Letter Sequence Other |
---|
|
|
MONTHYEARML20209E9881986-09-0202 September 1986 Application for Amends to Licenses NPF-2 & NPF-8,changing Snubber Surveillance Requirements to Increase Allowable Time Interval Between Visual Surveillances When Snubber Sys Operating at High Level of Dependability.Fee Paid Project stage: Request ML20214D2161986-11-18018 November 1986 Notification of 861120 Meeting W/Util,Southern Co Svcs,Inc & Bechtel in Bethesda,Md to Discuss Proposed Change to Tech Specs Re Snubber Surveillances Project stage: Meeting ML20236S4401986-12-30030 December 1986 Summary of 861120 Meeting W/Util Re Proposed Tech Spec Changes to Snubber Surveillance Insp Intervals Project stage: Meeting ML20210G8471987-02-0909 February 1987 Proposed Tech Specs,Incorporating Revised Proposed Snubber Visual Insp Schedule Project stage: Other ML20210F8011987-02-0909 February 1987 Application for Amends to Licenses NPF-2 & NPF-8,changing Tech Specs Re Snubber Surveillance Requirements.Request Suppls 860902 Tech Spec Submittal by Providing Requested Revised Proposed Snubber Visual Insp Schedule.Fee Paid Project stage: Request ML20211P5691987-02-25025 February 1987 Proposed Tech Specs Re Snubber Surveillance Requirements & Visual Insp Schedule Project stage: Other ML20211P5001987-02-25025 February 1987 Application to Amend Licenses NPF-2 & NPF-8,revising Tech Specs to Allow Snubber Failures to Be Expressed as Percentage of Specific Snubber Population in New Snubber Visual Insp Schedule Project stage: Request ML20212C8781987-02-27027 February 1987 Forwards Info Re Plant Snubbers,Including Date of Failures & Current safety-related Snubber Population Project stage: Other ML20154E8471988-09-0909 September 1988 Forwards Proposed Schedules for Completion of Licensing Items,Including Prioritized Listing of License Amend & Other Requests & Listing of NRC-related Submittals Project stage: Other 1987-02-25
[Table View] |
|
---|
Category:TECHNICAL SPECIFICATIONS
MONTHYEARML20217B1791999-10-0404 October 1999 Revised TS Re Control Room,Penetration Room & Containment Purge Filtration Sys & Radiation Monitoring Instrumentation, Reflecting Agreements Reached in 990909 & 16 Discussions ML20209B8161999-06-30030 June 1999 Proposed Tech Specs Chapters 3.4,3.5,3.6,3.7,4.0 & 5.0, Converting to ITS ML20196J8731999-06-30030 June 1999 Proposed Tech Specs Correcting Errors,Per 990222 TS Amend Re Control Room,Penetration Room & Containment Purge Filtration Systems & Radiation Monitoring Instrumentation ML20207D6421999-05-31031 May 1999 Proposed Conversion to ITSs for Chapter 3.3 ML20206H0001999-04-30030 April 1999 Proposed Revs to Previously Submitted Tech Specs with LAR Related to RAI on Conversion to ITS ML20206F4421999-04-30030 April 1999 Proposed Revs to Previously Submitted Tech Specs with LAR Related to RAI Re Conversion to Its,Chapter 3.8 ML20206B4721999-04-21021 April 1999 Corrected Proposed TS Pages 5.5-6,5.5-7,5.5-8 & 5.5-9, Replacing Current W Model 51 SGs with W Model 54F ML20205G8571999-04-0202 April 1999 Proposed Ts,Increasing Dei Limit from 0.15 to Uci/Gram IAW 10CFR50.90 ML20205A2401999-03-19019 March 1999 Proposed Tech Specs Table 3.3-6,re Cr,Penetration Room & Containment Purge Filtration Sys & Radiation Monitoring Instrumentation ML20207C2451999-02-22022 February 1999 Proposed TS Amends to Clarify SR Refs to ANSI N510 Sections 10,12 & 13 to ASME N510-1989,with Errata Dtd Jan 1991 & to Add Footnote Which Refs FNP FSAR for Relevant Testing of Details ML20203A7711999-02-0303 February 1999 Proposed Tech Specs Pages Re Conversion to Its,Chapter 3.4 ML20196B6241998-11-20020 November 1998 Proposed Tech Specs Pages Re Conversion to Improved TS, Chapters 3.6.& 5.0 ML20155J4561998-11-0606 November 1998 Proposed Tech Specs Re Nuclear Instrumentation Sys Power Range Daily Surveillance Requirement ML20154K2521998-10-12012 October 1998 Proposed Tech Specs Section 6,providing Recognition of Addl Mgt Positions Associated with SG Replacement Project & Providing Ability to Approve Procedures Re Project Which May Affect Nuclear Safety ML20237D4111998-08-20020 August 1998 Proposed Tech Specs Reflecting Conversion to Improved TS Re Discussion of Changes & Significant Hazards Evaluations ML20217N4801998-05-0101 May 1998 Proposed Tech Specs Bases Pages Re Safety Limits,Reactivity Control Systems & Afs ML20217Q7261998-03-20020 March 1998 Proposed Tech Specs Re Power Update Implementation,Replacing Page 6-19a ML20202G1311998-02-12012 February 1998 Proposed Tech Specs Re Pressure Temp Limits Rept ML20202F1121998-02-12012 February 1998 Revised Proposed Changes to TS Page 6-19a for Power Uprate ML20198H3661998-01-0707 January 1998 Proposed Tech Specs Pages,Adding Note to Specifically Indicate Normal or Emergency Power Supply May Be Inoperable in Modes 5 or 6 Provided That Requirements of TS 3.8.1.2 Are Satisfied ML20198E6621997-12-31031 December 1997 Proposed Tech Specs Changing Nis IR Neutron Flux Reactor Trip Setpoint & Allowable Value ML20198E3141997-12-30030 December 1997 Proposed Tech Specs Re Auxiliary Bldg & Svc Water Bldg Battery Surveillances ML20197B6691997-12-18018 December 1997 Proposed Tech Specs Pages Re 970723 TS Amend Request Associated W/Pressure Temperature Limits Rept ML20211P5861997-10-16016 October 1997 Proposed Tech Specs Pages,Revising Number of Allowable Charging Pumps Capable of Injecting in RCS When Temperature of One or More of RCS Cold Leg Temperatures Is Less than 180 F ML20211J1501997-09-30030 September 1997 Proposed Tech Specs,Correcting Page 20 of 970723 TS Amend Request to Relocate RCS Pressure & Temperature Limits from TS to Pressure & Temperature Limit Rept ML20217C0341997-09-25025 September 1997 Revised Proposed Ts,Providing Addl Info Re 970630 Submittal, Titled, Jfnp TS Change Request - Credit for B for Spent Fuel Storage ML20211A6891997-09-17017 September 1997 Proposed Tech Specs Re Primary Coolant Specific Activity ML20216D0031997-09-0303 September 1997 Proposed Tech Specs Re Moveable Incore Detector Sys ML20149K1001997-07-23023 July 1997 Proposed Tech Specs,Relocating RCS P/T Limits from TS to Proposed P/T Limits Rept IAW Guidance Provided by GL 96-03, Relocation of P/T Limit Curves & LTOP Sys Limits ML20148R7521997-06-30030 June 1997 Proposed Tech Specs,Incorporating Requirements Necessary to Change Basis for Prevention of Criticality in Fuel Storage Pool.Change Eliminates Credit for Boraflex as Neutron Absorbing Matl in Fuel Storage Pool Criticality Analysis ML20148Q1041997-06-30030 June 1997 Proposed Tech Specs,Revising & Clarifying Requirements for CR Emergency & Penetration Room Filtration Sys,Required Number of Radiation Monitoring Instrumentation Channels & Deleting Containment Purge Exhaust Filter Spec ML20148K7501997-06-13013 June 1997 Proposed Tech Specs Changing TS 3/4.9.13, Storage Pool Ventilation (Fuel Movement) ML20140A3931997-05-28028 May 1997 Proposed Tech Specs,Clarifying That Testing of Each Shared EDG to Comply W/Sr 4.8.1.1.2.e Is Only Required Once Per Five Years on a Per EDG Basis,Not on Per Unit Basis ML20148E5921997-05-27027 May 1997 Proposed Tech Specs Pages Revising Applicable Modes for Source Range Nuclear Instrumentation & Providing Allowances for an Exception to Requirements for State of Power Supplies for RHR Discharge to Charging Pump Suction Valves ML20148F2381997-05-27027 May 1997 Corrected TS Bases Page B 3/4 1-3 That Incorporates Changes from COLR & Elimination of Containment Spary Additive Sys TS Amends ML20138B9251997-04-23023 April 1997 Proposed Tech Specs,Revising TS Pages to Include Footnote Concerning Filter Pressure Drop Testing & Mechanical Heater Testing ML20137H6091997-03-25025 March 1997 Proposed Tech Specs Re Primary Coolant Specific Activity ML20136F8231997-03-0707 March 1997 Proposed Tech Specs 3/4.6.3 Re Containment Isolation Valves Surveillance Requirements ML20135C6731997-02-24024 February 1997 Proposed Tech Specs Re Surveillance Requirements of Control Room,Penetration Room & Containment Purge Filtration Systems ML20135C4941997-02-24024 February 1997 Proposed Tech Specs Re SG Tube Laser Welded Sleeves.Voltage Based Alternate Repair Criteria Is Approved Prior to Laser Welded Sleeve Amend ML20135C8641997-02-14014 February 1997 Proposed Tech Specs Revising Specified Max Power Level & Definition of Rated Thermal Power ML20134J4051997-02-0606 February 1997 Proposed Tech Specs,Providing Addl Info Re voltage-based Repair Criteria for SG Tubing ML20133G5801997-01-10010 January 1997 Proposed Tech Specs Re Generic Laser Weld Sleeving & Deleting One Cycle Implementation of L* Which Expired at Last Unit 2 Outage ML20138G9581996-12-26026 December 1996 Proposed Tech Specs Reflecting Guidance Contained in GL 95-05, SG Tube Support Plate Voltage-Based Repair Criteria, Using Revised Accident Leakage Limit of 20 Gpm & Using Probability of Detection That Is Voltage Dependent ML20134N9211996-11-18018 November 1996 Proposed Tech Specs Bases B 3/4 2-5 Re RCS Total Flow Rate Surveillance ML20134K5551996-11-15015 November 1996 Proposed Tech Specs 3.6.2.2 Re Spray Additive Sys ML20134G9601996-11-11011 November 1996 Proposed Tech Specs Amending License NPF-8 to Replace Farley Specific Laser Welded Sleeve Requirements Currently in TS W/Generic Laser Welded Sleeve Process ML20149L8991996-11-0606 November 1996 Revised Technical Specification Pages for Plant Units 1 & 2 ML20128M4821996-10-0808 October 1996 Proposed Tech Specs Reflecting Deletion of Cycle Specific L* Repair Criteria Which Expires at Start of Next Unit 2 Refueling Outage ML20128F8821996-09-30030 September 1996 Proposed Tech Specs Change Request Relocating cycle-specific Core Operating Parameter Limits to Colr.Proposed Changes Based on Guidance Found in NRC GL 88-16,WOG-90-016, NUREG-1431 & COLR Approved by NRC 1999-06-30
[Table view] Category:TECHNICAL SPECIFICATIONS & TEST REPORTS
