Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20209J163 + (22:29:25, 6 December 2024)
- ML20209J162 + (22:29:26, 6 December 2024)
- DCL-85-126, Forwards Public Version of Revised Emergency Response Plan Sops,Including III.10, SOP Dept of General Svcs & III.24, Disaster Preparedness Plan for Peacetime Emergencies. Related Correspondence + (22:29:27, 6 December 2024)
- ML20209J160 + (22:29:27, 6 December 2024)
- ML20209J159 + (22:29:28, 6 December 2024)
- 0CAN079903, Monthly Operating Repts for June 1999 for Ano,Units 1 & 2. with + (22:29:29, 6 December 2024)
- ML20209J156 + (22:29:31, 6 December 2024)
- IR 05000166/1987001 + (22:29:32, 6 December 2024)
- ML20209J154 + (22:29:33, 6 December 2024)
- ML20209J153 + (22:29:33, 6 December 2024)
- ML20209J150 + (22:29:35, 6 December 2024)
- ML20209J152 + (22:29:35, 6 December 2024)
- ML20209J148 + (22:29:37, 6 December 2024)
- ML20209J147 + (22:29:37, 6 December 2024)
- ML20209J146 + (22:29:38, 6 December 2024)
- ML20209J144 + (22:29:39, 6 December 2024)
- ML20209J142 + (22:29:40, 6 December 2024)
- ML20209J143 + (22:29:40, 6 December 2024)
- ML20209J140 + (22:29:41, 6 December 2024)
- ML20209J138 + (22:29:42, 6 December 2024)
- ML20209J137 + (22:29:42, 6 December 2024)
- ML20209J136 + (22:29:43, 6 December 2024)
- ML20209J135 + (22:29:43, 6 December 2024)
- IR 05000483/1986002 + (22:30:08, 6 December 2024)
- TXX-6408, Interim Deficiency Rept CP-85-53 Re Seismic Category II Platforms.Initially Reported on 851220.Engineering,const & Quality Personnel Discussed Corrective Action.Comprehensive Plan Will Be Submitted.Next Rept by 870619 + (22:30:08, 6 December 2024)
- ML20209J128 + (22:30:09, 6 December 2024)
- ML20209J123 + (22:30:10, 6 December 2024)
- ML20209J125 + (22:30:10, 6 December 2024)
- ML20209J122 + (22:30:11, 6 December 2024)
- 05000295/LER-1986-026, :on 860519,during Mod Overview Insp,Raychem Heat Shrink Style Environmentally Qualified Splices Found Incorrectly Installed.Caused by Inadequate Instructions from Mfg.Training Initiated + (22:30:13, 6 December 2024)
- ML20209J118 + (22:30:14, 6 December 2024)
- ML20209J116 + (22:30:16, 6 December 2024)
- ML20209J115 + (22:30:17, 6 December 2024)
- ML20209J113 + (22:30:18, 6 December 2024)
- ML20209J114 + (22:30:18, 6 December 2024)
- PNO-III-86-093, on 860904-06,patient Undergoing Brachytherapy Treatment w/Cs-137 Gynecological Implant Received Therapeutic Radiation Exposure of 8,015 Rads Rather than 6,255 Rads.Caused by Error in Loading Cs-137 Sources + (22:30:19, 6 December 2024)
- ML20209J112 + (22:30:19, 6 December 2024)
- ML20209J109 + (22:30:20, 6 December 2024)
- 3F0986-12, Forwards Monthly Operating Rept for Aug 1986.Corrected Monthly Operating Repts for Sept-Dec 1985 Due to Error in Values Also Encl + (22:30:22, 6 December 2024)
- ML20209J108 + (22:30:22, 6 December 2024)
- ML20209J102 + (22:30:23, 6 December 2024)
- ML20209J104 + (22:30:23, 6 December 2024)
- ML20209J098 + (22:30:25, 6 December 2024)
- ML20209J096 + (22:30:26, 6 December 2024)
- ML20209J097 + (22:30:26, 6 December 2024)
- ML20209J094 + (22:30:27, 6 December 2024)
- ML20209J090 + (22:30:28, 6 December 2024)
- ML20209J087 + (22:30:29, 6 December 2024)
- ML20209J089 + (22:30:29, 6 December 2024)
- 05000237/LER-1986-019-04, :on 860811,while Reactor Operating at 91%,main Turbine Tripped on +55 Inches Reactor Water Level Which Resulted in Full Reactor Scram.Caused by Failure of Feedwater Regulating Valve a to Close + (22:30:31, 6 December 2024)
- ML20209J082 + (22:30:32, 6 December 2024)