Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20210U687 + (05:53:02, 6 December 2024)
- B12417, Advises That All Correspondence to Utils Should Be Addressed to Ej Mroczka to Assure That All Appropriate Personnel Receive NRC Correspondence & That All Necessary Actions Properly & Promptly Taken + (05:53:04, 6 December 2024)
- ML20210U684 + (05:53:04, 6 December 2024)
- ML20210U680 + (05:53:05, 6 December 2024)
- ML20210U679 + (05:53:06, 6 December 2024)
- ML20210U677 + (05:53:07, 6 December 2024)
- ML20210U675 + (05:53:08, 6 December 2024)
- ML20210U674 + (05:53:08, 6 December 2024)
- ML20210U673 + (05:53:09, 6 December 2024)
- ML20210U671 + (05:53:10, 6 December 2024)
- ML20210U670 + (05:53:10, 6 December 2024)
- ML20210U667 + (05:53:11, 6 December 2024)
- ML20210U669 + (05:53:11, 6 December 2024)
- 05000312/LER-1987-002, :on 870108,determined That One Area in Existing Plant Electrical Distribution Sys in Noncompliance W/ 10CFR50,App R.Caused by Original Design Error.Instructions Written & Corrective Design Mods Initiated + (05:53:13, 6 December 2024)
- ML20210U665 + (05:53:15, 6 December 2024)
- ML20210U663 + (05:53:16, 6 December 2024)
- PNO-I-87-010, on 870211,reactor Scrammed from Full Power During Transient Initiated by Loss of Instrument Bus.Safety Injection Signal Received on High Steam Flow Coincident W/Low Steam Line Pressure.Plant Stabilized in Hot Shutdown + (05:53:16, 6 December 2024)
- 05000245/LER-1997-034-01, :on 970812,Unit 1 Switchgear Failed During Unit 2 High Energy Line Break.Caused by Incorrect Assumption by HELB Analysis Performed by A&E.No Immediate Corrective Actions Required + (05:53:18, 6 December 2024)
- JAFP-86-0437, Forwards Response to IE Bulletin 85-003, Motor-Operated Valve Common Mode Failures During Plant Transients Due to Improper Switch Settings. No Valves Identified W/Design Differential Pressures Lower than Anticipated + (05:53:19, 6 December 2024)
- ML20210U657 + (05:53:20, 6 December 2024)
- ML20210U658 + (05:53:20, 6 December 2024)
- 3F0997-31, Forwards EOP EOP-02, Vital Sys Status Verification, in Response to Rai, Re TS Change Request 210 + (05:53:21, 6 December 2024)
- PNO-V-86-028, on 860525,while Reducing Power for Turbine Overspeed Trip Test,Operator Error in Controlling Feedwater Flow Caused Reactor Trip.Sys Restored to Normal Mode 3.On 860526 Sys Started & Entered Mode 1 + (05:53:21, 6 December 2024)
- ML20210U651 + (05:53:23, 6 December 2024)
- ML20210U653 + (05:53:23, 6 December 2024)
- IR 05000259/1987001 + (05:53:25, 6 December 2024)
- 05000245/LER-1997-034, Forwards LER 97-034-00 Documenting Event That Occurred at Millstone Nuclear Power Station,Unit 1 on 970812.Listed Commitments Made within Ltr + (05:53:26, 6 December 2024)
- IR 05000353/1986007 + (05:53:29, 6 December 2024)
- IR 05000247/1986019 + (05:53:34, 6 December 2024)
- ML20210U645 + (05:53:34, 6 December 2024)
- ML20210U642 + (05:53:35, 6 December 2024)
- ML20210U641 + (05:53:35, 6 December 2024)
- ML20210U640 + (05:53:37, 6 December 2024)
- ML20210U638 + (05:53:38, 6 December 2024)
- ML20210U639 + (05:53:38, 6 December 2024)
- ML20210U637 + (05:53:39, 6 December 2024)
- ML20210U636 + (05:53:39, 6 December 2024)
- ML20210U632 + (05:53:40, 6 December 2024)
- ML20210U633 + (05:53:40, 6 December 2024)
- ML20210U630 + (05:53:42, 6 December 2024)
- ML20210U631 + (05:53:42, 6 December 2024)
- ML20210U627 + (05:53:43, 6 December 2024)
- ML20210U626 + (05:53:44, 6 December 2024)
- IR 05000188/1986001 + (05:53:45, 6 December 2024)
- ML20210U624 + (05:53:45, 6 December 2024)
- ML20210U622 + (05:53:46, 6 December 2024)
- ML20210U619 + (05:53:48, 6 December 2024)
- ML20210U616 + (05:53:48, 6 December 2024)
- ML20210U614 + (05:53:49, 6 December 2024)
- ML20210U615 + (05:53:49, 6 December 2024)
- ML20210U613 + (05:53:50, 6 December 2024)