MONTHYEARML20217B1791999-10-0404 October 1999 Revised TS Re Control Room,Penetration Room & Containment Purge Filtration Sys & Radiation Monitoring Instrumentation, Reflecting Agreements Reached in 990909 & 16 Discussions ML20209B8161999-06-30030 June 1999 Proposed Tech Specs Chapters 3.4,3.5,3.6,3.7,4.0 & 5.0, Converting to ITS ML20196J8731999-06-30030 June 1999 Proposed Tech Specs Correcting Errors,Per 990222 TS Amend Re Control Room,Penetration Room & Containment Purge Filtration Systems & Radiation Monitoring Instrumentation ML20207D6421999-05-31031 May 1999 Proposed Conversion to ITSs for Chapter 3.3 ML20206H0001999-04-30030 April 1999 Proposed Revs to Previously Submitted Tech Specs with LAR Related to RAI on Conversion to ITS ML20206F4421999-04-30030 April 1999 Proposed Revs to Previously Submitted Tech Specs with LAR Related to RAI Re Conversion to Its,Chapter 3.8 ML20206B4721999-04-21021 April 1999 Corrected Proposed TS Pages 5.5-6,5.5-7,5.5-8 & 5.5-9, Replacing Current W Model 51 SGs with W Model 54F L-99-170, Snoc Jfnp Startup Test Rept Unit 1 Cycle 16. with1999-04-20020 April 1999 Snoc Jfnp Startup Test Rept Unit 1 Cycle 16. with ML20205S9641999-04-20020 April 1999 Snoc Jfnp Startup Test Rept Unit 1 Cycle 16. with ML20205G8571999-04-0202 April 1999 Proposed Ts,Increasing Dei Limit from 0.15 to Uci/Gram IAW 10CFR50.90 ML20205A2401999-03-19019 March 1999 Proposed Tech Specs Table 3.3-6,re Cr,Penetration Room & Containment Purge Filtration Sys & Radiation Monitoring Instrumentation ML20205A3101999-02-28028 February 1999 Analysis of Capsule Z from Alabama Power Co Jm Farley Unit 2 Reactor Vessel Radiation Surveillance Program ML20207C2451999-02-22022 February 1999 Proposed TS Amends to Clarify SR Refs to ANSI N510 Sections 10,12 & 13 to ASME N510-1989,with Errata Dtd Jan 1991 & to Add Footnote Which Refs FNP FSAR for Relevant Testing of Details ML20203A7711999-02-0303 February 1999 Proposed Tech Specs Pages Re Conversion to Its,Chapter 3.4 ML20205T0011998-12-23023 December 1998 Rev 17 to FNP-0-M-011, Odcm ML20205T0081998-12-23023 December 1998 Rev 18 to FNP-0-M-011, Odcm ML20196B6241998-11-20020 November 1998 Proposed Tech Specs Pages Re Conversion to Improved TS, Chapters 3.6.& 5.0 ML20155J4561998-11-0606 November 1998 Proposed Tech Specs Re Nuclear Instrumentation Sys Power Range Daily Surveillance Requirement ML20154K2521998-10-12012 October 1998 Proposed Tech Specs Section 6,providing Recognition of Addl Mgt Positions Associated with SG Replacement Project & Providing Ability to Approve Procedures Re Project Which May Affect Nuclear Safety ML20151V6991998-09-11011 September 1998 Snoc Jm Farley Nuclear Plant Startup Test Rept Unit 2 Cycle 13. with ML20237D4111998-08-20020 August 1998 Proposed Tech Specs Reflecting Conversion to Improved TS Re Discussion of Changes & Significant Hazards Evaluations ML20217N4801998-05-0101 May 1998 Proposed Tech Specs Bases Pages Re Safety Limits,Reactivity Control Systems & Afs ML20205S9971998-04-19019 April 1998 Rev 16 to FNP-0-M-011, Odcm ML20217Q7261998-03-20020 March 1998 Proposed Tech Specs Re Power Update Implementation,Replacing Page 6-19a ML20202G1311998-02-12012 February 1998 Proposed Tech Specs Re Pressure Temp Limits Rept ML20202F1121998-02-12012 February 1998 Revised Proposed Changes to TS Page 6-19a for Power Uprate ML20198H3661998-01-0707 January 1998 Proposed Tech Specs Pages,Adding Note to Specifically Indicate Normal or Emergency Power Supply May Be Inoperable in Modes 5 or 6 Provided That Requirements of TS 3.8.1.2 Are Satisfied ML20198E6621997-12-31031 December 1997 Proposed Tech Specs Changing Nis IR Neutron Flux Reactor Trip Setpoint & Allowable Value ML20198E3141997-12-30030 December 1997 Proposed Tech Specs Re Auxiliary Bldg & Svc Water Bldg Battery Surveillances ML20197B6691997-12-18018 