A il Northeast Utilities Millstone - Unit 3
, Independent Corrective Action Verification Program (ICAVP)
System Review Checklist l CK-MP3 5.1, Rev.1 l i
i Mechanical Comoonent Review Checklist 1
. 9
)
Prepared by: M. D. Stout f/ (ON FILE)
Of/10,97
'C Name Signatur Date
- Approved by
- A. A. Neri (O I F) Of/11/97 Name .
- S;gfdture 6 ate 1
1 1
IMPLEMENTATION System Verified By:
Concurrence By:
O 9709190157 970917 PDR ADOCK 05000423 p PDR
Northeast Utilities CK-MP3-02-5,1
,; Millstone Unit 3 System Sheet of O
V Mechanical Component Review Checklist Instmettons This checklist supplements PI MP3-02 and shall be ased for the Mechanical Component Review process described in the PI. The application and use of this checklist shall be as follows:
- 1. The Lead Vcrifier shall identify all mechanical components included in the scope of the review and shall list the component ID and description on the form included as page 3 of this checklist. The Lead Verifier shall sign and date the form when this step is completed.
- 2. The Lead Verifier and/or Verifiers shall then complete an individual component checklist for each system component using the applicable component speci6c checklists included here in. The Lead Verifier and/or Verifiers shall sign and date the individual checklists when completed. For each component specific checklists, the Lead Verifier and/or Verifier shall:
a) Enter the component ID O
V b) Enter, for each attribute on the checklist, the requirnnent or data listed in the licensing documents, specifications, calculation, vendor or design drawings and lists or database. Enter NA ifnot applicable.
c) Enter Yes/No/NA as applicable in the " Acceptable" column.
d) For each "No" response, assign a comment number and use the form on page 4 to explain the No response. Discrepancies shall then be processed for PI-MP3-11.
- 3. Once the review has been completed, the Lead Verifier shall compile the indisidual component checklists, enter the system name on each sheet, number the sheets sequentially and sign the cover sheet. Only applicable component specific checklists shall be included in the final packages. Checklists for component types not applicable to the system being reviewed shall be omitted.
- 4. The SRG Lead shallindicate his concurrence that the mechanical component review process has been completed by signing the cover sheet.
- 5. If needed due to subsequent revisions, insert pages can be as l A,1B, 2A, 2B, etc.
Note: The attached checklist pages are sample forms. Electronically generated forms which contain the same technical requirements may be substituted.
V (CK-MP3 02-5.1, Rev.1. Page 2) l CACK02-51. DOC
o Nrrtheast Utilities CK-MP342-5.1 )
,; Millstone Unit 3 Systen Sheet of G
b Mechanical Component Review Checklist Mechanical Eauloment List Equipment ID Description O
Prepared by: /
Name Date O
(CK MP3-02-5.1, Rev.1, Page 3) l CACK02-51. DOC
a N:rtheast Utilities CK-MP3-02-5.1
,; Millstone Unit 3 System ;
Sheet of l A l M Mechanical Component Review Checklist Mechanical Component Review Comment Form Comment No. Comment i
4 O
1 i
I Prepared by Signature Date (CK MP3-02-5.1, Rev.1, Page 4) l C:\CK02-51. DOC
ilities CK-MP3-82-5.1 MiEstone Unit 3 Syssene a Sheet of Mechanical Cosoponent Redew ChecidiW PUMPS Consponent ID.
Licensing 4 Z ^E Csicaleties Vad/Desige List! Acceptable Attributes Reemiremment Respiremmen* Reesiremment Drawier Database V/N/NA Comument I. Tag Nolldentifratum
- 2. Type / Stages
- 3. Material
- 4. Pressure Rating
- 5. Ddver Charactenstics
- 6. Connection - Size
- 7. Connechon-Weld / Flange End
- 8. Seal r3pe
- 9. Lubrication System
- 10. BeanngType i 1. Manufacturer /Model
- 12. Service / Fluid
- 13. Operatmg Modes
- 14. Controisanterlocks/ Trips
- 15. Seisme Classification
- 16. ASME Code Class
- 17. Design Pressure
- 18. DesignTemgrrature
- 19. Design Flow
- 20. Minimum (Recirc.) Flow (CK-MP3-02-5.1 Rev. I, Page 5)
C3CK02-51. DOC l
N tilities CK-MP3-02-5.1 MiEstone Unit 3 Systein Sheet of Mechanical Cosmponent Review Checklist PUMPS Compement ID.
Licensing 4% ""_ _ Calcaistion Ved/ Design List / Acceptable Attributes Reemircuneet Reesiremment Reesir==t Drawima Database Y/N/NA Commment
- 21. Mammum (Runout) Flow
- 22. Desip Discharge Head
- 23. Desip Sucta Head 24 Desip Total Developed Head
- 25. Maximum ShutoffHead
- 26. NPSH Available
- 27. NPSH Rcquir-d
- 28. Electncal Class -
- 29. EQ Requirement
- 30. SQ Requirement Prepared by Date (CK-MP3-02-5.I. Rev. I, Page 6)
CSCK02-51. DOC l
Nort tilities CK-MP3-02-5.1 Millstone Unit 3 Systems Sheet et Mechsmical Comeponent Review Checidist TANKS & VESSELS Comeponent ID.
Licensing Specification Calcuistion Ved/ Design List / Awepft Attributes Requiremment Reemirveneet Reemir - e=t Drawier Database Y/N/NA Comument
- 1. Tag Nolldentificaten
- 2. Type-Vertical /Honzmtal
- 3. Pressure Ratmg
- 4. Materials
- 5. Connections -
Number / Size /Onentation
- 6. Connections-Weld / Flange Ends
- 7. Insulation
- 8. Mounting Details
- 9. Overall Dunensions
- 10. Heaters / Heat Tracing i 1. DQ,144ns
- 12. Coatings /Lmers
- 13. Service / Fluid
- 14. Operating Modes
- 15. Seismic Classification
- 16. Controls / Interlocks / Trips
- 17. Radiation Monitoring
- 18. Temperature Contml
- 19. ASME Code Class
- 20. Capacity (CK-MP3-02-5.1. Rev.1. Page 7) l C:\CK02-51. DOC
Northenqs tilities O' CK-MP3-42-$.1 O' =
MiNstone Unit 3 Syssen Sheet of Mechanical Cossponent Redew Checidist
~
TANKS & VESSELS Cesaponent ID.
Licensing SpeciScaties Calculatica Vad/ Design List / Acceptable Attributes Reemirement Reemirennent Reemirament Drrwise Database YIN /NA Comument
- 21. Design Pressure
- 22. Design Le,4ure
- 23. Normal Flows
- 24. Surge Fimvs
- 25. Overpressure Protection
- 26. Vacuum
- 27. Fluid Properties
- 28. Venting / Overflow
- 29. Emironmental Qualificatum .
- 30. Scismic Qualification Prepared by Date (CK-MP342-5.1, Rev. I, Page 3) l CSCK02-51. DOC
Northeast 9tilsties CK-MP3-02-5.1 Millstone Unit 3 Syseese Sheet of Mechanical Conoponent Review Checklist CONTAINMENTISOLATION VALVES Component ID.
Licensing -Wation Calcuistion Vnd/Desige List / A n d i'_
Attributes Requirtsment Reepirtsment Reemircuent Orswier Datsbese YIN /NA Commsent
- 1. Tag No11dentificaten
- 2. BodyType
- 3. Material
- 4. Pressure Ratmg
- 5. Connection - Size
- 6. Connection -Weki/ Flange Ends
- 7. Normal Position
- 8. Type of Operator
- 9. Iass ofAir/Elec.-Failed Position
- 10. Scistnic Classification
~
- 11. Required MotorTorque
- 12. Stroking Tunc
. 13. ASME Code Class 14 Design Pressure
- 15. Design Lp.4use
- 16. Fluid Design Flow
- 17. Differential Pressure
- 18. S bnic Qualification Required
- 19. Enynu...~.2 Qualification Required Prepared by Date (CK-MP3-02-5.1. Rev.1. Page 9) l CSCK02-51. DOC
tilities CK-MP3 42-5.1 MiEssene Unit 3 Systems Sheet of Mech =ir=I Consposest Iteview ChecMist GENERAL APPLICATION VALTT.S Consposest ID.
