Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20211Q881 + (02:06:55, 6 December 2024)
- ML20211Q880 + (02:06:55, 6 December 2024)
- 05000354/LER-1987-009, :on 870124,cooling Tower Blowdown RMS Sample Pump Froze.Sampling of Radioactive Liquid Effluent Not Initiated Until Tech Spec Action Statement Entered on 870126.Caused by Personnel Error + (02:06:57, 6 December 2024)
- ML20211Q877 + (02:06:58, 6 December 2024)
- ML20211Q878 + (02:06:58, 6 December 2024)
- ML20211Q876 + (02:06:59, 6 December 2024)
- ML20211Q874 + (02:06:59, 6 December 2024)
- ML20211Q873 + (02:07:00, 6 December 2024)
- ML20211Q870 + (02:07:01, 6 December 2024)
- 05000293/LER-1999-008-02, :on 990805,automatic Scram Occurred While at 100% Power Due to Automatic Turbine Trip.Caused by Malfunction of Moisture Separator Drain Tank a Drain Valve Controller.Level Controllers Replaced.With + (02:07:03, 6 December 2024)
- 2CAN099905, Informs That Jk Caery,License OP-42589 & as Bates,License OP-42506,no Longer Need to Maintain Operating License at Ano,Unit 2.Withdrawal of Licenses Is Requested + (02:07:04, 6 December 2024)
- ML20211Q867 + (02:07:04, 6 December 2024)
- GO2-99-168, Forwards Rev 40 to Physical Security Plan.Rev Withheld,Per 10CFR2.790(a)(3) + (02:07:16, 6 December 2024)
- ML20211Q861 + (02:07:17, 6 December 2024)
- ML20211Q863 + (02:07:17, 6 December 2024)
- ML20211Q860 + (02:07:18, 6 December 2024)
- BSEP-99-0151, Notifies NRC That Unit 1 Digtial FW Control Sys Upgrade Was Completed on 990831 During Plant Sd.Action Completes Y2K Remediation Activities for BSEP + (02:07:20, 6 December 2024)
- ML20211Q859 + (02:07:20, 6 December 2024)
- ML20211Q856 + (02:07:21, 6 December 2024)
- ML20211Q854 + (02:07:22, 6 December 2024)
- ML20211Q855 + (02:07:22, 6 December 2024)
- ML20211Q852 + (02:07:23, 6 December 2024)
- ML20211Q853 + (02:07:23, 6 December 2024)
- ML20211Q851 + (02:07:24, 6 December 2024)
- ML20211Q850 + (02:07:24, 6 December 2024)
- ML20211Q848 + (02:07:25, 6 December 2024)
- ML20211Q847 + (02:07:26, 6 December 2024)
- 05000382/LER-1999-012-01, :on 990812,potential Operation with Both Control Room Normal Outside Air Intakes Valves Inoperable Occurred.Cause for Event Was Indeterminate.Seat Leakage Requirements Calculated.With + (02:07:31, 6 December 2024)
- ML20211Q844 + (02:07:32, 6 December 2024)
- ML20211Q843 + (02:07:32, 6 December 2024)
- 05000528/LER-1986-039, :on 860525 & 0603,accumulators B & a, Respectively Discovered Leaking Nitrogen.Caused by Personnel Error in Form of Incorrect Engineering Evaluation.Engineer Counseled + (02:07:34, 6 December 2024)
- ML20211Q837 + (02:07:35, 6 December 2024)
- ML20211Q836 + (02:07:35, 6 December 2024)
- ML20211Q835 + (02:07:36, 6 December 2024)
- ML20211Q830 + (02:07:37, 6 December 2024)
- ML20211Q832 + (02:07:37, 6 December 2024)
- ML20211Q827 + (02:07:38, 6 December 2024)
- ML20211Q826 + (02:07:39, 6 December 2024)
- ML20211Q824 + (02:07:40, 6 December 2024)
- ML20211Q825 + (02:07:40, 6 December 2024)
- ML20211Q820 + (02:07:41, 6 December 2024)
- ML20211Q819 + (02:07:41, 6 December 2024)
- ML20211Q817 + (02:07:42, 6 December 2024)
- ML20211Q818 + (02:07:42, 6 December 2024)
- IR 05000271/1997080 + (02:07:46, 6 December 2024)
- ML20211Q815 + (02:07:46, 6 December 2024)
- ML20211Q814 + (02:07:47, 6 December 2024)
- ML20211Q813 + (02:07:48, 6 December 2024)
- ML20211Q811 + (02:07:54, 6 December 2024)
- ML20211Q808 + (02:07:55, 6 December 2024)
- ML20211Q807 + (02:07:56, 6 December 2024)