December 1997 Proposed Tech Specs Pages Re 970723 TS Amend Request Associated W/Pressure Temperature Limits Rept ML20212B1791997-10-31031 October 1997 1 SG ARC Analyses in Support of Full Cycle Operation ML20211P5861997-10-16016 October 1997 Proposed Tech Specs Pages,Revising Number of Allowable Charging Pumps Capable of Injecting in RCS When Temperature of One or More of RCS Cold Leg Temperatures Is Less than 180 F ML20211J1501997-09-30030 September 1997 Proposed Tech Specs,Correcting Page 20 of 970723 TS Amend Request to Relocate RCS Pressure & Temperature Limits from TS to Pressure & Temperature Limit Rept ML20217C0341997-09-25025 September 1997 Revised Proposed Ts,Providing Addl Info Re 970630 Submittal, Titled, Jfnp TS Change Request - Credit for B for Spent Fuel Storage ML20211A6891997-09-17017 September 1997 Proposed Tech Specs Re Primary Coolant Specific Activity ML20216D0031997-09-0303 September 1997 Proposed Tech Specs Re Moveable Incore Detector Sys ML20149K1001997-07-23023 July 1997 Proposed Tech Specs,Relocating RCS P/T Limits from TS to Proposed P/T Limits Rept IAW Guidance Provided by GL 96-03, Relocation of P/T Limit Curves & LTOP Sys Limits ML20148Q1041997-06-30030 June 1997 Proposed Tech Specs,Revising & Clarifying Requirements for CR Emergency & Penetration Room Filtration Sys,Required Number of Radiation Monitoring Instrumentation Channels & Deleting Containment Purge Exhaust Filter Spec ML20148R7521997-06-30030 June 1997 Proposed Tech Specs,Incorporating Requirements Necessary to Change Basis for Prevention of Criticality in Fuel Storage Pool.Change Eliminates Credit for Boraflex as Neutron Absorbing Matl in Fuel Storage Pool Criticality Analysis ML20148K7501997-06-13013 June 1997 Proposed Tech Specs Changing TS 3/4.9.13, Storage Pool Ventilation (Fuel Movement) ML20140A3931997-05-28028 May 1997 Proposed Tech Specs,Clarifying That Testing of Each Shared EDG to Comply W/Sr 4.8.1.1.2.e Is Only Required Once Per Five Years on a Per EDG Basis,Not on Per Unit Basis ML20148F2381997-05-27027 May 1997 Corrected TS Bases Page B 3/4 1-3 That Incorporates Changes from COLR & Elimination of Containment Spary Additive Sys TS Amends ML20148E5921997-05-27027 May 1997 Proposed Tech Specs Pages Revising Applicable Modes for Source Range Nuclear Instrumentation & Providing Allowances for an Exception to Requirements for State of Power Supplies for RHR Discharge to Charging Pump Suction Valves ML20138B9251997-04-23023 April 1997 Proposed Tech Specs,Revising TS Pages to Include Footnote Concerning Filter Pressure Drop Testing & Mechanical Heater Testing ML20198T4921997-03-31031 March 1997 Small Bobbin Probe (0.640) Qualification Test Rept ML20137H6091997-03-25025 March 1997 Proposed Tech Specs Re Primary Coolant Specific Activity ML20136F8231997-03-0707 March 1997 Proposed Tech Specs 3/4.6.3 Re Containment Isolation Valves Surveillance Requirements ML20135C4941997-02-24024 February 1997 Proposed Tech Specs Re SG Tube Laser Welded Sleeves.Voltage Based Alternate Repair Criteria Is Approved Prior to Laser Welded Sleeve Amend ML20135C6731997-02-24024 February 1997 Proposed Tech Specs Re Surveillance Requirements of Control Room,Penetration Room & Containment Purge Filtration Systems ML20135C8641997-02-14014 February 1997 Proposed Tech Specs Revising Specified Max Power Level & Definition of Rated Thermal Power 1999-06-30
[Table view] |
Text
r- , .
