Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211P569 + (02:25:09, 6 December 2024)
- ML20211P568 + (02:25:10, 6 December 2024)
- ML20211P565 + (02:25:12, 6 December 2024)
- ML20211P561 + (02:25:13, 6 December 2024)
- ML20211P559 + (02:25:13, 6 December 2024)
- 05000219/LER-1997-012, :on 970916,setpoint Was Found to Be non-conservative.Caused by Failure to Include Possible Uncertainties.Appropriate Procedures Were Revised to Reflect New Setpoint Based on SE + (02:25:15, 6 December 2024)
- ML20211P554 + (02:25:16, 6 December 2024)
- ML20211P553 + (02:25:17, 6 December 2024)
- NRC-97-0113, Submits Commitments Re Fermi 2 S/Rv as Agreed During 971015 + (02:25:18, 6 December 2024)
- ML20211P549 + (02:25:19, 6 December 2024)
- NSD-NRC-97-5374, Submits AP600 Response to Loss of Offsite Power That Was Requested by Tad Arsh at 970904,meeting W/Nrc on Fire Protection.Analysis Uses More Realistic Assumptions than Used in SSAR Analysis + (02:25:22, 6 December 2024)
- ML20211P546 + (02:25:25, 6 December 2024)
- BSEP-87-0181, Semiannual Radioactive Effluent Release Rept Jul-Dec 1986 + (02:25:26, 6 December 2024)
- ML20211P545 + (02:25:26, 6 December 2024)
- ML20211P542 + (02:25:27, 6 December 2024)
- ML20211P543 + (02:25:27, 6 December 2024)
- 3F0287-17, Ro:On 870121,during Performance of Surveillance Procedure SP-110,CRD a Ac Breaker Failed to Trip.Caused by Malfunction of Undervoltage Trip Coil Device.Breaker Replaced & Successfully Tested + (02:25:29, 6 December 2024)
- ML20211P539 + (02:25:30, 6 December 2024)
- ML20211P537 + (02:25:30, 6 December 2024)
- ML20211P533 + (02:25:31, 6 December 2024)
- ML20211P531 + (02:25:32, 6 December 2024)
- ML20211P532 + (02:25:32, 6 December 2024)
- ML20211P529 + (02:25:33, 6 December 2024)
- ML20211P527 + (02:25:35, 6 December 2024)
- 05000220/LER-1986-020, :on 860618,during Startup from Refueling Outage,Pinhole Leak Discovered in newly-installed 3/4-inch Sample Line Outside Primary Containment.Caused by Flaw in Pipe.Line Disconnected,Capped & Tested + (02:25:35, 6 December 2024)
- ML20211P526 + (02:25:36, 6 December 2024)
- ML20211P523 + (02:25:38, 6 December 2024)
- ML20211P522 + (02:25:39, 6 December 2024)
- ML20211P517 + (02:25:39, 6 December 2024)
- ML20211P516 + (02:25:40, 6 December 2024)
- ML20211P513 + (02:25:41, 6 December 2024)
- ML20211P511 + (02:25:41, 6 December 2024)
- ML20211P510 + (02:25:42, 6 December 2024)
- PNO-I-99-042, on 990909,DC Fabricators,Inc Notified Region I Package Shipped Containing Generally Licensed Device Failed to Arrive at Destination.Licensee & Tn Technologies Working UPS Since August to Locate Package.Nj & Tx Notified + (02:25:42, 6 December 2024)
- ML20211P505 + (02:25:43, 6 December 2024)
- ML20211P503 + (02:25:44, 6 December 2024)
- ML20211P502 + (02:25:44, 6 December 2024)
- ML20211P500 + (02:25:45, 6 December 2024)
- ML20211P501 + (02:25:45, 6 December 2024)
- ML20211P499 + (02:25:46, 6 December 2024)
- ML20211P495 + (02:25:49, 6 December 2024)
- ML20211P496 + (02:25:49, 6 December 2024)
- ML20211P493 + (02:25:50, 6 December 2024)
- ML20211P489 + (02:25:53, 6 December 2024)
- ML20211P488 + (02:25:54, 6 December 2024)
- ML20211P487 + (02:25:55, 6 December 2024)
- 05000029/LER-1986-006, :on 860619,blowdown Line from Steam Generator 3 Isolated (Closed VD-V-631) in Preparation to Repair Leak in Downstream Line & Declared Inoperable.Line Returned to Svc on 860621 + (02:25:57, 6 December 2024)
- ML20211P485 + (02:25:57, 6 December 2024)
- 05000369/LER-1986-011-02, :on 860605,diesel Generator 1A Automatically Started Due to Train a Blackout Actuation.Caused by Design Deficiency.Ite 27H-type Relays on 4,160-volt Switchgear Group 1ETA Replaced + (02:25:59, 6 December 2024)
- ML20211P479 + (02:26:00, 6 December 2024)
- ML20211P477 + (02:26:01, 6 December 2024)