T{
Don K. Schopfer Vice President 312-269-6078 September 17,1997 Project No. 9583-100 Docket No. 50-423 Northeast Nuclear Energy Company -
Millstone Nuclear Power Station, Unit 3 Independent Corrective Action Verification I'rogram United States Nuclear Regulatory Commission Attention: Document Control Desk
- Washington, D.C. _20555 Sargent & Lundy has review ~j the Nuclear Regulatory Commission's August 21,1997 letter
- responding to the proposed sampling criteria included in our August 5,1997 submittal. In response to your letter, we offer the following responses and clarifications:
1.-
Clarification of two-level procesa for review of tubing stress calculations and vent and drain stress calculations:
The proposed two-level review process for the review of tubing stress calculations and vent'and drain stress calculations is slightly different than the two-level review process for large bore stress calculations. The first level of the two-level review process for tubing stress and vent & drain stress calculations includes a detailed review of the implementing procedures'and critcria, NETM-24 and NETM-25, for adequacy to code, design and -
licensing basis requirements. The second level includes a detailed review of10% of the
- total population of tubing stress and vent and drain stress calculations.
+
2.
Response to NRC comment I regarding selection of 10% sample:
{
In selecting our 10% sample, we will attempt to include the most critical piping analysis and pipe support calculations based on the engineeringjudgment of the technical
))
reviewers.
g 9
9709220001 970917
%... l l PDR ADOCK 05000423 P
!j n S f'M t
55 East Monroe Street
- Chicago,IL 60603-5780 USA 312-269-2000
.8
N..*
United States Nuclear Regulatory Commission September 17,1997 Document Control Desk Project No. 9583-100.
Page 2 Ifyou have any questions regarding this matter, please contact me at (312) 269-6078.
Yours very truly, -
b.
e D.K Schopfer l
Vice President & ICAVP Manager DKS.spr Copies: