Text
VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 September 2, 1988 U. S. Nuclear Regulatory Commission Attn:
Document Control Desk Washington, D.C.
20555 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT 1 REACTOR CAVITY SEAL LEAKAGE EVENT JUSTIFICATION FOR CONTINUED OPERATION Serial No.
NO/DAS:vlh Docket No.
License No.88-606 Rl 50-280 DPR-32 On May 17, 1988 during the Unit 1 refueling outage, a leak occurred from the refueling cavity through the refueling cavity floor seal into the incore instrument room.
Attached is our engineering evaluation, Technical Report PE-0005, Rev. 1, which identifies the potential effects of borated water*
flooding of the incore instrument room with regards to present and continued
.safe operation of the plant.
As concluded in this report, flooding of the incore instrument room as a
result of this event has no adverse effect on continued safe operation of the plant.
If you have any additional questions regarding this issue; please do not hesitate to contact us.
W.R. Cartwr ght Vice President - Nuclear cc:
U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, N. W.
Suite 2900 Atlanta, Georgia 30323 Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station Mr. Chandu P. Patel NRC Surry Project Manager Project Directorate II-2 8809140353 880902 PDR ADOCK 05000280 S
PNU Division of Reactor Projects - I/II