ML20210U624

From kanterella
Jump to navigation Jump to search
Summarizes Meeting W/Acrs & Consultants Re Plant Seismic Plan.Proposal to Include Peak Acceleration Values in Seismic Reevaluation Program Accepted
ML20210U624
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 05/25/1984
From: Vollmer D
NRC
To: Harold Denton
NRC
Shared Package
ML20210U520 List:
References
FOIA-86-197 NUDOCS 8610100130
Download: ML20210U624 (1)


Text

9 KICg

[gL

^

'e UNITED STATES

$.i ".. ' f, S

NUCLEAR REGULATORY COMMISSION N-WASHINGTON. D. C. 20555

  • Y'u/E f-

/

,%,...../

May 25, 1984 3p{

f

,F NOTE T0:

Harold D

SUBJECT:

ACRS MEETING ON DIABl.0 CANYON SEISMIC PLAN We met with ACRS and their consultants to discuss the possible impact of the Crouch paper. Okrent has specifically asked us for a bounding analyses of moving Hosgri close to site with consi_deration of current views on verticle to horizontal acceleration and assuming Hosgri a thrust fault. Peak acceleration values were significantly higher than design with these assumptions. ACRS and consultants did not express concern over these values, appeared to feel when all factors were in place that design values would not likely change, they appeared to accept our proposal of wrapping this into seismic reevaluation program.

Dick Vollmer dictated but not read:5/25/84:Im

()

8610100130 860930 l

PDR FOIA HOLM 586-197 PDR

-