ML20211P526
ML20211P526 | |
Person / Time | |
---|---|
Site: | Byron, Braidwood, Zion File:ZionSolutions icon.png |
Issue date: | 10/15/1997 |
From: | Sepp H WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
To: | Collins S NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
Shared Package | |
ML20211P520 | List: |
References | |
CAW-97-1175, NUDOCS 9710200223 | |
Download: ML20211P526 (1) | |
Category:CORRESPONDENCE-LETTERS
MONTHYEARML20217P6171999-10-21021 October 1999
[Table view]Forwards non-proprietary & Proprietary Versions of HI-982083, Licensing Rept for Byron & Braidwood Nuclear Stations. Proprietary Rept Withheld,Per 10CFR2.790(b)(4) ML20217M2871999-10-21021 October 1999 Refers to Rev 5 Submitted in May 1999 for Portions of Byron Nuclear Power Station Generating Stations Emergency Plan Site Annex.Informs That NRC Approval Not Required Based on Determination That Plan Effectiveness Not Decreased ML20217M4361999-10-19019 October 1999 Forwards Rev 46 to Braidwood Station Security Plan, IAW 10CFR50.4(b)(4).Description of Changes,Listed.Encl Withheld Per 10CFR73.21 ML20217J4411999-10-18018 October 1999 Forwards Exemption from Certain Requirements of 10CFR73.55 for Zion Nuclear Power Station,Units 1 & 2 in Response to Application Dtd 990730,to Allow Util to Discontinue Specific Aspects of Security Plan & SER ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20217G9791999-10-14014 October 1999 Forwards SE Accepting Relief Requests to Rev 5 of First 10-year Interval Inservice Insp Program for Plant,Units 1 & 2 ML20217F7891999-10-0808 October 1999 Forwards Insp Repts 50-454/99-12 & 50-455/99-12 on 990803- 0916.One Violation Occurred Being Treated as NCV ML20217B6351999-10-0505 October 1999 Forwards for Info,Final Accident Sequence Precursor Analysis of Operational Event at Byron Station,Unit 1,reported in LER 454/98-018 & NRC Responses to Util Specific Comments Provided in ML20212L1791999-10-0505 October 1999 Informs That as Result of Staff Review of Util Responses to GL 92-01,rev 1,suppl 1 & Suppl 1 Rai,Staff Revised Info in Rvid & Is Releasing Rvid Version 2 ML20217B2991999-10-0101 October 1999 Forwards Insp Repts 50-454/99-16 & 50-455/99-16 on 990907-10.No Violations Noted.Water Chemisty Program Was Well Implemented,Resulted in Effective Control of Plant Water Chemistry ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr ML20212J6751999-09-30030 September 1999 Forwards Replacement Pages Eight Through Eleven of Insp Repts 50-454/99-15 & 50-455/99-15.Several Inaccuracies with Docket Numbers & Tracking Numbers Occurred in Repts ML20217A5821999-09-29029 September 1999 Advises of NRC Plans for Future Insp Activities at Facility for Licensee to Have Opportunity to Prepare for Insps & to Provide NRC with Feedback on Any Planned Insps Which May Conflict with Plant Activities ML20217A9311999-09-29029 September 1999 Informs That NRC 6-month Review of Braidwood Identified That Performance in Maint Area Warranted Increased NRC Attention. Addl Insps Beyond Core Insp Program Will Be Conducted Over Next 6 Months to Better Understand Causes of Problem ML20216G9541999-09-27027 September 1999 Forwards Environ Assessment & Finding of No Significant Impact Re 990730 Application for Exemption.Exemption Would Allow Zion Nuclear Power Station to Discontinue Specific Aspects of Security Plan ML20216H4301999-09-23023 September 1999 Informs That Arrangements Made for Administration of Licensing re-take Exams at Braidwood Generating Station for Week of 991108 ML20216F7441999-09-17017 September 1999 Forwards Insp Repts 50-456/99-13 & 50-457/99-13 on 990706-0824.Three Violations Noted & Being Treated as Ncvs. Insp Focused on C/As & Activities Addressing Technical Concerns Identified During Design Insp Completed on 980424 ML20216F8051999-09-17017 September 1999 Forwards Insp Rept 50-454/99-14 & 50-455/99-14 on 990823-27. Security Program Was Effectively Implemented in Areas Inspected.No Violations Were Identified A99025, Forwards Response to NRC 990820 RAI Re Proposed Defueled TS for Zion Station1999-09-15015 September 1999 Forwards Response to NRC 990820 RAI Re Proposed Defueled TS for Zion Station ML20212A6991999-09-10010 September 1999 Forwards SE Accepting Licensee Second 10-year Interval ISI Program Request for Relief 12R-07 for Plant,Units 1 & 2 ML20211Q9011999-09-0808 September 1999 Advises That Us Postal Service Mailing Address Has Changed for Braidwood Station.New Address Listed ML20211P1841999-09-0808 September 1999 Forwards Insp Repts 50-454/99-15 & 50-455/99-15 on 990824- 26.No Violations Noted.Objective of Insp to Determine Whether Byron Nuclear Generating Station Emergency Plan Adequate & If Emergency Plan Properly Implemented ML20211Q6821999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Byron Operator Licesne Applicants During Wks of 000619 & 26.Validation of Exam Will Occur at Station During Wk of 000529 ML20211Q6611999-09-0606 September 1999 Informs That NRC Tentatively Scheduled Initial Licensing Exam for Braidwood Operator License Applicants During Wk of 010115 & 22.Validation of Exam Will Occur at Station During Wk of 001218 ML20211P1901999-09-0303 September 1999 Forwards Insp Repts 50-456/99-12 & 50-457/99-12 on 990707-0816.No Violations Noted.Insp Generally Characterized by safety-conscious Operations,Sound Engineering & Maint Practices & Careful Radiological Work Controls ML20211N5151999-09-0303 September 1999 Ack Receipt of Re Safety Culture & Overtime Practices at Byron Nuclear Power Station.Copy of Recent Ltr from NRC to Commonwealth Edison Re Overtime Practices & Safety Culture Being Provided ML20211K1081999-09-0202 September 1999 Responds to Request for Addl Info to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity, for Braidwood,Units 1 & 2 & Byron,Unit 2 ML20211M1371999-09-0202 September 1999 Discusses 990527 Meeting with Ceco & Byron Station Mgt Re Overtime Practices & Conduciveness of Work Environ to Raising Safety Concerns at Byron Station.Insp Rept Assigned for NRC Tracking Purposes.No Insp Rept Encl ML20211P1761999-09-0202 September 1999 Discusses Licensee Aug 1998 Rev 3K to Portions of Braidwood Nuclear Power Station Generating Stations Emergency Plan Site Annex Submitted Under Provisions of 10CFR50.54(q). NRC Approval Not Required ML20211L1551999-09-0101 September 1999 Forwards Insp Repts 50-295/99-03 & 50-304/99-03 on 990608-0812 at Zion 1 & 2 Reactor Facilities.No Violations Noted.Activities in Areas of Facility Mgt & Control, Decommissioning Support,Sf & Radiological Safety Examined ML20211J9701999-08-31031 August 1999 Discusses Request for Approval of Defueled Station Emergency Plan & Exemption from Certain Requirements of 10CFR50.47, Emergency Plans, for Plant,Units 1 & 2.Exemption & Safety Evaluation Encl ML20211J0311999-08-30030 August 1999 Agrees with Content in NRC 990810 Memo Re Plant Spent Fuel Pool.Memo Contains Accurate Summation of Info That Util Communicated to NRC During 990713 Telcon ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20211G8191999-08-26026 August 1999 Forwards Amend 6 to Fire Protection Rept for Zion Nuclear Power Station,Units 1 & 2, IAW 10CFR50.71(e).Attachment 1 Contains Summary of Changes ML20211G4021999-08-25025 August 1999 Forwards Insp Repts 50-454/99-10 & 50-455/99-10 on 990622-0802.No Violations Noted ML20211B8691999-08-20020 August 1999 Forwards Insp Repts 50-254/99-10,50-265/99-10,50-454/99-09, 50-455/99-09,50-456/99-10 & 50-457/99-10 on 990628-0721. Action Plans Developed to Address Configuration Control Weaknesses Not Totally Effective as Listed ML20211F5971999-08-20020 August 1999 Submits Request for Addl Info Re Proposed Defueled TSs for Plant,Per NRC Bulletin 94-001, Potential Fuel Pool Draindown Caused by Inadequate Maint Practices at Dresden Unit 1 ML20211C7401999-08-19019 August 1999 Informs That NRC Plans to Stop Using Office Complex at Zion Nuclear Generating Station Which Commonwealth Edison Provided for NRC Resident Inspectors Under 10CFR50.70(b)(1). NRC-owned Equipment to Be