Offers Listed Responses & Clarifications in Response to Re Proposed Sampling Criteria Included in 970805 Submittal
ML20210U622
Person / Time
Site: Millstone 
Issue date: 09/17/1997
From: Schopfer D
SARGENT & LUNDY, INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
9583-100, NUDOCS 9709220001
Download: ML20210U622 (2)


Text

I_

/

yy3 --

N. :

SergentsI Lundy"*

T{

Don K. Schopfer Vice President 312-269-6078 September 17,1997 Project No. 9583-100 Docket No. 50-423 Northeast Nuclear Energy Company -

Millstone Nuclear Power Station, Unit 3 Independent Corrective Action Verification I'rogram United States Nuclear Regulatory Commission Attention: Document Control Desk

- Washington, D.C. _20555 Sargent & Lundy has review ~j the Nuclear Regulatory Commission's August 21,1997 letter

responding to the proposed sampling criteria included in our August 5,1997 submittal. In response to your letter, we offer the following responses and clarifications:

1.-

Clarification of two-level procesa for review of tubing stress calculations and vent and drain stress calculations:

The proposed two-level review process for the review of tubing stress calculations and vent'and drain stress calculations is slightly different than the two-level review process for large bore stress calculations. The first level of the two-level review process for tubing stress and vent & drain stress calculations includes a detailed review of the implementing procedures'and critcria, NETM-24 and NETM-25, for adequacy to code, design and -

licensing basis requirements. The second level includes a detailed review of10% of the

- total population of tubing stress and vent and drain stress calculations.

+

2.

Response to NRC comment I regarding selection of 10% sample:

{

In selecting our 10% sample, we will attempt to include the most critical piping analysis and pipe support calculations based on the engineeringjudgment of the technical

))

reviewers.

g 9

9709220001 970917

%... l l PDR ADOCK 05000423 P

PDR

!j n S f'M t

55 East Monroe Street

  • Chicago,IL 60603-5780 USA 312-269-2000

.8

N..*

United States Nuclear Regulatory Commission September 17,1997 Document Control Desk Project No. 9583-100.

Page 2 Ifyou have any questions regarding this matter, please contact me at (312) 269-6078.

Yours very truly, -

b.

e D.K Schopfer l

Vice President & ICAVP Manager DKS.spr Copies:

E. Imbro - Deputy Director, ICAVP Oversight.

T. Concannon - Nuclear Energy Advisory Council J. Fougere - NU B. A. Erler - S&L arcke9wrWhr0912b.duc i