ML20212A308

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec Page 207 Re Limiting Conditions for Operation & Surveillance Requirements for Chemical/Oily Waste Subsystems.Diagram Encl
ML20212A308
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 12/17/1986
From:
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
Shared Package
ML20212A265 List:
References
NUDOCS 8612220373
Download: ML20212A308 (6)


Text

.

PBAPS Unit 2 LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REQUIREMENTS may be used.to estimate flow.~

f.

If the requirements of 3t8.B.3.a, 3.8.B.3.b, 3.8.B.3 c, 3.8.B.3.d, or 3.8.B.3.e, cannot be met, suspend release of radio-active offluents via this pathway.

g.

With less than the minimum number of radioactive licuid radwaste monitors OPERABLE exert best efforts to return the instruacnts to OPERABLE status within 30 days and if unsuccessful explain in the next Semi-

+

Anaual Radioactive Effluent Reics e Report why the inoperability.was not corrected in a timely manner.

4.

All liquid effluent releases 4a. -Doses due to liquid at and beyond the SITE BOUNDP.RY effluent releases to shall be proce sed through otte of areas at and beyond the the Radwaste subsystems or SITE BOUNDARY shall be combinations of these subsystems projected once per month listed below, prior to release *:

in accordance with the methodology and parameters (1)

The Waste Collector Filter in the ODCM.

and Demineralizer (ii)

The Floor Drain Filter 4b.

The waste' collector filter (iii) The Fuel Pool Filter and demineralizer and the

]

Demineralizer Floor Drain Filter shall be (iv)

The Chemical / Oily demonstrated operable ence Waste Cleanup Subsystem per quarter, unless utilized to process

  • Whenever the release (s) would liquid waste during the cause the projected dose, when it previous 13 weeks, by is averaged over one month to analyzing the liquid exceed 0.12 mrem to the total processed through the body or 0.4 mrem to any organ subsystem and determining (ccmbined total from the two that it meets the reactors at the site).

requirements of Specification 3.8.B.l.

The fuel pool With liquid waste being filter demineralizer discharged without treatment as and the chemical /

required above, prepare and oily-waste cleanup submit to the Commission within subsystem are exempt 21 working days pursuant to from this requirement Specification 6.9.2, a Special because they are alternate Report which includes the treatment subsystems and/or following information:

are used only periodically a.

Explanation of why liquid for batch treatment of liquids radwaste was which are analyzed prior to being released and are 8612220373 861217 i

PDR ADOCK 05000277 P

PDR

-207-

PBAPS Unit 3 LIMITING CONDITIONS FOR OPERATION SURVEILLANCE REGUIREMENTS may be used to estimate flow.

f.

If the. requirements of 3.0.B.3.a, 3.8.B.3.b, Y^

3.8.B.3.c, 3.8.B.3.d, or 3.8.B.3.e, cannot be met, suspend release of radio-active effluents via this pathway.

g.

With less than the mia.imum i

number of radioactier liquid f

radwaste monitors OPERABLE exert best efforts la r'eturn the instrumer.ts to OPERABLE status within 10 days and if unsuccessful explain in the next !!emi-Annual Radioactive Sifluent Release Report why the inoperability was not corrected in a ti.nely manner.

4.

All liquid effluent rel2ases 4a.

Doaes due to liquid at and beyond the SITE BOUNCARY efflt ent releases to shall be processed thrcugh one of a re at, at and beyond the the Radwaste subsystems or SITC 3OUNDAl%Y shall be combinationr, of tnese subsystems projacted once per month listed bele,w, prior to release *:

in accordance with th?

methodology and parameters (1)

The Naste Collector Filter in the ODCM.

and Demineralizer (ii)

The Floor Drain Filter 4b.

The waste collector filter (iii) The Fuel Pool Filter and demineralizer and the Demineralizer Floor Drain Filter shall be (iv)

The Chemical / Oily demonstrated operable once Waste Cleanup Subsystem per quarter, unless utilized tc process

  • Uhenever the release (s) would liquid waste during the cause the projected doce, when it previcus 13 weeks, by is averaged over one month to analyzing the liquid exceed 0.12 mrem to the total processed through the bcdy or 0.4 mrem to any organ subsystem and determining (combined total from the two that it meets the reactors at the site).

requirements of Specification 3.8.B.l.

The fuel pool With liquid waste being filter demineralizer discharged without treatment as and the chemical /

required above, prepare and oily-waste cleanup submit to the Commission within subsystem are exempt 21 working days pursuant to from this requirement Specification 6.9.2, a Special because they are alternate i

Report which includes the treatment subsystems and/or following information:

are used only periodically a.

Explanation of why liquid for batch treatment of liquids radwaste was which are analyzed prior to being released and are

-207-

4 ADDITION HOPPER OFF-STANDARD RECYCLE CHEMICAL {

yV

-WASTE V

I AC I

l V

TANK l

W LAUNDRY l LAUNDRY j

OIL SKI!OfER

DRAIN TAI."4 l

k' DRAIN TANK e

n

.. 4 u.

Vl

'il

.J V

s

'l

,i m

lI h _.

TO CIRC s

WATER SYS.

h

>it

-.m

_AC l

r i

i l FILTER!

h r

I e

CHEMICAL / OILY WASTE i

TR EATM ENT I. I_ >__ _._._. _.._

SUBSYSTEM PBAPS.

PROPOSED NEW FILTRIsTION SUBSYSTEM u

i a.

v

3 e

3 d =i E.

=

p i.d.l a

=.

g e]

gE:es i.

s Ai m r.

rya s!:::s:

a B

c I ! f. a v,

s a e

da

-.0 ::

c.

o de !

5

  • J

$0 y

s"

>d C -f* @-

o g2 L

i !

B O-GI-4>o :

3;s-y

.8.n i1 8

@< e-r ;i l

r

,r-

.u

. i!!!

18 F.?

I

)I p

i.

3 r

r jl l

,!!' ! 1

.~

r s ".

I m @[iD@

T I

i,i,j lNi$di

!!Y i

I;!

l

$l" Il I

,5 3

! !! 6,f(p[i;;;rn(

!gigg 3:;. 1 g

J,.

-::n r-s I)!l 9

1 e

j I

l l l 3 L-O

$ 111 -G-D-a >-

!! ii !:

1 a

A;i[

fij B !! Il ~ 97fp @rU@

J

~.-

1_.

F84,

_,w to-hyp=77iJ g_.ja: - - - - jjj-i 3i 1

!)I i n,I t.

e

._p i

. S 4:

5 s--

!I id!!plcpskl j!!

p

==m!!c t=t

k. I a

,!!h

!!r s&.3';}cgns.:

i g

m

.=::a-ini ]p:

i:!

R

,!jt5.3.

j:y-Q'y;g.

IL mm3

-.I ;g m.=m;-- !!!

y; w

3j,,j g,

. :::.'..."/:';: eq.,

x 3

s.3 l,i, i=3

=

3 3

,i i

,n

.p

(".3 rges -._. _

y j,.3yau N-!t',y!d81,.J@!-j f

i s

Ilh

!!i

?';

,l li d

6 fp 1 W'T-- j- _-3 llLI.h !! ;k!!!

'i!143

.;!1,-%

ld i

,h dl V i

!ai 2

,s l

ai f

_.i o

m L

~1 7

i 7l-S fG

$5l to

^>1(L it

, A
  • m

!G4

'A 4 I

f G O (T,J h

=

,5!

1j!

ii!

,l fi !

2 it 22,3 s 3:

1 i;d; 2

3

's E i: e s J.t i,

I 0

C" I

4W9 90 ff

@W j

is}

==.

mee -eseen 11 i,

CERTIFICATE CF SERVICE I certify that service of the foregoing Application was made upon the Commonwealth of Pennsylvania, by mailing a copy thereof, via first-class mail, l

to Thomas R. Gerusky, Director, Bureau of Radiological Protection, P. O. Box 2063, Harrisburg, PA 17120; all this 17th day of December, 1986.

y VI

(,7 HuprAJ.-Bradley

(

Attorney for Philadelphia Elec:ric Company i

[

f

.