Moved on or About 991001 ML20211J4421999-08-13013 August 1999 Forwards, EA & Finding of No Significant Impact Re Application for Exemption ,as Suppl by 990708 & 19 Ltrs.Proposed Exemption Would Modify Emergency Response Plan Requirements as Listed BW990053, Forwards post-outage Summary Rept for ISI Examinations Conducted During Seventh Refueling Outage of Braidwood Station,Unit 21999-08-13013 August 1999 Forwards post-outage Summary Rept for ISI Examinations Conducted During Seventh Refueling Outage of Braidwood Station,Unit 2 BW990052, Informs That RW Clay,License OP-31044,no Longer Requires Operator License at Braidwood Station1999-08-12012 August 1999 Informs That RW Clay,License OP-31044,no Longer Requires Operator License at Braidwood Station 05000454/LER-1998-008, Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER1999-08-12012 August 1999 Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes ML20210U8031999-08-0404 August 1999 Forwards SER Granting Licensee Relief Requests VR-1,VR-3 & Portion of VR-2 Pursuant to 10CFR50.55a(a)(3)(ii).Relief Request VR-4 Does Not Require Explicit NRC Approval for Second 10-year Inservice Testing Program BW990049, Informs NRC of Plans to Demonstrate Compliance with 10CFR50.46 Requirements for Fuel Predicted to Experience Fuel Pellet to Rod Cladding Gap Reopening,During Current Cycle1999-08-0404 August 1999 Informs NRC of Plans to Demonstrate Compliance with 10CFR50.46 Requirements for Fuel Predicted to Experience Fuel Pellet to Rod Cladding Gap Reopening,During Current Cycle ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210K0771999-07-30030 July 1999 Submits 30-day Rept Re Discovery of ECCS Evaluation Model Error for Byron & Braidwood Stations,As Required by 10CFR50.46 ML20210K9761999-07-30030 July 1999 Forwards SE Accepting Licensee 60-day Response to GL 96-05, Periodic Verification of Design Basis Capability of Safety-Related Movs, for Plant ML20210J0861999-07-30030 July 1999 Requests NRC Approval of Exemption from Certain Requirements of 10CFR73, Physical Protection of Plants & Matls, by 990921.Exemption Is Needed to Support Scheduled 991001 Implementation of Plant Sf Ni.Encl Withheld,Per 10CFR73.21 ML20210G6291999-07-29029 July 1999 Forwards Insp Repts 50-456/99-11 & 50-457/99-11 on 990525-0706.Two Violations Noted & Being Treated as NCV, Consistent with App C of Enforcement Policy 1999-09-08 Category:INCOMING CORRESPONDENCE MONTHYEARML20217P6171999-10-21021 October 1999
[Table view]Forwards non-proprietary & Proprietary Versions of HI-982083, Licensing Rept for Byron & Braidwood Nuclear Stations. Proprietary Rept Withheld,Per 10CFR2.790(b)(4) ML20217M4361999-10-19019 October 1999 Forwards Rev 46 to Braidwood Station Security Plan, IAW 10CFR50.4(b)(4).Description of Changes,Listed.Encl Withheld Per 10CFR73.21 ML20217H4661999-10-18018 October 1999 Forwards Changes to EPIPs IAW 10CFR50.54(q) & 10CFR50,App E, Section V.Details of Changes Encl ML20216J8241999-09-30030 September 1999 Notifies of Removal of NRC Headquarters & Region III Offices from Controlled Copy Distribution of Certain CE Documents. Specific Documents,Associated Controlled Copy Numbers & NRC Location Affected Are Shown on Attachment to Ltr A99025, Forwards Response to NRC 990820 RAI Re Proposed Defueled TS for Zion Station1999-09-15015 September 1999 Forwards Response to NRC 990820 RAI Re Proposed Defueled TS for Zion Station ML20211Q9011999-09-0808 September 1999 Advises That Us Postal Service Mailing Address Has Changed for Braidwood Station.New Address Listed ML20211J0311999-08-30030 August 1999 Agrees with Content in NRC 990810 Memo Re Plant Spent Fuel Pool.Memo Contains Accurate Summation of Info That Util Communicated to NRC During 990713 Telcon ML20211G1221999-08-27027 August 1999 Forwards fitness-for-duty Program Performance Data for Each of Comm Ed Nuclear Power Stations & Corporate Support Employees within Scope of Rule for six-month Period Ending 990630,IAW 10CFR26.71(d) ML20211G8191999-08-26026 August 1999 