ML20211P503
| ML20211P503 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 10/09/1997 |
| From: | Meyer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Danni Smith PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| References | |
| NUDOCS 9710200218 | |
| Download: ML20211P503 (4) | |
Text
_ - _
9 October 9, 1997 s
Mr. D. M.' Smith, President PECO Nuclear Nuclear Group Headquarters Correspondence Control Desk P.' O. Box 195 Wayne, PA 19087 0195 SUSJECT:
SENIOR REACTOR AND REACTOR OPERATOR INITIAL EXAMINATIONS -
LIMERICK
Dear Mr. Smith:
In a telephone conversation on October 8,1997, between Mr. J. Williams and
'Ar. P. Orphanos arrangements were made for the administration of licensing examinations at the Limerick Generating Station during the week of January 19,1998.
Your staff will prepare the proposed examinations in accordance with the guidelines in Revision 8, of NUREG-1021, " Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.
To meet the above schedule, it will be c.ecessary for your staff to furnish the proposed examination outlines by November 21,-1997. The written examinations, operating tests, and the supporting referenca materials identified in Attachment 2 of ES-201 will be due by December 19,1997. Any delay in receiving the required examination or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.
In order to conduct the request 9d written examination and operating tests,it will be necessar/ for your staff to provide adequate space and accommodations in accordance with ES-402, and to make tiie simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatuias, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG 1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.
f lGL O l
+
9710200210 971009
- =
' oja" lipipipipiglipp ao"
4 Mr. D. M. Smith 2
To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number -
3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date, if the applications are not received at least 30 days before the examination' date, a postponement msy be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.
s This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0101, which expires on April 30, 2000.
The public reporti'ig burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, and completing and reviewing the colection of information.
Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the information and Records Management Branch (T-6 F33),
U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet electronic mail at BJS1@NRC. GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unlesu it displays a currently valid OMB control number.
Thank you for your cooperation in this matter. Mr. Orphanos ahs been advised of the policies and guidelines referenced in this letter. If you have any questions regarding this inspection, please contact J. Williams at (610) 337 5124 or me at (610) 337-5211.
Sincerely, Glenn W. Meyer, Chief Operator Licensing and Human Performance Branch Division of Heactor Safety Docket Nos. 50-352; 50 353
+
l Mr. D M. Smith 3
cc:
G. A. Hunger, Jr., Chairman, Nuclear Review Board and Director Licensing W. MacFarland, Vice President Limerick Generating Station J. L. Kantner, Manager, Experience Assessment L. Hopkins, Director, Training Secretary, Nuclear Committee of the Board R. A. Calvan, Regional Director, FEMA, Region lli (EP Exercise /lRs Only)
Commonwealth of Pennsylvania i
o
O Mr. D. M. Smith 4
Distribution:
Region i Docket Room (with concurrences)
P. Swetland, DRP A. Keatley, DRP J. Wilkams, DRS G. Meyer, DRS NRC Resident inspector Nuclear Safety Information Center (NSIC)
PUBLIC W. Dean, OEDO F. Rinaldi, NRR J. Stolz, PDl 2, NRR Inspection Program Branch, NRR (IPAS)
R. Correla, NRR F. Talbot, NRR DOCDESK OL Facility File DRS File DOCUMENT NAME: A: OLEXAM. LIM To recche a copy or this document indicate in the bos
'C" = Copy without attachmenvenclosurc 'l?
- Copy with attachment / enclosure
'N" = No copy OFFICE Rl/DRS Rl/DRS Rl/
Rll Rll
, j_ j NAME JWilliams GTW, GMeyer L
DATE 10/08/97 ' 4)/7 10/$ /97 0"
10/ /97 10/ /97 10/ /97 OFFICIAL RECORD CCPY
_ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _