Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20210U484 + (05:55:26, 6 December 2024)
- ML20210U480 + (05:55:27, 6 December 2024)
- ML20210U483 + (05:55:27, 6 December 2024)
- ML20210U478 + (05:55:28, 6 December 2024)
- ML20210U479 + (05:55:28, 6 December 2024)
- ML20210U477 + (05:55:29, 6 December 2024)
- U-600824, Amended Final Deficiency Rept 55-86-09 Re Broken Tack Welds Between Valve Disc & Disc Nut.Initially Reported on 860828. Caused by Vibration Created by Extreme Throttling.Valves Will Be Replaced W/Valves Designed for Extreme Throttling + (05:55:29, 6 December 2024)
- ML20210U474 + (05:55:31, 6 December 2024)
- ML20210U473 + (05:55:31, 6 December 2024)
- ML20210U472 + (05:55:32, 6 December 2024)
- ML20210U471 + (05:55:33, 6 December 2024)
- 05000322/LER-1987-001, :on 870113,reactor Bldg Standby Ventilation Sys a Side Initiation Occurred During Health Physics Surveillance Test.Caused by Personnel Error.Technician Reprimanded & Instructed on Procedures + (05:55:34, 6 December 2024)
- ML20210U467 + (05:55:36, 6 December 2024)
- ML20210U465 + (05:55:37, 6 December 2024)
- ML20210U466 + (05:55:37, 6 December 2024)
- ML20210U462 + (05:55:38, 6 December 2024)
- ML20210U460 + (05:55:39, 6 December 2024)
- ML20210U459 + (05:55:39, 6 December 2024)
- ML20210U457 + (05:55:40, 6 December 2024)
- RBG-45091, Monthly Operating Rept for July 1999 for River Bend Station, Unit 1.With + (05:55:40, 6 December 2024)
- ML20210U455 + (05:55:41, 6 December 2024)
- IR 05000327/1986021 + (05:55:42, 6 December 2024)
- ML20210U453 + (05:55:42, 6 December 2024)
- ML20210U452 + (05:55:43, 6 December 2024)
- ML20210U449 + (05:55:44, 6 December 2024)
- ML20210U450 + (05:55:44, 6 December 2024)
- ML20210U448 + (05:55:45, 6 December 2024)
- ML20210U447 + (05:55:45, 6 December 2024)
- ML20210U446 + (05:55:46, 6 December 2024)
- 1CAN098615, Remits Fee for Review of 860910 Proposed Tech Spec Changes Associated W/Cycle 8 Reload Rept + (05:55:50, 6 December 2024)
- ML20210U443 + (05:55:51, 6 December 2024)
- ML20210U442 + (05:55:51, 6 December 2024)
- ML20210U441 + (05:55:52, 6 December 2024)
- ML20210U440 + (05:55:52, 6 December 2024)
- IR 05000324/1986013 + (05:55:54, 6 December 2024)
- ML20210U436 + (05:55:55, 6 December 2024)
- ML20210U435 + (05:55:56, 6 December 2024)
- ML20210U434 + (05:55:57, 6 December 2024)
- ML20210U433 + (05:55:57, 6 December 2024)
- ML20210U430 + (05:55:59, 6 December 2024)
- ML20210U429 + (05:56:00, 6 December 2024)
- ML20210U428 + (05:56:04, 6 December 2024)
- PNO-I-87-009, on 870211,both Doors of Equipment Hatch Air Lock Declared Inoperable.Caused by Failed Linkage on Mechanical Interlock for pressure-equalizing Ball Valves. Valves Closed Manually & Cooldown Per Tech Specs Terminated + (05:56:07, 6 December 2024)
- ML20210U423 + (05:56:08, 6 December 2024)
- ML20210U422 + (05:56:09, 6 December 2024)
- ML20210U421 + (05:56:09, 6 December 2024)
- 05000482/LER-1987-002, :on 870108,low Steamline Pressure Signal Occurred During Calibr Testing & ESF Actuation Initiated. Caused by Personnel Error.Improved Instrument Identification Tags & Procedural Enhancements Made + (05:56:11, 6 December 2024)
- ML20210U417 + (05:56:12, 6 December 2024)
- ML20210U415 + (05:56:15, 6 December 2024)
- ML20210U414 + (05:56:16, 6 December 2024)
- IR 05000338/1986011 + (05:56:18, 6 December 2024)
- ML20210U408 + (05:56:19, 6 December 2024)