f_A -- ~; Speciiicatism Cakulmeien Ve& Design Lisef A mf2 Attributes Reesirament Reemirament Reemirament Drawing Database YIN /NA Coasaseet I. Tag No11denuficatxm
- 2. BodyType
- 3. Matenal 4 Pressure Rahng
- 5. Connechon -Size
- 6. Car-reian -Weld / Flange Ends
- 7. Modulaung or On-Off
- 8. Nonnal Posmon
- 9. Type of Operator
- 10. Ioss ofAir/Elec. - Failed iI. Sessnne Classificabon
- 12. Normal Posdion
- 13. Type of Operator
- 14. Ioss of Air /Elec. - Failed
- 15. Seisnne Classificabon
- 16. Required MotorTorque
- 17. StrokingTune
- 18. Limit Switches
- 19. Solenoid Valves
- 20. ASME Code Class (CK-MP3-02-5.1, Rev.1. Page 10) l CXK02-51. DOC
Nort ilities CK-MP3-02-5.1 Millstone Unit 3 Systems SIwet of Mechanical Consponent Review Checklist GENERAL APPLICATION VALVES Cesapement ID.
Licenskig -Wation Calculation Vad/ Design List / Acceptable Attributes Requiressent Ree h Reesirament Drawine Database Y/NINA Commuseet
- 21. Design Pressure
- 22. Design Temperature
- 23. Fluid Design Flow
- 24. Differential Pressure F,cd by Date (CK-MP34)2-5.1, Rev.1. Page 11) l C:E02-51. DOC
Northem ilities CK-MP3-82-5.1 Millstone Unit 3 Systesa Sheet of Mechanical Cesapenent Review Checklist CHECK VALVES Cesoponent ID.
Licensing SJC'c Calculation VadTDesign List / Acceptable Attributes Reemiremient Reemireement Requiremment Drawing Database YIN /NA C======t
- 1. Tag No1 Identification
- 2. Body Type
- 3. Material
- 4. Pressure Rating
- 5. Connection - Size
- 6. Connection -Weld / Flange Ends
- 7. Scismic Classification
- 8. Ixakage rating
- 9. Type
- 10. Water hammer considerations II. ASME Code Class
- 12. Design Pressure
- 13. Design Tuuyu4ture
- 14. Fluid Design Flow
- 15. Differential Pressure
- 16. Scismic Qualification Required
- 17. Equipment Qualificatet Required Pweered by Date (CK41P3-02-5.1, Rev.1, Page 12) l C:\CK02-51. DOC
Northeast iNties CK-MP3-02-5.1 Millstone Unit 3 Sysican Sheet of Mechanical Consponent Review Checklist HEAT EXCHANGE EOUIPMENT Comeponent ID.
Licensing SpeciEcation Calculation Vad/ Design List / Acceptable Attributes Reemirement Reemirennent Requirement Drawist Database YININA Csamment
- 1. Tag Nolldentification
- 2. Type
- 3. Materials /Ihickness
- Tube
- Shell
- 4. Outside Diameter
- Tube
- Shell
- 5. Number of Passes
- Tube Side
- ShcIl Side
- 6. Main Nozzle Sizes
- Tube Inlet
- Tube Outlet
- ShellInlet
- SheII Outlet
- 7. Weight
- Q.
- Full
- 8. Control /Interlocksfrrips (CK-MP3-02-5.I. Rev. I, Page 13) l C3CK02-51. DOC
s - -
Nort tilities V CK-MP3-02-5.1 Millstone Unit 3 Systeem Sheet er Mechanical Component Review Checklist HEAT EXCHANGE EOUIPMENT Cosapement ID.
Licensing SpeciEcstien Calculation Vnd/ Design Lis 1 Aug-Lit Attributes Reasirennent Reemire--t Requiressent Drawier Database YININA CW
- 9. Fluid Description
- Tube Side
- Shell Side
- 10. Operating Modes
- 11. Service Requirements -
- 12. Tubc/ShellIzakage Requirements
- 13. ASME Code Class
- 14. Sizing Codes and Standards
- 15. Heat Transfer Area
- 16. Heat TransferImd
- 17. Design Operatmg Pressures
- Tube Inlet
- Tub'eOutlet
- ShellInlet
- Shell Outlet
- 18. Design Op iusTemperatures
- Tube hdet
- Tube Oatlet
- Shell hl:t
- Shell Oatlet (CK-MP3-02-5.1, Rev. I, hge 14) l C:KX02-51. DOC
Northeast ilities CK-MP3-02-5.1 Millstone Unit 3 Systene Sheet of Mechanical Conoponent Review Checklist HEAT EXCILANGE EOUIPMENT Conoponent ID.
