ML20210U440
| ML20210U440 | |
| Person / Time | |
|---|---|
| Site: | Maine Yankee |
| Issue date: | 10/02/1986 |
| From: | Whittier G Maine Yankee |
| To: | Thadani A Office of Nuclear Reactor Regulation |
| References | |
| 8074L-SDE, GDW-86-224, MN-86-122, NUDOCS 8610090518 | |
| Download: ML20210U440 (1) | |
Text
Ei N RIVE RIAIRE HARHEE MOMIOPOWERColilPARHe AUGUSTA, MAINE o4336 (207) 623-3521 9
October 2, 1986 MN-86-122 GDH-86-224 Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington, D. C.
20555 Attention:
Mr. Ashok C. Thadani, Director PHR Project Directorate #8 Division of Licensing
References:
(a)
License No. DPR-36 (Docket No. 50-309)
(b) USNRC Letter to MYAPCo dated June 24, 1986 (c) MYAPCo Letter to USNRC dated September 4, 1986 (MN-86-115)
- Response to Request for Information Concerning Spent Fuel Pool Masonry Hall
Subject:
Spent Fuel Pool Masonry Hall Gentlemen:
In Reference (c), we responded to your request for additional information contained in Reference (b). One part of our response requires clarification and amplification.
In response to your request on the results of the analysis of the acceptability of offsite dose releases in the event of boiling of the water in the spent fuel pool (SFP), we failed to indicate that the analysis also considered an unfiltered release, which is the applicable case assuming the collapse of SFP masonry wall.
The results of the analysis showed that an unfiltered release of radioactivity due to boiling of the SFP water would not exceed the technical specification release rate limits.
Please contact us if you have any questions.
Very truly yours, HAINE YANKEE ATOMIC POWER COMPANY W
/
[ G. D. Whittier, Manager Nuclear Engineering and Licensing GDH/bjp cc: Dr. Thomas E. Murley
$R10090518 e61002
()o$
ADOCK 0500 9
Mr. Pat Sears P
Mr. Cornelius F. Holden 8074L-SDE