PLANT SYSTEMS 3/4.7.9 SNUBBERS LIMITING CONDITION FOR OPERATION
=====================================================================
3.7.9 All snubbers shall be OPERABLE. The only snubbers excluded from this requirement are those installed on nonsafety-related systems and then only if their failure or the failure of the system on which they are installed would have no adverse ef fect on any safety-related system.
APPLICABILITY: MODES 1, 2, 3 and 4. (MODES S and 6 for snubbers located on systems required OPERABLE in those MODES).
ACTION:
With one or more snubbers inoperable, within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> replace or restore the inoperable snubber (s) to OPERABLE status and perform an engineering evaluation per Specification 4.7.9.c on the supported component or declare the supported system inoperable and follow the appropriate ACTION statement for that system.
SURVEILLANCE REQUIREMENTS
========= =====_======== --- =======----- =_
4.7.9 Each snubber shall be demonstrated OPERABLE by performance of the following augmented inservice inspection program and the requirements of Specification 4.0.5.
- a. Visual Inspections The first inservice visual inspection of snubbers shall be performed after four months but within 10 months of POWER OPERATION and shall include all snubbers within the scope of Specification 3.7.9. If less than two (2) snubbers are found inoperable during the first inservice visual inspection, the second inservice visual inspection shall be performed 12 months + 25% from the date of the first inspection.
Otherwise, subsequent visual inspections shall be performed in accordance with the following schedule: **
No. of Inoperable Snubbers Subsequent Visual per Inspection Period Inspection Period *#
0 18 months + 25%
1 12 months T 25%
2 6 months T 25%
3, 4 124 days T 25%
5, 6, 7 62 days T 25%
8 or more 31 days _T 25%
The snubbers may be categorized into two groups: Those accessible and those inaccessible during reactor operation. Each group may be inspected independently in accordance with the above schedule.
- The inspection interval shall not be lengthened more than one step at a time.
- The provisions of Specification 4.0.2 are not applicable.
- This is a one-time Technical Specification change until startup from the eighth refueling outage. Table 4.7-3 should be utilized during this interval to determine the subsequent visual inspection period.
FARLEY - UNIT 1 3/4 7-20 AMENDMENT NO.
8703020389 870225 PDR ADOCK 05000348 P pon
TABLE 4.7-3 Snubber Visual Inspection Schedule Current Visual Number of Inoperable Next Visual Inspection Period
18 Months + 25%
0, 1, 2 18 Months + 25%
3 12 Months T 25%
4 6 Months T 25%
5,6 4 Months T 25%
7 2 Months T 25%
8 or more 1 Month 125%
12 Months + 25%
0, 1 18 Months + 25%
2, 3 12 Months T 25%
4 6 Months T 25%
5 4 Months T 25%
6, 7 2 Months T 25%
8 or more 1 Month _T 25%
6 Months + 25%
0 12 Months + 25%
1 6 Months T 25%
2 4 Months [25%
3, 4 2 Months + 25%
5 or more 1 Month 1 25%
4 Months + 25%
0 6 Months + 25%
1 4 Months T 25%
2 2 Months T 25%
3 or more 1 Month 1 25%
2 Months + 25%
0 4 Months + 25%
1 2 Months T 25%
2 or more 1 Month _T 25%
1 Month -+ 25% 0 2 Months + 25%
1 or more 1 Month _T 25%
- The provisions of Specification 4.0.2 are not applicable.
