- - - - _ - _ - _ _ _
pb 4
October 17, 1997 Mr. J. Brons Site Vice President Zion Generating Station Commonwealth Edison Company 101 Shiloh Boulevard Zion,IL 60099
Dear Mr. Brons:
In a telephone conversation on September 25,1997, between Mr. W. Demo end Mr. M. Bailey, arrangements were made for the administration of licensing examination 3 at the Zion Station the weeks of February 9,1998, and February 16,1998. In addition, the NRC will make an examination vanuauvo en to your facility the week of January 26,1998.
As agreed during the telephone conversation, your staff will prepare the examinations based on l
the guidelines in Interim Revision 8, of NUREG-1021, " Operator Licensing Exsmination Standards for Power Reactors." The NRC regional office will discuss with your *taff any changes that might be necessary before the examinations are administered.
l j
To meet the above schedule, it will be necessary for your staff to fumish the examination outlines by November 20,1997. The written examinations, operating tests. and the supporting reference materials identified in Attachment 2 of ES-201 wil' be due by December 28,1997.
Any delay in receiving the required examination and reference materials, or the submittal of inadequate or incomplete materials, mey cause the examinations to be rescheduled, in order to conduct the requested written examinations and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.
Appendix E of NUREG-1021 contains a number of NRC policies and guidelines inat will be in effect while the written examinations and operating tests are being administered.
To pemiit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),
and walver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at teact 30 days before the examination date, a postponement may be necessary. Signed appli::ations certifying that all training has been completed should be submitted at least 14 days before the first examination date.
9710230015 971017 PDR ADOCK 05000295 y
V PM h
l
e J. Brcns 2
October 17, 1997 This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0101, which expires on April 30,2000.
The public reporting burden for this collection is estimated to average 500 nours per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Intemet electronic mail at BJSi@NRC. GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB 10202, (3150-0101), Office of Management and Budget, Wathington, D.C. 20503.
The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.
Thank you for your cooperation in this matter. Mr. B. Demo has been advised of the policies and guidelines referenced in this letter, if you have any questions regarding the NRC's examination procedures and guidelines, please contact M. Bailey at 630-829-9750, or me at 630-829-9705.
Sincerely, d
Original Signed by Melvyn Leach Melvyn N. Leach, Chief Operator Licensing Branch Docket No. 50-295 Docket No. 50-304 See Attached Distribution DOCUMENT NAME:G:\\DRS\\ZIO10 r.
.~....
- w. e.37.0 L cm e.
c. c-.n.cev.na v. = cm OFFICE Rill:DRS lC Rlil:DRS lv NAME RBailey:Jp (W MLeach # <-
DATE 10/6 /97 10//7/97 OFFICIAL RECORD COPY
1 October 17,1%7 J. Brons 3
cc:
R. J. Manning, Executive Vice President, Generation M. Wallace, Senior Vice President, Corporate Services H. G. Stanley, Vice President, PWR Operations Liaison Officer, NOC-BOD D. A. Sager, Vice President, Generation Support D. Farrar, Nuclear Regulatory Services Manager
- 1. Johnson, Licensing Operations Manager
- Document Control Desk - Licensing R. Starkey, Plant General Manager R. Godley, Regulatory Assurance Supervisor
- Richard Hubbard Nathan Schloss, Economist, Office of the Attomey General Mayor, City of Zion State Liaison Officer State Liaison Officer, Wisconsin Chairman, Illinois Commerce Commission L, L. Schmeling, Training Department Distribution:
Docket File DRS PUBLIC IE-42 Rlli PRR OC/l.FDCB SRI, Zion R. M. Gallo, NRR/HOLB T. Vegel, DRP C. Y. Shiraki, LPM, NRR f
.f 1
1