ML20211Q819
| ML20211Q819 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 07/22/1986 |
| From: | Hukill H GENERAL PUBLIC UTILITIES CORP. |
| To: | Stolz J Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20211Q822 | List: |
| References | |
| 5211-86-2124, NUDOCS 8607280018 | |
| Download: ML20211Q819 (3) | |
Text
i GPU Nuclear Corporation i
g g{
Pest Office Box 480 Route 441 South Middletown, Pennsylvania 17057 0191 717 944 7621 TELEX 84-2386 Writer's Direct Dial Number:
July 22, 1986 5211-86-2124 Office of Nuclear Reactor Regulation Attn:
J. F. Stolz, Director PWR Projects Directorate No. 6 U.S. Nuclear Regulatory Commission Washington, DC 20555
Dear Mr. Stolz:
Three Mile Island Nuclear Station Unit 1 (TMI-1)
Operating License No. DPR-50 Docket No. 50-289 10CFR50 Appendix R Clarification of Compliance Pursuant to the meeting held on May 1 and 2,1986 between GPU Nuclear representatives and Mr. D. Kubicki, NRR PEISCB, and Mr. A. Krasopoulos, NRC Region I, regarding Appendix R to 10CFR 50 for TMI-1; GPU Nuclear hereby submits the attached responses (Attachment I) to NRC requests for additional information as presented at the subject meeting.
It is our understanding that this information is required to complete NRC's review of the TMI-l Appendix R exemption requests.
Also provided (Attachment II) is a confirmation summary of the clarifications discussed at the subject meeting.
If any additional information is required, please contact us.
Si ncerely, 8607280018 860722 I
PDR ADOCK 05000289
'd
'h D. H ill F
PDR Vice President and Director, TMI-l HDH/DJD:jh:3500f/0629A cc:
J. Thoma - USNRC R. Conte - USNRC, Region I - THI-l Site D. Kubicki - USNRC PEISCB A. Krasopoulos - USNRC, Region I Attachments l
j)oob GPU Nuclear Corporation is a subsidiary of the General Public Utilities Corporation il' 1
ATTACFNENT I The following information provides GPUN's response to each of the NRC requests for additional information as discussed at the May 1 and 2,1986 meeting, a.
GPUN will supply a list of all previous submittals which constitute the licensee's Appendix R compliance effort.
Response
The following is a listing of all GPUN submittals which in their entirety or part constitute the Appendix R compliance effort for TMI-1. Where conflicts exist, the more recent document shall govern.
GPUN Letter No.
Date Subject TLL-243 May 30, 1980 Fire Protection Response to Request for Information TLL-476 September 30, 1980 Fire Protection - RCP Lube Oil Issue LIL-142 May 15,1981 Modification to 10CFR50 Appendix R -
RCP Lube Oil Issue 5211-82-156 July 1,1982 Fire Protection - Appendix R/BTP Evaluation, G.L. 81-12 Response, SDD's (An updated description of compliance to G.L. 81-12 will be provided prior to the Appendix R audit. This description will address the as-designed covjition of the plant.)
5211-82-239 October 1,1982 Fire Protection - Associated Circuits Analysis 5211-82-281 December 2, 1982 Fire Protection - Associated Circuits Analysis, Manual Valve Operation 5211-83-095 April 8,1983 Appendix R Technical Exemptions 5211-83-324 November 30, 1983 Fire Proof Cable Development and Test Program j'
5211-84-2028 February 7,1984 Halon Explosion Suppression Systems -
5211-83-359 January 7,1984 Fire Protection Program Plan Air Intake Tunnel i
5211-84-2025 February 13, 1984 Fire Protection Program Plan 5211-84-2141 June 9,1984 Fire Proof Cable Test Program / Reports 5211-85-2011 February 11, 1985 Appendix R - Sample Exemption Request 5211-85-2177 November 7,1985 FHAR and Appendix R Section III.G Safe Shutdown Evaluation, Rev. 7 5211-85-2202 December 6, 1985 Fire Brigade Training 5211-86-2066 May 17, 1986 10CFR50 Appendix R Exemption Requests 5211 July
, 1986 10CFR50 Appendix R Clarification of Compliance l
1 L
~
b.
GPUN will submit the alternate shutdown revised system description (referenced in the licensee's letter of November 7,1985) along with all current revisions to the Fire Hazards Analysis Report and Safe Shutdown Evaluation.
~
Response
TMI-1 System Design Description (SDD) No. 614, Revision 4, entitled
" Remote Shutdown System," is attached for your review. All modifications to the TMI-l fire protection program described in this submittal will be incorporated into Revision 8 of the Fire Hazards Analysis Report and Safe Shutdown Evaluation. This revision to the TMI-l Fire Hazards Analysis Report and Safe Shutdown Evaluation will also include all other changes that have occurred since the submittal of Revision 7 on November 7,1985.