Forwards Amend 6 to Fire Protection Rept for Zion Nuclear Power Station,Units 1 & 2, IAW 10CFR50.71(e).Attachment 1 Contains Summary of Changes BW990053, Forwards post-outage Summary Rept for ISI Examinations Conducted During Seventh Refueling Outage of Braidwood Station,Unit 21999-08-13013 August 1999 Forwards post-outage Summary Rept for ISI Examinations Conducted During Seventh Refueling Outage of Braidwood Station,Unit 2 05000454/LER-1998-008, Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER1999-08-12012 August 1999 Informs That Licensee Determined That Suppl Rept to LER 98-008 Is Not Warranted.No Addl Info Was Generated Following Completion of Root Cause Investigation of Following Completion of Corrective Actions Stated in Original LER BW990052, Informs That RW Clay,License OP-31044,no Longer Requires Operator License at Braidwood Station1999-08-12012 August 1999 Informs That RW Clay,License OP-31044,no Longer Requires Operator License at Braidwood Station ML20210N5651999-08-0606 August 1999 Forwards Rev 8 to Nuclear Generating Stations Emergency Plan, for Plants.With Summary of Changes BW990049, Informs NRC of Plans to Demonstrate Compliance with 10CFR50.46 Requirements for Fuel Predicted to Experience Fuel Pellet to Rod Cladding Gap Reopening,During Current Cycle1999-08-0404 August 1999 Informs NRC of Plans to Demonstrate Compliance with 10CFR50.46 Requirements for Fuel Predicted to Experience Fuel Pellet to Rod Cladding Gap Reopening,During Current Cycle ML20210M9131999-08-0202 August 1999 Forwards Response to NRC AL 99-02, Operating Reactor Licensing Action Estimates, for Fys 2000 & 2001 for Comed ML20210K0771999-07-30030 July 1999 Submits 30-day Rept Re Discovery of ECCS Evaluation Model Error for Byron & Braidwood Stations,As Required by 10CFR50.46 ML20210J0861999-07-30030 July 1999 Requests NRC Approval of Exemption from Certain Requirements of 10CFR73, Physical Protection of Plants & Matls, by 990921.Exemption Is Needed to Support Scheduled 991001 Implementation of Plant Sf Ni.Encl Withheld,Per 10CFR73.21 ML20210J8951999-07-29029 July 1999 Submits Other Actions,As Described,To Be Taken for Valves to Resolve Potential Pressure Locking Concerns,In Light of Extended Period for Valve Bonnet Natural Depressurization,In Response to GL 95-07, Pressure Locking & Thermal.. BW990045, Forwards Errata to 1998 Radioactive Effluent Release Rept. Info Has Been Corrected & Revised Spreadsheets Included in Attachment to Ltr1999-07-28028 July 1999 Forwards Errata to 1998 Radioactive Effluent Release Rept. Info Has Been Corrected & Revised Spreadsheets Included in Attachment to Ltr ML20210E2151999-07-23023 July 1999 Forwards Byron Unit 1 B1R09 ISI Summary Rept Spring 1999 Outage,980309-990424, in Compliance with Requirements of Article IWA-6000, Records & Repts of Section XI of ASME & P&PV,1989 Edition ML20216D3781999-07-21021 July 1999 Forwards Revised NFM9900022, Braidwood Unit 2 Cycle 8 COLR on ITS Format & W(Z) Function, to Account for Error That W Discovered in Computer Code Used to Calculate PCT During LBLOCA ML20216D7061999-07-19019 July 1999 Forwards Rev 45 to Braidwood Station Security Plan,Iaw 10CFR50.4(b)(4).Plan Includes Listed Changes.Rev Withheld, Per 10CFR73.21 ML20210C2561999-07-19019 July 1999 Forwards Rev 1 to Calculation 22S-B-110X-0068, Determination of Heat Load for Assemblies F50D & Z33A, as Replacement Pages to Rev 0.Calculation Submitted Re Request for Approval of Proposed Plant Defueled Station EP ML20209H2991999-07-16016 July 1999 Withdraws 980529 LAR to Credit Automatic PORV Operation for Mitigation of Inadvertent Safety Injection at Power Accident.Response to NRC 990513 RAI Re LAR Encl BW990042, Forwards Braidwood Station,Unit 1 Post Accident Monitoring Rept for Reactor Vessel Level Indication Sys (Rvlis),Due to Facility Train B RVLIS Being Restored to Operable Status After 7-day Completion Time,Per TS 3.3.3 & 5.6.71999-07-16016 July 1999 Forwards Braidwood Station,Unit 1 Post Accident Monitoring Rept for