Licensing Spxification Calculation Vnd/ Design List / Acceptable Attributes Reemiremment Reemiressent Reemiressent Drawier Database YININA Cm
- 19. Design Or,. 4-3 Flow
- Tube Side
- Max. AP
- ShcIl Side
- Max. AP
- 20. Number / Size ofVents
- Tube Side
- Shell Side
- 21. Number / Size of Drains
- Tube Side
- ShcIl Side
- 22. Overpressure Protection
- 23. Equipment Qualifwation Required
- 24. Seismb Qualifx:ation Required i
E e (CK-MP3-02-5.1, Rev.1 Page 15) l C \CK02-51. DOC
Nort tilities CK-MP3-82-5.1 Millstone Unit 3 Systems Sheet of Mechanical C:_ ,::: ; Review Checidist PIPING INLINE COMPONENTS Comeponent ID.
Licensing SpeciEcsties Calculat.es Vnd/ Design List / Acceptable Attributes Requirennent Reemirennent Requiremment Drawier Database YININA Ceauneet
- 1. Tag Nolldentifx:ation
- 2. . Material
- 3. Pressure Rating
- 4. Ovupiessure Protection
- 5. Size
- 6. Weld / Flange Ends
- 7. Attachments /Accessones
- 8. Gasuing/ Seals
- 9. Weight
- 10. Service / Fluid I 1. Operating Modes
- 12. Seistric Classification
- 13. Codes and Standards
- 14. Design Flow
- 15. Design Pressure
- 16. Design Temperature
- 17. Size
- 18. Pressure Drop
- 19. Equipment Qualification Required
- 20. Seismic Qualification Required F,ed by Date (CK4fP -5.1. Rev.1. Page I6) l CSCKO. DOC i _ _ _ - _ - _ - - _ - _ _ _ _ _ _ _ _ __.
m ~. .
s Northeast tilities CK-MP3-42-5.1 :
Minstone Unit 3 Systemi l Sheet of i Mechanical Cosoponent Review Checidist PRESSURE RELIEF DEVICES Cosoponent ID.
Licensing Specification Calcuistion Ved/I)esign List / Acceptable Attributes Requistament Reemirennent Reemiresnest _Dr s Databpse Y/NINA Cow
- 1. Tag Nolidentifx:atxm
- 2. Type
- 3. Manufacturer /Model
- 4. Pressure Ratmg
- 5. Material
- 6. Exhaust Path
- 7. Accessories
- 1. Backpressure Bellows '
- 2. Pilot ReliefVahr ,
- 3. LiftingImer i 4. Silencer
- 8. Connection-Size
- 9. Connecton-Weld / Flange End !
- 10. Limit Switches
- 11. Operator
- 12. Solenoid Vahes
- 13. Service / Fluid
- 14. Operating Made
- 15. Seismic Classifx:ation i 16. Controls / Interlocks /Setpoint :
- 17. ASME Code Class (CK-MP3-02-5.1, Rev.1, Page 17) l l C:\CK02-51. DOC l t
}
Neet tiirties CK-MP3-42-5.1 Millstone Unit 3 System Sheet of Mechanical Compement Review Checklist PRESSURE RELIEF DEVKIS Compement ID.
Licessing SpeciGcation Calculation Vnd/ Design List / Acceptable Attributes Requirement Reemiressent Reemiremment Drawier Database Y/N/NA CW I 8. Design Flow
- 19. 'Jesign Pressure
- 20. Design Temperature
- 21. Max. Differental Pressure
- 22. Fluid Properties
- 23. Accumulation /Bkmtkmn
- 24. Back Pressure
- 25. Setpo:nt/ReliefPressure
- 26. Ewiyoca Qualification Required
- 27. Seismic Qualificabon Requiral Piq=rsi by Date (CK-MP3-02-5.1, Rev.1. Page 18) l CACK02-51. DOC
Northens ilities CK-MP3-02-5.1 MiNssene Unit 3 Systems Sheet of Mechanical Cosoponent Review Checklist CONTROL VALVES Cosoponent ID.