- Earlier visual inspections than required may be utilized. If this option is chosen, the criteria for determining the next visual inspection period shall be the criteria associated with the earlier visual inspection period selected.
FARLEY - UNIT 1 3/4 7-20a AMENDMENT N0.
PLANT SYSTEMS 3/4.7.9 SNUBBERS
-LIMITING CONDITION FOR OPERATION
===========================-----------======== - - -================
3.7.9 All snubbers shall be OPERABLE. The only snubbers excluded from this requirement are those installed on nonsafety-related systems and then only if their failure or the failure of the system on which they are installed would have no adverse effect on any safety-related system.
APPLICABILITY: MODES 1, 2, 3 and 4. (MODES S and 6 for snubbers located on systems required UPERABLE in those MODES).
ACTION:
With one or more snubbers inoperable, within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> replace or restore the inoperable snubber (s) to OPERABLE status and perform an engineering evaluation per Specification 4.7.9.c on the supported component or declare the supported system inoperable and follow the appropriate ACTION statement for that system.
SURVEILLANCE REQUIREMENTS
===========================____=======--
4.7.9 Each snubber shall be demonstrated OPERABLE by performance of the following augmented inservice inspection program and the requirements of Specification 4.0.5.
- a. Visual Inspections The first inservice visual inspection of snubbers shall be performed after four months but within 10 months of POWER OPERATION and shall include all snubbers within the scope of Specification 3.7.9. If less than two (2) snubbers are found inoperable during the first inservice visual inspection, the second inservice visual inspection shall be performed 12 months + 25 % from the date of the first inspection.
Otherwise, subsequent visual inspections shall be performed in accordance with the following schedule: **
No. of Inoperable Snubbers Subsequent Visual per Inspection Period Inspection Period *#
0 18 months j; 25%
1 12 months + 25%
2 6 months T 25%
3, 4 124 days i25%
5,6,7 62 days j;25%
8 or more 31 days j;25%
The snubbers may be categorized into two groups: Those accessible and those inaccessible during reactor operation. Each group may be inspected independently in accordance with the above schedule.
- The inspection interval shall not be lengthened more than one step at a time.
- The provisions of Specification 4.0.2 are not applicable.
- This is a one-time Technical Specification change until startup from the fifth refueling outage. Table 4.7-3 should be utilized during this interval to determine the subsequent visual inspection period.
FARLEY - UNIT 2 3/4 7-20 AMENDMENT NO.
( c. - '
TABLE 4.7-3 Snubber Visual Inspection Schedule Current Visual Number of Inoperable Next Visual Inspection Period
18 Months + 25%
0,1, 2 18 Months + 25%
3 12 Months T 25%
4 6 Months T 25%
5,6 4 Months T 25%
7 2 Months T 25%
8 or more 1 Month _T 25%
12 Months + 25%
0, 1 18 Months + 25%
2, 3 12 Months T 25%
4 6 Months T 25%
5 4 Months T 25%
6, 7 2 Months T 25%
8 or more 1 Month 125%
6 Months + 25%
0 12 Months + 25%
1 6 Months T 25%
2 4 Months T 25%
3, 4 2 Months T 25%
5 or more 1 Month 125%
4 Months + 25%
0 6 Months + 25%
1 4 Months T 25%
2 2 Months T 25%
3 or more 1 Month 125%
2 Months + 25%
0 4 Months + 25%
1 2 Months i M 2 or more 1 Month 1.'5f.
i I
1 Month -+ 25% 0 2 Months + 25%
1 or more 1 Month 125%
t
- The provisions of Specification 4.0.2 are not applicable.
- Earlier visual inspections than required may be utilized. If this option is chosen, the criteria for determining the next visual inspection period shall be the criteria associated with the earlier visual inspection period selected.
l FARLEY - UNIT 2 3/4 7-20a AMENDMENT N0.
l
'