Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20210M913 + (07:01:44, 6 December 2024)
- ML20210M915 + (07:01:44, 6 December 2024)
- ML20210M912 + (07:01:45, 6 December 2024)
- ML20210M908 + (07:01:46, 6 December 2024)
- ML20210M907 + (07:01:47, 6 December 2024)
- ML20210M905 + (07:01:47, 6 December 2024)
- IR 05000266/1997012 + (07:01:48, 6 December 2024)
- ML20210M901 + (07:01:49, 6 December 2024)
- PNO-I-97-053, on 970826,special Security Insp Will Be Performed,That Will Examine Security Activities at Vermont Yankee,Pilgrim & Indian Point 3.Team Will Include Security Specialists from Region I & NRR + (07:01:50, 6 December 2024)
- ML20210M891 + (07:01:58, 6 December 2024)
- ML20210M890 + (07:01:59, 6 December 2024)
- ML20210M882 + (07:02:00, 6 December 2024)
- ML20210M884 + (07:02:00, 6 December 2024)
- ML20210M875 + (07:02:04, 6 December 2024)
- IR 05000324/1997010 + (07:02:05, 6 December 2024)
- ML20210M865 + (07:02:06, 6 December 2024)
- LIC-97-0135, Requests That Rj Hubers license,OP-42404,be Conditioned as Corrective Lenses Worn When Performing Licensed Duties, Since Determined by Physician to Have Permanent Physical Condition.Nrc Form-396 Encl.W/O Encl + (07:02:07, 6 December 2024)
- 3F0897-23, Provides Supplemental Info on Three Valves in Crystal River Unit 3 Efs Subject to Pressure Locking as Described in GL 95-07, Pressure Locking & Thermial Binding of SR Power-Operated Gate Valves + (07:02:10, 6 December 2024)
- ML20210M862 + (07:02:10, 6 December 2024)
- ML20210M858 + (07:02:11, 6 December 2024)
- ML20210M854 + (07:02:12, 6 December 2024)
- ML20210M853 + (07:02:13, 6 December 2024)
- BSEP-99-0110, Forwards Rev 0 to ESR 99-00279, B214R1 RPV Hydrotest Bolted Connection Corrective Action Evaluation, IAW Subparagraph IWB-3144(b) of 1989 Edition of ASME B&PV Code, Section XI + (07:02:20, 6 December 2024)
- ML20210M846 + (07:02:21, 6 December 2024)
- ML20210M843 + (07:02:22, 6 December 2024)
- ML20210M838 + (07:02:23, 6 December 2024)
- ML20210M825 + (07:02:36, 6 December 2024)
- ML20210M823 + (07:02:36, 6 December 2024)
- ML20210M817 + (07:02:43, 6 December 2024)
- IR 05000116/1997201 + (07:02:45, 6 December 2024)
- TAC:54732 + (07:02:46, 6 December 2024)
- B17845, Forwards Revised Commitment for Surveillance Scheduling & Tracking.Options for Surveillance Scheduling & Tracking Methodologies to Be Incorporated in Standardized Station Surveillance Program Are Currently Being Reconsidered + (07:02:55, 6 December 2024)
- JPN-99-025, Forwards Relief Request 17 Re Proposed Alternatives IAW 10CFR50.55a(a)(3)(i) for Reactor Pressure Vessel Circumferential Shell Weld Exams + (07:02:56, 6 December 2024)
- ML20210M808 + (07:02:56, 6 December 2024)
- TAC:59881 + (07:03:04, 6 December 2024)
- JPN-99-026, Forwards Relief Requests 18 & 19 to Jaf ISI Program Re Proposed Alternatives IAW 10CFR50.55a(a)(3)(i) & Relief from ASME Section XI Code Re Insp of RPV Vertical Shell & Shell to Flange Welds + (07:03:11, 6 December 2024)
- ML20210M801 + (07:03:12, 6 December 2024)
- ML20210M796 + (07:03:12, 6 December 2024)
- ML20210M795 + (07:03:13, 6 December 2024)
- ML20210M789 + (07:03:14, 6 December 2024)
- ML20210M793 + (07:03:14, 6 December 2024)
- ML20210M786 + (07:03:15, 6 December 2024)
- ML20210M785 + (07:03:16, 6 December 2024)
- ML20210M782 + (07:03:17, 6 December 2024)
- PY-CEI-NRR-2418, Application for Amend to License NPF-58,incorporating Addl Option Into TS 3.9.1 Required Actions When Refueling Interlocks Are Inoperable + (07:03:17, 6 December 2024)
- ML20210M770 + (07:03:30, 6 December 2024)
- RBG-45087, Special Rept:On 990510,LPCI a & LPCS Injected Into Rv for Less than Two Minutes.Caused by Electrical Transient in One of ECCS Power Supplies.Operators Verified Reactor Cavity Level & Closed Injection Valves to Stop Injection + (07:03:31, 6 December 2024)
- ML20210M763 + (07:03:38, 6 December 2024)
- ML20210M757 + (07:03:39, 6 December 2024)
- NSD-NRC-97-5275, Forwards Responses to Requests for Addl Info on Chapter 15.6.5 of AP600 Ssar.Nrc Should Inform Westinghouse of Status to Be Designated in NRC Status Column of Oits + (07:03:39, 6 December 2024)
- ML20210M755 + (07:03:40, 6 December 2024)
- ML20210M751 + (07:03:41, 6 December 2024)