Licensing Speciliution Calcuistion Ved/ Design List / Acceptable Attributes Reesiressent Reemirennent Reemirennent Drawier Database Y/NINA Cemament
- 1. Tag No1 Identification
- 2. BodyTyp
- 3. Material
- 4. Pressure Rating
- 5. Vahr/ Operator Manufacturer
- 6. Connection - Size
- 7. Connection -Weld / Flange Ends
- 8. Steam Leak Off Requirements
- 9. Flow Dinction Thru Valve
- 10. Modulating or On-Off i1. Normal Position
- 12. Type of Operator
- 13. Loss of Air /Elec. - Failed Position
- 14. Scismic Classification
- 15. Requircd Motor Torque
- 16. Strokmg Time
- 17. Limit Switches
- 18. Trim Design
- 19. Performance Characteristics -
(Lmear, Fast-opening, etc.)
- 20. ASME Code Class (CK-MP3-02-5.I. Rev. I, Page 19) -l C$CK02-51. DOC
m ~
Northeast tilities CK-MP3-02-5.1 Millstone Unit 3 Systems ,
Sheet er 1 Mechanical Component Review Checklist CONTROL VALVT,5 Component ID.
Licensing Specificaties Cakaistion Vad/ Design List / A. - e,
- _ii Attributes Reemirennent Reemiremment Reemirrement Drawier D=e=have YIN /NA C-w
- 21. Design Pressure
- 22. Design L.r..ture
- 23. Fluid Design Flow
- 24. Differential Pressure
- 25. CV
- 26. ' qcipment Qualification Rovired
- 27. C.ssmic Qualification Required
- 28. Design / Flow Range
- 29. 1. Min. Flow
- 30. 2. Normal Flow
- 31. 3. Max. Flow
- 32. Izakage Ratingfright Shutoff R g unis..c. 3
- 33. Maximum P Valm must open or close against Facyi-cd by Date (CK-MP3-02-5.1 Rev.1 Page 20) l C:\CK02-51. DOC
s ., ,
Northeast9tinties CK-MP3-42-5.1 Minstone Unit 3 Syseese Sheet of Mechanical Cosmponent Review Checidist HVAC DUCT ACCESSORIES l Compement ID. '
Licensing W Calculation VadfDesige List / Aic ^ l '_
Attributes Reemircuneet Reemirennent Reesirement Drawier Database V/N/NA CW i 1. Tag No/ Identification l l 2. Type l 3. Procurement Spec.
- 4. Mfg.
- 5. Model No.
- 6. Size i
. 7. Airflow
! 8. Pressure drop
- 9. Pressure ratmg
- 10. Le7~te rating
- 11. Co: ; and standards 12 Weight ~
- 13. Safety classification
- 14. Seismic classificaten .
- 15. EQ requirement Ny. red by Date (CK-MP3-02-5.1, Rev.1. Page 2 I) l C:iCK02-51. DOC i
)
Nort iIities \^
CK-MP3-02-5.1 Millstone Unit 3 Systeem Shett of Mechanical Cosmpement Review Checidist HVAC DAMPERS Coeupement ID.
Licensing -Waties Calculation Vad/ Design List / Aiiq42'_ l Attributes Reemircuneet Reamiremment Requiremment Drawier Databape YININA Cm
- 1. Tag Nolldentifmation ,
- 2. Type (control, isolation, fire, l smoke, balancmg) l
- 3. Procurement spec
- 4. Mfg.
1
- 5. Model No.
- 6. Size !
'7. Airflow !
i
- 8. Pressure drop
- 9. Pressure rating l
- 10. Ixakage ratmg i
- 11. Safety classifmation ;
- 12. Seismic classifmation i
- 13. Actuator type !
- 14. Closing time f
- 15. Maximum air vc!ooty -
- 16. EQ requirement :
i Prepared by Date i
(CK-MP342-5.1, Rev.1, Page 22) l CACK02-51. DOC
--a n __- - - _
Nortleenst ilities CK-MP3-42-5.1
. Millstone Unit 3 Systems Sheet of Mechanical Comeponent Review Checidist HVAC FANS Cassponent ID.
Licensing SpeciEcstion Calcuistion V ad m esign List / Acceptable Attributes Reesistement Reesiresment Reemremment Drawing Database Y/N/NA Comument
- 1. Tag No./Identifx:ation
- 2. Type
- 3. Procurement Spec
- 4. Mfg.
- 5. Model No.