Reactor Vessel Level Indication Sys (Rvlis),Due to Facility Train B RVLIS Being Restored to Operable Status After 7-day Completion Time,Per TS 3.3.3 & 5.6.7 BW990040, Forwards Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2.Since Issuance of Rept,It Was Determined That Rt That Occurred on Unit 2 During Startup Was Inadvertently Omitted1999-07-15015 July 1999 Forwards Revised Monthly Operating Repts for May 1999 for Braidwood Station,Units 1 & 2.Since Issuance of Rept,It Was Determined That Rt That Occurred on Unit 2 During Startup Was Inadvertently Omitted ML20207H7501999-07-12012 July 1999 Forwards Revised Pressure Temp Limits Rept, for Byron Station,Units 1 & 2.Revised Pressurized Thermal Shock Evaluations,Surveillance Capsule Rept & Credibility Repts, Also Encl ML20209G1391999-07-0909 July 1999 Forwards Results of SG Tube Insps Performed During Byron Station,Unit 1,Cycle 9 Refueling Outage within 12 Months Following Completion of Insps ML20209E7391999-07-0808 July 1999 Forwards Proposed Revised Znps Defueled Station Emergency Plan & Supporting Calculations.Revs to Proposed Defueled Station Emergency Plan Have Been Reviewed & Approved IAW Comed QA Program ML20196J9061999-07-0101 July 1999 Provides Evidence That Util Maintains Guarantee of Payment of Deferred Premiums in Amount of $10 Million for Each of Thirteen Reactors,Per 10CFR140.21 ML20196J9131999-07-0101 July 1999 Submits Status of Nuclear Property Insurance Currently Maintained for Braidwood,Byron,Dresden,Lasalle County,Quad Cities & Zion Nuclear Power Stations,Per 10CFR50.54(w)(3) ML20209B8241999-06-30030 June 1999 Forwards Five 3.5 Inch Computer Diskettes Containing Revised Annual Dose Repts for 1994 Through 1998 for Individuals Receiving Neutron Dose Not Previously Included in Reported Total Effective Dose Equivalent Values.Without Diskettes ML20196G2161999-06-25025 June 1999 Forwards for NRC Region III Emergency Preparedness Inspector,Two Copies of Comed Emergency Preparedness Exercise Manual for 1999 Byron Station Annual Exercise. Exercise Is Scheduled for 990825.Without Encls ML20209D4861999-06-17017 June 1999 Informs That R Heinen,License OP-30953-1 & a Snow,License SOP-30212-3,no Longer Require License at Byron Station 05000457/LER-1998-003, Forwards LER 98-003-00 Re Unit 2 Reactor Trip.Actions & Associated Action Tracking Number That Braidwood Station Is Committed to Implement in Response to LER Described Below1999-06-16016 June 1999 Forwards LER 98-003-00 Re Unit 2 Reactor Trip.Actions & Associated Action Tracking Number That Braidwood Station Is Committed to Implement in Response to LER Described Below 05000456/LER-1998-004, Forwards LER 98-004-01,IAW 10CFR50.73(a)(2)(i)(B). LER 98-004 Included Commitment to Transmit Supplemental Rept by 990628,due to on-going Evaluations1999-06-16016 June 1999 Forwards LER 98-004-01,IAW 10CFR50.73(a)(2)(i)(B). LER 98-004 Included Commitment to Transmit Supplemental Rept by 990628,due to on-going Evaluations ML20195H9391999-06-15015 June 1999 Forwards Revised Monthly Operating Rept for Apr 1999 for Zion Nuclear Power Station,Units 1 & 2.Data Was Revised to Reflect Change in Daylight Savings Time 05000456/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B). Description of Action & Associated Action Request Number That Braidwood Station Is Committed to Implement Is Response to LER Is Listed1999-06-15015 June 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B). Description of Action & Associated Action Request Number That Braidwood Station Is Committed to Implement Is Response to LER Is Listed BW990028, Forwards Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function, IAW TS 5.6.51999-06-10010 June 1999 Forwards Braidwood Unit 2 Cycle 8 COLR in ITS Format & W(Z) Function, IAW TS 5.6.5 05000454/LER-1999-002, Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i)(b).There Are Two Actions Remaining to Address Cause of Event.Both Actions Are Listed1999-06-0808 June 1999 Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(i)(b).There