Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- BSEP-86-0996, Responds to Violations Noted in Insp Repts 50-324/85-26 & 50-325/85-26.Denies Violation Re Documenting Qualification of Rockbestos Firewall III Cables.Rockbestos Repts Sufficiently Demonstrate Interim Qualification of Cable + (01:56:42, 6 December 2024)
- ML20212A344 + (01:56:43, 6 December 2024)
- PNO-III-90-041, on 900622,female Patient Undergoing Co-60 Teletherapy Cancer Treatments to Chest (Mediastinum), Received Radiation Therapy of 178 Rads to One Side of Her Brain in Error + (01:56:44, 6 December 2024)
- PNO-II-86-045A, primary Sys Temp Dropped from 550 F to 465 F in 6 Minutes.Reactor Coolant Pumps Operated Throughout Event.Poor Human Factor Design Features Caused Operators Not to Be in Control + (01:56:44, 6 December 2024)
- 0CAN078606, Advises That Amend 4 to SAR Sent Under Separate Cover on 860718.New Process to Improve Quality & Reduce Costs Associated W/Annual SAR Update Delayed Publication of Amend 4 Figures.Changes to Amend Will Be Submitted on 860908 + (01:56:45, 6 December 2024)
- 05000255/LER-1987-001, :on 870114,plant Engineering Personnel Discovered Four Containment Penetrations Did Not Employ Redundant Isolation Logic.Caused by Architect/Engineer Error.Mod Being Performed + (01:56:49, 6 December 2024)
- ML20212A336 + (01:56:50, 6 December 2024)
- ML20212A337 + (01:56:50, 6 December 2024)
- ML20212A334 + (01:56:51, 6 December 2024)
- ML20212A331 + (01:56:52, 6 December 2024)
- ML20212A332 + (01:56:52, 6 December 2024)
- ML20212A330 + (01:56:53, 6 December 2024)
- ML20212A329 + (01:56:53, 6 December 2024)
- ML20212A327 + (01:56:54, 6 December 2024)
- ML20212A325 + (01:56:54, 6 December 2024)
- ML20212A324 + (01:56:55, 6 December 2024)
- ML20212A323 + (01:56:55, 6 December 2024)
- ML20212A322 + (01:56:56, 6 December 2024)
- ML20212A321 + (01:56:56, 6 December 2024)
- PNO-IV-90-017, on 900421,reactor Vessel Had Drifted Down Approx 6-8 Inches,While Attempting to Lower Vessel Head Onto Vessel.Licensee Determined That Reactor Vessel & Vessel Internals Not Impacted by Event + (01:56:57, 6 December 2024)
- ML20212A319 + (01:56:58, 6 December 2024)
- ML20212A317 + (01:56:59, 6 December 2024)
- ML20212A316 + (01:56:59, 6 December 2024)
- ML20212A315 + (01:57:00, 6 December 2024)
- PNO-V-90-010, on 900320,facility Entered TS 3.0.3 After Engineering Organization Determined Main Steam Flow Trip Setpoints Were Incorrect & Nonconservative.Plant Shutdown Began IAW TSs + (01:57:01, 6 December 2024)
- ML20212A313 + (01:57:01, 6 December 2024)
- ML20212A308 + (01:57:02, 6 December 2024)
- ML20212A310 + (01:57:02, 6 December 2024)
- ML20212A307 + (01:57:03, 6 December 2024)
- ML20212A305 + (01:57:03, 6 December 2024)
- ML20212A303 + (01:57:04, 6 December 2024)
- ML20212A302 + (01:57:05, 6 December 2024)
- ML20212A301 + (01:57:06, 6 December 2024)
- ML20212A300 + (01:57:06, 6 December 2024)
- IR 05000029/1986005 + (01:57:20, 6 December 2024)
- PNO-V-90-011, on 900919,Vice President Nuclear DW Cockfield Announced Resignation After Being in Position Since March 1987.TD Walt Will Serve as Vice President-Nuclear Until Licensee Identify Replacement + (01:57:20, 6 December 2024)
- ML20212A294 + (01:57:21, 6 December 2024)
- IR 05000275/1987007 + (01:57:22, 6 December 2024)
- ML20212A292 + (01:57:22, 6 December 2024)
- IR 05000455/1986016 + (01:57:24, 6 December 2024)
- ML20212A290 + (01:57:24, 6 December 2024)
- ML20212A288 + (01:57:25, 6 December 2024)
- ST-HL-AE-1932, Forwards Annotated Changes to FSAR Section 9.4.4.2.2 & Tables 9.4-1 & 9.4-2.4 Re Turbine Generator Bldg Supplementary HVAC Sys.Changes Based on Deletion of HVAC for Condensate Polishing Control Cabinets + (01:57:25, 6 December 2024)
- 05000352/LER-1987-003, :on 870122,control Room Ventilation Sys Isolated & a Train of Control Room Emergency Fresh Air Supply (CREFAS) Sys Initiated.Caused by Design Deficiency. Control Room Ventilation Isolation Reset + (01:57:28, 6 December 2024)
- ML20212A284 + (01:57:28, 6 December 2024)
- IR 05000443/1986036 + (01:57:36, 6 December 2024)
- NG-97-1834, Forwards Rev 0 to GE-NE-B1100716-01, Duane Arnold RPV Surveillance Matls Testing & Analysis, IAW 10CFR50,App H. Adjusted Ref Temperture (ART) Was Predicted for Each Beltline Matl,Based on Methods of RG 1.99,rev 2 + (01:57:38, 6 December 2024)
- ML20212A279 + (01:58:26, 6 December 2024)
- ML20212A278 + (01:58:27, 6 December 2024)
- ST-HL-AE-5770, Submits Rev 10A to South Tx Project Physical Security Plan, Per 10CFR50.54(p)(2).Plan Withheld + (01:58:27, 6 December 2024)
- ML20212A274 + (01:58:28, 6 December 2024)
- 05000320/LER-1987-001-02, :on 870123,return to Svc Criteria of Procedure 4210-SUR-3811 Not Performed Properly.Caused by Personnel Error.Procedure Revised to Identify Required Actions + (01:58:31, 6 December 2024)