- 6. Airflow
- 7. Fan total pressure
- 8. Fan speed
- 9. Fan bhp required
- 10. Motor hp I 1. Motor speed
- 12. Motor volt.5dy!s' frequency
- 13. Codes and standards
- 14. Safety classification
- 15. Seismic classification
- 16. EQ requirement
' Pwy.rui by Date o
(CK-MP342-5. I, Rev.1. Page 23) l C$CK02-51. DOC
Northens tilities CK-MP3-02-5.1 Millstone Unit 3 System Sheet of Mechanical Component Review Checklist HVAC FILTERS Component ID.
Licensing Specification Calculation Vnd/ Design List / Acceptable Attributes Reavirement Reovirement Reavirement Drawine Database Y/NINA Connnent
- 1. Tag No1 Identification
- 2. Type
- 3. Procurement Spec
- 4. Mfg.
- 5. Model No.
- 6. Efficiency
- 7. Airflow
- 8. Pressure drop
- 9. Size
- 10. Codes and standards
- 11. Bypass leakage
- 12. Housing 1cakage
- 13. Housing pressure rating
- 14. Drains
- 15. Fire Protection
- 16. Safety classification
- 17. Seismic classification Prepared by Date (CK-MP3-02-5.1, Rev. I, Page 24) l
' CSCK02-51. DOC
)
"~\ ,
Northens ilities d CK-MP3-02-5.1 s-Millstone Unit 3 System Sheet of Mechanical Component Review Checklist IIVAC- LOUVERS Component ID.
Licensing mWration Calculation Vnd/ Design List / Acceptable Attributes Reavirement Reavirement Reavirem_en1 Drawine Database Y/NINA Conwnent 1
- 1. Tag No11dentificatian
- 2. Type
- 3. Procurement spec
- 4. M fg.
- 5. Model No.
- 6. Size
- 7. Airflow
- 8. Pressure drop
- 9. Pressure rating
- 10. I aboe rating
- 11. Safety classirmation
- 12. Scismic classification
- 13. Actuator type 14 Closing time
- 15. Maximum air velocity Prepared by Date (CK41P3-02-5.1, Rev. I, Page 25) l C:\CK02-51 DOC
( ) !,l ! >
%. / w,' O Northeast Utilities CK-MP3-02-5.1 Millstone Unit 3 System Sheet of Mechanical Component Review Checklist REFRIGERATION UNITS Component ID.
Licensing Specification Calculation Vnd/ Design List / Acceptable Attributes Recuirement Recuirement Reovirement Drawing Database YIN /NA Comment
- 1. Tag Nolldentification
- 2. Type
- 3. Procurement Spec
- 4. M fg.
- 5. Model No.
- 6. Capacity at rating conditions
- 7. Design load on unit
- 8. Minimum Icad on unit
- 9. Re igerant number
- 10. Rei..gerant suction tuum.dmdpressure i 1. Refrigerant condensing temperature / pressure
- 12. Condenser Type (air / water cooled)
Tube material / configuration Fin material / configuration Number ofpasses/ circuits Air / water flow (max / min)
Air / water entering temperature (max / min)
Air / water leaving temperature Pressure rating Tempetaure rating (CK-MP3-02-5.1. Rev.1 Page 26) l C:\CKo2-51. DOC Y . - _ _ _ _ _ _ _ _ _ _ .
rm -
Northem tilities CK-MP3-02-5.1 I
Millstone Unit 3 System Sheet of
- Mechanical Consponent Review Checklist i
REFRIGERATION UNITS Component ID.
Licensing Speci6 cation Calculation Vad/ Design List / Acceptable Attributes Reamirennent Reemirennent Reemiresnest Drawing Databag YIN /NA Comument j I. Tag No/ Identification
- 2. Type
- 3. Procurement Spec
- 4. Mfg.
, 5. Model No. ,
- 6. Capacity at rating conditions
- 7. De;ign load on unit
- 8. Minimum load on unit
- 9. Refrigerant number
- 10. Refrigerant suction tm..yu.ture/ pressure I 1. Refrigerant condensing temperature / pressure
- 12. Chw Type (air /watercooled) l Tube matenal/ configuration 4
Fin matenal/ configuration Number ofpasses/ circuits Air / water flow (max / min)
Air / water entering !
temperature (max / min) j Air /waterleaving temperature Pressure ratmg Tempetaure rating .
