ML18152B209

From kanterella
Jump to navigation Jump to search
Confirms 880907 Telcon Re 880916 Mgt Meeting in Region II Ofc to Discuss Unit 1 Partial Loss of Level in Refueling Cavity on 880517.Proposed Meeting Agenda & Notification of Meeting Encl
ML18152B209
Person / Time
Site: Surry  Dominion icon.png
Issue date: 09/13/1988
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML18152B210 List:
References
NUDOCS 8809260146
Download: ML18152B209 (4)


Text

SEP 1 3 1SH Virginia Electric and Power Company ATTN:

Mr. W. R. Cartwright, Vice President, Nuclear Operations P. 0. Box 26666 Richmond, VA 23261 Gentlemen:

SUBJECT:

MANAGEMENT MEETING - SURRY DOCKET NOS. 50-280 AND 50-281 This confirms the telephone conversation between G. L. Pannell, of your staff, and F. S. Cantrell, of my staff, on September 7, 1988, concerning a management meeting to be conducted in the Region I I Office on September 16, 1988, at 9:00 a.m.

We requested this meeting to discuss the circumstances related to the partial loss of level in the Unit 1 refueling cavity on May 17, 1988.

Enclosed is a proposed meeting agenda.

Should you have any questions regarding these arrangements, we will be pleased to discuss them.

Enclosure:

Proposed Meeting Agenda cc w/encl:

D. L. Benson, Station Manager N. E. Hardwick, Manager - Nuclear Programs and Licensing Commonwealth of Virginia bee w/encl:

NRC Resident Inspector DRS Technical Assistant Document Control Desk RI!

FCan'/;;, 1 09/; )/88 RI!

~son 09/1,/88 8809260146 880913 PDR ADOCK 05000280 S

PNU Sincerely, J. Nelson Grace Regional Administrator RII (L.*-~St

-88 09//; /88

I.

I I.

I I I.

ENCLOSURE PROPOSED MEETING AGENDA Virginia Electric and Power Company Meeting with NRC September 16, 1988 Opening Remarks Issues of Concern A.

Description of Event Including Design and Installation of Equipment and Operation of Seals B.

Cause of Event C.

Corrective Action Taken D.

Corrective Action Planned Prior to Filling Refueling Cavity for Unit 2 Refueling E.

Reason this Event Was Not Originally Considered Significant and Reportable F.

Longer Range Plans Closing Remarks NRC VEPCO NRC

SEP 1 3 1988 NOTICE OF SIGNIFICANT MEETING Name of Licensee:

Virginia Electric and Power Company Name of Facility: Surry Units 1 and 2 Docket Nos.:

50-280 and 50-281 Date and Time of Meeting:

September 16, 1988, at 9:00 a.m.

Location of Meeting:

Region II Office, Atlanta, Georgia Purpose of Meeting:

To Discuss Circumstance Related to the Partial Loss of Level in the Refueling Cavity on May 17, 1988 NRC Attendees: J. N. Grace, Regional Administrator

.L.A. Reyes, Director, Division of Reactor Projects A. F. Gibson, Director, Division of Reactor Safety B. A. Wilson, Chief, Reactor Projects Branch 2 G. C. Lainas, Assistant Director for Region II Reactors, NRR W. M. Troskoski, Regional Coordinator, EDO H. N. Berkow, Director, Directorate II-2, NRR Licensee Attendees:

W. L. Stewart, Senior Vice President, Power Operations W.R. Cartwright, Vice President, Nuclear Operations G. L. Pannell, Corporate Director of Safety Evaluation and Control D. L. Benson, Plant Manager E. S. Grecheck, Assistant Station Manager G. Bailey, Operations Superintendent Other Licensee Personnel Note:

Attendance by NRC personnel at this NRC/Licensee meeting should be made known by 1:00 p.m., September 15, 1988, via telephone call to F. S. Cantrell at FTS:

242-5534.

Distribution:

(See page 2)

Approved by..,,,....../..,....0...... /-=---~---=_,_--

F. S. Cantrell, Chief Reactor Projects Section 2A

i l Notice of Significant Meeting 2

SEP 1 3 1988 Distribution: J. M. Taylor, DEDRO RII,Z,~

/ '

FCaritrell 09/;}/88 J. H. Sniezek, Deputy Director, ONRR J. Lieberman, Director, Office of Enforcement G. C. Lainas, Assistant Director for Region II Reactors, NRR F. Congel, Director, Division of Radiation Protection and Emergency Preparedness, NRR W. M. Troskoski, Regional Coordinator~ EDD C. P. Patel, Licensing Project Manager, NRR RI I

~son 09/)~88 ROD AGibson 09/

/88 RII MErnst 09/

/88