Replaced & Limit Switch on Steam Dump Valve Adjusted + (00:42:21, 6 January 2025)
- 05000280/LER-1988-025, :on 880815,control/relay Room Chillers Inoperable.Caused by Inadequate Svc Water Flow to Chiller Condensers as Result of Method to Start/Stop Chillers.Addl Procedure Will Be Developed + (00:42:23, 6 January 2025)
- ML18152B203 + (00:42:25, 6 January 2025)
- ML18152B202 + (00:42:25, 6 January 2025)
- ML18152B200 + (00:42:26, 6 January 2025)
- ML18152B198 + (00:42:27, 6 January 2025)
- ML18152B197 + (00:42:28, 6 January 2025)
- ML18152B195 + (00:42:29, 6 January 2025)
- ML18152B194 + (00:42:33, 6 January 2025)
- ML18152B193 + (00:42:34, 6 January 2025)
- ML18152B191 + (00:42:35, 6 January 2025)
- ML18152B192 + (00:42:35, 6 January 2025)
- ML18152B189 + (00:42:36, 6 January 2025)
- PNO-II-88-052, on 880517,partial Loss of Water in Refueling Cavity Occurred Due to Seal Failure During Refueling Outage. Review of Circumstances Planned + (00:42:38, 6 January 2025)
- 05000281/LER-1988-018-02, :on 880811,steam Generator B Channel III Steam Flow Failed to High Flow Indication.Failed Multiplier/ Divider Replaced.Affected Channels Placed in Trip Mode + (00:42:40, 6 January 2025)
- PNO-II-88-052A, on 880831,augmented Insp Team Dispatched to Investigate Partial Loss of Water from Refueling Cavity. Licensee Submits Justification for Continued Operation.Nrc Plans to Meet W/Licensee to Discuss Actions + (00:42:42, 6 January 2025)
- PNO-II-88-051, on 880826,plant Personnel Were Moving Spent Fuel Cask Using Transporter to Remote Dry Cask Storage Area on Site & Transporter Tilted About Six Degrees.Licensee Used Steel Bed Plates to Jack Up & Support Transporter + (00:42:44, 6 January 2025)
- TAC:64766 + (00:42:46, 6 January 2025)
- ML18152B181 + (00:42:46, 6 January 2025)