ML20211P485
Jump to navigation
Jump to search
| ML20211P485 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 10/31/1986 |
| From: | Woodard J ALABAMA POWER CO. |
| To: | |
| Shared Package | |
| ML20211P397 | List: |
| References | |
| NUDOCS 8703020375 | |
| Download: ML20211P485 (1) | |
Text
,
Revision 1 OPERATING DATA REPORT DOCKET NO. 50-148 DATE 12-09-86 COMPLETED BY J. D. Wondard TELEPHONE (?nsiR44-5156 OPERATING STATUS
- 1. Unit Name: Joseoh M. Farlev - Unit 1 otes Cumulative data since
- 2. Reporting Period: n t-t nho r. 1496
- 3. Licensed Thermal Power (MWt):
7647' commercial operation.
- 4. Nameplate Rating (Gross MWe):
R60
$. Design Electrical Rating (Net MWe): R24
- 6. Maximum Dependable Capacity (Gross MWe):
873 4
- 7. Maximum Dependable Capacity (Net MWe):
827.5
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through f) Since Last Report, Give Reasons:
N/A
- 9. Power Level To Which Restricted,if Any (Net MWe):
N/A
- 10. Reasons For Restrictions,if Any:
P!/A This Month Yr to.Date Cumulative
- 11. Hours In Reporting Period 74R 7.9 6 7R.16R
- 12. Number Of Hours Reactor Was Critical 72 6.532.4 56.165.5
- 13. Reactor Reserve Shutdovn Hours 0.0 0.0 3,650
- 14. Hours Generator On-Line 71.6 6.505.0 54.910.6
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross The rnal Ener;y Genersted (MWH) 181.323 16.739.470 139.611.012
'17. Gross Electrical Energy Generated (MWH) 58.520 5.499.994 44.803.374
- 18. Net Electrical EnerEy Generated (MWH) 49,718 5,209,788 42,207,506
- 19. Unit Service Factor 9.6 89.2 70.2
- 20. Unit Availability Factor 9.6 89.2 70.2
- 21. Unit Capacity Factor (Using MDC Net) 8.1 86.3 67.3
- 22. Unit Capacity Fs: tor (Using DER Net) 8.1 86.1 65.1 0.0 1.8 10.6
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type.Date,and Duration of Each):
N/A l
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
11/17/86
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved l
INITIAL CRITICALITY 08/06/77 08/09/77 INITIAL ELECTRICITY 08/20/77 08/18/77 COMMERCIAL OPERATION 12/01/77 12/01/77 G703020375 861209 PDR ADOCK 05000348 R
PDR (9/77)