a OPERATING DATA REPORT coo****************************w********************************************
Docket No. 50-317 February 11,1987 Prepared by-C. Behnke
-Tel. (301) 260-4871
- 1. UNIT NAME Calvert Cliffs Unit 1
- 2. REPORTING PERIOD January.1987 3.
LICENSED THERMAL POWER (MWT) 2700
- 4. NAMEPLATE RATING (GROSS MWe) 913 5.
DESIGN ELECTRICAL RATING (NET MWe) 845
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) 860
- 7. MAXIMUM DEPENDABLE CAPACITY (NET MWe) 825 8.
CHANGE IN CAPACITY RATINGS none 9.
POWER LEVEL TO WHICH RESTRICTED n/a
- 10. REASONS FOk RESTRICTIONS n/a Cumulative This Month Year to Date to Date
- 11. HOURS IN REPORTING PERIOD 744 744 102,877
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 633.7 633.7 80441.4 4
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3019.4
- 14. HOURS GENERATOR ON LINE 369.0 369.0 78584.9
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
'16.
GROSS THERMAL ENERGY GENERATED (MWH) 898,277 898,277 196,428,672
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 301,192 301,192 64,991,185
- 16. NET ELECTRICAL ENERGY GENERATED (MWH) 277,222 277,222 62,024,320
- 19. UNIT SERVICE FACTOR 49.6 49.6 76.4
- 20. UNIT AVAILABILITY FACTOR 49.6 49.6 76.4
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 45.2 45.2 73.3
- 22. UNIT CAPACITY FACTOR (USING DER NET) 44.1 44.1 71.3
- 23. UNIT FORCED OUTAGE RATE 2.9 2.9 8.6
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
None SO4\\\\\\
AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-317 Calvert Cliffs Unit No. 1 Date: February 10,1987 Completed by C. Behnke Telephone: (301) 260-4871 JANUARY Average Daily Power Level Average Daily Power Level Day (MWe-Net)
Day (MWe-Net) 1 0
17 848 2
0 18 849 3
0 19 848
-4 0
20 859 5
0 21 872 6
0 22 373 7
0 23 873 8
0 24 873 9
0 25 875 10 0
26 877 11 0
27 657 12 0
28 0
13 243 29 0
14 615 30 0
15 796 31 171 16 846
.h IJNIT SillTI1XM#iS AND IUWIR REIMICTIONS IXX' KIN' NO.
50-317 IINIT NAM? Calvert Cliffs _-1 DA*ni February 11, 1987 COMPI.E'IT.D IlY C. Behnke REIURT M)N111 JANUARY
'IT.I.EPilONF.
(301) 260-4871 l
en o
o c-ei o be p C
,o {
,c g 1.icensen p
yg raisse & Cori ect.ive c
-a No.
Dat e h b.
p a m
ouo I; vent-u o t
Ac t. i on I o no o
rpe my o
=
g gjg Reixu t. //
g7 u
Prevent. Recuri enre H
. us.c u
8 87-01 870101 S
286.3 C
NA NA ZZ ZZZZZZ Continued shutdown for refueling and 10 year ISI.
87-02 870127 F
88.7 G
2 87-03 PA VALVEX Loss of instrument air due to inadvertant isolation of instrument air header.
1.
Engineering evaluation to increase reliability.
2 CSO review with operators to ensure proper valve line-ups.
I F:
l o re cci Reason:
Eh41HHl:
lhl'ilt i l' (;" I t'%I Cl I""M S: Sclu cinical A-l'.<pii gwnent Fa i lure (Explain) 14 tuinal for Prei>arat. inn of Data ll-Maintcnance or Test 241.iniial Sci ani.
I:nl ry Sheet s l'or I.irense C-Refueling 3-Ant enuatic Scram.
I; vent Regun l. (l.I.R) Fi le D-Regulat ory Rest riction 1-Ot lu t- (thplain)
( NIHI (1 -0161 )
E-Operal or Training & I.irense I.xamilial.lon F-A<lmi n i st. rat i ve 5 151:11:i1. I - Sanw? b.oitree G-Ilporal..nonal l'eror (lixpla.in)
Il-Ollier (Explain)
~~.
OPSRATING DATA REPORT coco ************************************************************************
Docket No. 50-318 February 11, 1987 Prepared by C. Behnke Tel. (301) 260-4871
- 1. UNIT NAME Calvert Cliffs Unit 2
- 2. REPORTING PERIOD January 1987 3.ELICENSED THERMAL POWER (MWT) 2700
- 4. NAMEPLATE RATING (GROSS MWe) 918 5 ~. DESIGN ELECTRICAL RATING (NET MWe) 845
- 6. MAXIMUM DEPENDABLE CAPACITY (GROSS MWe) 860
- 7. MAXIMUM DEPENDABLE CAPACITY-(NET MWe) 825-
- 8. CHANGE IN CAPACITY RATINGS none
.9.
POWER LEVEL TO WHICH RESTRICTED n/a
- 10. REASONS FOR RESTRICTIONS n/a Cumulative This month Year to Date to Date
- 11. HOURS IN REPORTING PERIOD 744 744 86,232 12.. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 72,730.0
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1296.6
- 14. HOURS GENERATOR ON LINE 744.0 744.0 71,564.0
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,978,824 1,978,824 180,295,679
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 667,576 667,576 59,505,088
- 18. NET ELECTRICAL ENERGY GEN'TED(MWH) 640,695 640,695 56,797,618 19.. UNIT SERVICE FACTOR 100.0 100.0 83.0
- 20. UNIT AVAILABILITY FACTOR 100.0 100.0 83.0
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 104.4 104.4 79.8
- 22. UNIT CAPACITY FACTOR (USING DER NET) 101.9 101.9 77.9
~ 23. UNIT FORCED OUTAGE RATE 0.0 0.0 5.8
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):.
Refueling Shutdown:
March 14, 1987 to May 22, 1987 (69 days) 2
y '; t AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-318 Calvert Cliffs Unit No.-2 Date: February 10,1987 Completed by C. Behnke Telephone: (301) 260-4871 JANUARY
' Average Daily Power Level Average Daily Power Level Day Day (MWe-Net) 1 874 17 635 2
874 18 856 3
871 19 873 4
869 20 872 5
871 21 873 6
872 22 872 7
874 23 873 8
873 24 871 9
870 25 871 10 871 26 873 11 874 27 872 12.
872 28 870 13 873 29 872 14 872 30 872 15 873 31 872 16 864 i
,.. ~.
-. - - - ~. - -
p,
,1 :
UNIT SIRTI1XM@ls AND l'UWIR RI:IMK'TIONS IX K'KI;T Nil.
50-318 IINIT NAPE Calvert Cliffs-2 DA'll? February 11, 1987-COMPl. INT.1) IlY C. Be*nnke RF.14RT PS)N'I11 JANUARY
'll?I.I:11N)NI; (301) 260-4871 m:.
o a
C ei o bD a C
o "m c
co 1.irensee E
c'n Caisse & Cort crt.i ve v
- c sL o
tao o -t o
No.
Dat e o.
p 5 m
ouo l; vent.
ao 7
Art.ieni t o my co e
aux c
_=.
g gjg Reixmt. //
(g u
l'avvesit. Reenrivnce w
.,. m.s u
8 1
87-01 870116 S
32.6 B
NA NA HH MECFUN Reduced power to 73% for Steam Generator Feed Pump testing.
I 3
l':
l'orceil Reason:
M'tlio<l:
1 xliiltil G IHslCl I"'89 S:
Sclie<lnic<l A-l'.ipii gwix iit, l'a i lure ( F.xpl a i n )
I - H uisia l l'oe' l'reparat. ion ol' Dat a Il-Maint.enance or Test.
2-Hiniial Setam.
lint y Slicet s I'or I.irense C-Ref'neling 3-Antomat,ie Scram.
I: vent. Regun l. (lI R) FiIe D-Regulat.ory Rest,rict. ion 1-ot lier (1:xplain)
( NURI A -0161 )
l;-Ogx at.on Tr airiisig K, l.ircisse l'.xaitiirial. inst F-A<lmi n i si rat.i vc 5 l'.xliiln i t. I - S:mw: Soia re G-Ogx rat..n onal F.rt or (l'.xplain)
Il-Ot lier (1:xplain) i
.v...
L February 5,1987 REFUELING INFORMATION REQUEST 1.
Name of Facility: Calvert Cliffs Nuclear Power Plant, Unit No.1
- 2.
Scheduled date for next Refueling Shutdown: March 26,1988
- 3.
Scheduled date for restart following refueling: May 12,1988 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Resumption of operation after refueling will not require changes to Technical Specifications.
- 5.
Scheduled date(s) for submitting proposed licensing action and supporting information.'
[
February 5,1988
- 6.
Important licensing considerations associated with the refueling.
Reload fuel will be similar to that reload fuel inserted into Calvert Cliffs Unit 2 eighth cycle.
- 7.. The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217 (b) 1050 i
Spent Fuel Pools are common to Units 1 and 2 8.
(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
(a) 1830 (b)0 9.
The projected date of the last refueling that can be discharged to the Spent Fuel Pool 1
assuming the present licensed capacity and maintaining space for one full core off load.
April,1991
- Changed since last report r
i
_. - - _.., ~. -. -. _ _ _. _. - -. - _,, - _ _
s February 5,1987 REFUELING INFORMATION REQUEST
- 1. hame of Facility: Calvert Cliffs Nuclear Power Plant, Unit No. 2.
- 2. Scheduled date for next refueling shutdown: March 14,1987.
- 3. Scheduled date for restart following refueling: May 22,1987.
- 4. Will refueling or resumption of operation thereafter require a technical specification change or other licensed amendment?
Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core.
- 5. Scheduled date(s) for submitting proposed licensing action and supporting information.
February 13,1987
- 6. Important licensing considerations associated with refueling.
Reload fuel will be similar to that reload fuel inserted in the previous cycle.
- 7. The number of fuel assemblies (a) in the core and (b) in the Spent Fuel Storage Pool.
(a) 217 (b) 1050 Spent Fuel Pool is common to Units 1 and 2.
- 8. (a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been required or is planned, in number of fuel assemblies.
(a) 1830 (b)0
- 9. The projected date of the last refueling that can be discharged to the Spent Fuel Pool assuming the present licensed capacity and maintaining space for one full core off load.
April,1991
l 4
BALTIMORE 1
GAS AND ELECTRIC CHARLES CENTER P.O. BOX 1475 BALTIMORE, MARYLAND 21203 JAMES R. LEMONS MANAGER NUCLEAR OPERATsoNS DEPARTMENT February 12, 1987 Director, Office of Inspection and Enforcement U.S.
Nuclear Regulatory Commission Washington, D.C.
20055 Attention:
Document Control Desk
Subject:
January Operating Data Reports for Calvert Cliffs Units 1 and 2 (Dockets 50-317 and 50-318)
Gentlemen:
The subject reports are being sent to you as required by Technical Specification 6.9.1.6.
If there are any questions, please contact Carl Behnke, (301) 260-4871.
Sincerely, y11 w
J.
. Lemons Manager-Nuclear Operations Department JRL/CB/tyk Enclosures cc:
M.
Beebe (NRC)
V.
P. O'Grady (BG&E)
E. K. Bewley (BG&E)
D. Reilly (INPO)
T.
Foley (NRC)
P. Ross (NRC)
K. Gibbard (DOE)
J. A. Tiernan (BG&E)
S. A. McNeil (NRC)
E. Wenzinger (NRC)
W. J.
Lippold (BG&E)
Technical Librarian T. Magette (DNR)
File K. Gromack (CE)
,l
,