Are Two Actions Remaining to Address Cause of Event.Both Actions Are Listed ML20195E3451999-06-0707 June 1999 Forwards 3.5 Inch Computer Diskette Containing Revised File Format for Annual Dose Rept for 1998,per 990520 Telcon Request from Nrc.Each Station Data Is Preceded by Header Record,Which Provides Info Necessary to Identify Data ML20195D6351999-06-0404 June 1999 Notifies NRC of Actions That Has Been Taken in Accordance with 10CFR26, Fitness for Duty Programs ML20211M1611999-05-28028 May 1999 Discusses 990527 Meeting with Comed Re Safety Culture & Overtime Control at Byron Nuclear Plant from Videoconference Location at NRC Headquarters.Requests That Aggressive Actions Be Taken to Ensure That Comed Meets Expectations A99018, Responds to NRC Re Violations Noted in IR 3-98- 017.Corrective Actions:Three Security Guards Unescorted Access to All Comm Ed Nuclear Stations Put on Temporary Hold1999-05-27027 May 1999 Responds to NRC Re Violations Noted in IR 3-98- 017.Corrective Actions:Three Security Guards Unescorted Access to All Comm Ed Nuclear Stations Put on Temporary Hold ML20207D5261999-05-26026 May 1999 Forwards Response to NRC 990318 RAI Concerning Alleged Chilling Effect at Byron Station.Attachment Contains Responses to NRC 12 Questions ML20211M1781999-05-25025 May 1999 Summarizes Concerns with Chilling Effect & Overtime Abuses at Commonwealth Edison,Byron Station.Request That Ltr Be Made Part of Permanent Record of 990527 Meeting ML20195C7911999-05-25025 May 1999 Forwards Revised COLR for Byron Unit 2,IAW 10CFR50.59.Rev Accounts for Planned Increase of Reactor Coolant Full Power Average Operating Temp from 581 F to 583 F 05000454/LER-1999-001, Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B).Required Actions to Address Causes of Event Listed1999-05-21021 May 1999 Forwards LER 99-001-00,IAW 10CFR50.73(a)(2)(i)(B).Required Actions to Address Causes of Event Listed 05000457/LER-1999-002, Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(iv).Commitments Made by Util Are Listed1999-05-21021 May 1999 Forwards LER 99-002-00,IAW 10CFR50.73(a)(2)(iv).Commitments Made by Util Are Listed ML20195B2301999-05-19019 May 1999 Requests Approval of Proposed Changes to QA Topical Rept CE-1-A,rev 66a.Attachment a Describes Changes,Reason for Change & Basis for Concluding That Revised QAP Incorporating Proposed Changes Continues to Satisfy 10CFR50AppB 1999-09-08 |
Text
.___-_- - __ - _ ____ _ - - - - _ -__
~ ~
Westinghouse EnergySystems Nuclear Sef vices Dmsion Electric Corporation wm -
Pittsburgh Pennsytvania 15230 0355 October 15,1997 CAW-97-1175 Document Control Desk -
U.S. Nuclear Regulatory Commission Washington, DC 20555 Attention: Mr. Samuel J. Collins APPLICATION FOR WITHHOLDING PROPAIETARY INFORMATION FROM PUBLIC DISCLOSURE
Subject:
- WCAP-12045-RI, " Background and Technical Basis: Handbook on Flaw Evaluation for the Zion, Byron and Braidwood Units 1 and 2 Main Coolant System and Componems,"
December 1991 (Proprietary)
Dear Mr. Collins:
He proprietary information for which withholding is being requested in the above-referenecd report is L further identified in Affidavit CAW-97-1175 signed by the owner of the proprietary information, Westinghouse Electric Corporation. De affidavit, which accompanies this letter, sets forth the basis on which the information may be withheld from public disclosure by the Commission and addresses with specificity the considerations listed in paragraph (b)(4) of 10 CFR Section 2.790 of the Commission's regulations.
Accordingly, this letter authorizes the utilization of the accompanying Affidavit by Commonwealth Edison Electric Company.
Correspondence with respect to the proprietary aspects of the application for withholding or the Westinghouse affidavit should reference this letter, CAW-97-Il75, and should be addressed to the undersigned.
Very truly yours, H. A. Sepp, Manager Regulatory and Licensing Engineering Enclosures cc: Kevin Boh:er/NRC (12H5) 9710200223 971015 E PDR ADOCK 05000457 G PDR ,