(CK-MP3-02-5.1, Rev.1. Page 26) g CSCK02-51. DOC I
Nort tilities CK-MP3-02-5.1 Millstone Unit 3 System Sheet of Mechanical Component Review Checklist Design fouling factor Pressure drop
- 13. Evaporator Type (direct uwis.cn/ chilled water)
Tube matenal/ configuration Fin material / configuration Number ofpasses/ circuits Air / water flow (maximin)
Air / water entermg temperature (max / min)
Air /waterleaving temperature Pressure rating Temperature rating Design fouling factor Pressure drop
- 14. Capacity control
- 15. Interlocks and internal safetics
- 16. Pressure reliefdevices
- 17. Compressor type
- 18. Compressor motor kW
- 19. Compressor motor voltage /phasc/fraluency
- 20. Codes and standards
- 21. Safety classifx:aton
- 22. Seismic classification
- Prepared by Date 1
i (CK-MP3-02-5.1, Rev. I, Page 27) l
, C:\CK02-51. DOC
~ . - - - . - - - .
1 s - ., ,
N ies CK-MP3-82-5.1 Minstone Unit 3 Systein Sheet of Mechanical Consponent Review Checidist 1
l ELECTRIC HEATING COILS Cossponent ID. i Licensing Specification Calculation Vad/ Design Listl Acceptable j Attributes Reemiressent Reemircement Requiremment Drawine Depdpase Y/N/NA CW I. Tag Nolldentification
- 2. T 3pe
- 3. Procurement spec.
- 4. Mfg. l
- 5. Model No.
- 6. Capacity, kW
- 7. No. 9fstages
- 8. Airflow
- 9. Pressure drop
- 10. Size I 1. Minimum velocity l 12. Capacity control and safeties
- 13. Voltage /phasc/fiwcy
- 14. Inlet configuration j 15. Safety classification 1
- 16. Setsmic classification i
i Prepared by Date (CK-MP34)2-5.1, Rev.1. Page 28) l CSCK02-51. DOC
Nort tilities . CK-MP3-02-5.1 Millstone Unit 3 Systems Sheet et Mechanical Coasponent Review Checidist COOLING COILS Consponent ID.
Licensing SpeciEcation Cal % Ved/ Design List / A(i d i'_
Attributes Reemirennent Reemiremment Reemiresnest Drawing Database Y/N/NA Commuseet
- 1. Tag Nolldentification
- 2. Type
- 3. Procurement spec.
- 4. M fg.
- 5. Model
- 6. Fluid
- 7. Tube material
- 8. Tube E=r.- ; ,
- 9. Tube wall tisci.s
- 10. Fin material
- 11. Fin pitch
- 12. Fin tinckness
- 13. Number of tube rows
- 14. Number of tubes per row 1F Coil serpu.Ge(passes / row)
- 16. Air flow
- 17. Face area
- 18. Air velocity
- 19. Entering air tu..pudure
- 20. Ixaving air tu..rido.ie
- 21. Entering water tuopudure
- 22. Izaving water k...r..iure (CK-MP342-5.1, Rev.1, Page 29) l CACK02-51. DOC
=
[
t e
a D
_ 1 f 5- o _
2 0-3 P n
- Met i e y
_ Kt CSS s
yh e
b d
e i
l k
t s
P w
c e
h C
w i
e v
e R
t n
e n
o p
o n
o C
l a
c i
n a
h c
e M
)
n 0 d> no oi 3
uia t
e g
yr i. taccf i i
a P,
t io i i
. fi s s
wo c s a ct s s s I e .
i v
~
3 t
l f
olefadnlalc vgac c e
' i n r r ns yi R, C e ei et em 1O U t t l aaud ooa fh c 5-e n WWFCSS 2 D.
01 t
o - 5 3 -
t s P20 rl l M- K oi . . . . .
NM 345678.
222222 KC A C
( C
Nort ilities CK-MP3-42-5.1 ~
~
Millstone Unit 3 Systeem Sheet of Mechanical Cesoposent Review Checklist PIPELINES Cosopenent ID. _
Licensing Speci6 cation Calculaties Vad/ Design List / Acceptable g Attributes Requirennent Reesiressent Reemireement Drawier Database Y/N/NA CW i
- l. Material
- 2. Pressure Ratmg/sch
- 3. Size
- 4. Code Class.
- 5. Seismic Class
- 6. Design Pressure
- 7. DesignTemperature
- 8. Operating Pressure
- 9. Operating Temperature
- 10. Insulation'Iluckness Prepared by Date (CK-MP3-02-5.1, Rev.1. Page 31) l C:\CK02-S t. DOC